← Back
Factory, industrial, miscellaneous
32-07 QUEENS BOULEVARD
QUEENS · BIN 4003434
💬 Discuss this project
1951Year Built
3Stories
F9Building Class
M1-4Zoning
301,000 sfGross Floor Area
1Units
LL97 Covered7 Open Violations 6 unresolved · 1 paperwork only ▸
Factory, industrial, miscellaneous · Owner of record: SWINGSTELL OWNER LLC · 85,000 sf lot · 3.54 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanicalPlumbingFire Protection
Permit Issued — active, not yet Signed-off
Roof16p · 3 filings · 20 docs
Bulkhead1p · 1 filing · 4 docs
Floor 43p · 1 filing · 20 docs
Floor 3
Floor 2
Floor 1Under Construction12p · 4 filings · 20 docs
Mezzanine2p · 1 filing · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
PLATINUM SERVICES NY808/04/2026
RELIABLE ENTERPRISES907/08/2026
STELLAR MANAGEMENT6207/08/2026
SKILLMAN TENNIS ASSOCIATES107/08/2026
SAFELINE GROUP1007/08/2026
SWINGSTELL OWNER LLC103/22/2026
EUROPA GENERAL CONTRACTIN303/22/2026
FIRST PIONEER PROPERTI103/22/2026
SWINGLINE INC.203/22/2026
SWINGLINIZ INC.103/22/2026
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
SNR EXPEDITING DESIGN603/21/2026
NODE ARCH ENGIN CONSULT203/21/2026
RAYMOND HO ARCHITECT403/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
EUROPA GENERAL CONTRACTINGeneral Contractor707/08/2026
PLATINUM SERVICES NY LLCGeneral Contractor508/04/2026
SAFELINE GROUP INCGeneral Contractor307/08/2026
THE HARVEY GROUP LLCGeneral Contractor303/21/2026
SPEEDWAY PLUMBING CORPPlumbing207/08/2026
RELIABLE ENTERPRISES INCGeneral Contractor207/08/2026
PYRAMID RESTORATION NY LLGeneral Contractor107/08/2026
A & B CONTRACTING SVCS INGeneral Contractor107/08/2026
WILLDAN ELECTRICAL OF NYElectrical103/22/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
INTEGRITY CONSULTING SERV666506/12/2026
RAYMOND HO ARCHITECT, PLL1654306/04/2026
STE5741206/04/2026
KINETIC SERVICES ENGINEER5807104/28/2026
PACE ENGINEERING P.C.1679204/08/2026
Building Lifecycle
All (148)Filed (28)Permit Issued (18)Signed Off (5)Violation (60)Inspection (7)Special Inspection (30)
08/05/2026
Signed off — Alteration
Q01322135-I1
08/03/2026
Permit issued — Sidewalk Shed
Q01355867-I1-SH
07/13/2026
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
07/09/2026
Filed — Alteration
Q01425659-I1
07/09/2026
Permit issued — Protection and Mechanical Methods
Q01425659-I1-PMM
07/08/2026
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
07/03/2026
Inspection — Certified Sprinkler (PL)-Sprinkler-Hydro
Certified
View inspection ↗
06/17/2026
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
06/12/2026
Filed — Alteration
Q01348343-S4
06/08/2026
Special inspection requirement — Sprinkler Systems
DAVID TENG
06/04/2026
Filed — Alteration
RE-ROUTE EXISTING MECHANICAL DUCTWORKS AND ADD NEW REGISTERS FOR NEW COMMERCIAL SPACE AT 1ST FLOOR. SCOPE OF WORKS AS SHOWN IN PLANS. NO CHANGE IN EGRESS, OCCUPANCY OR USE.
Q01269771-P2
06/04/2026
Filed — Alteration
RELOCATE AND ADD NEW SPRINKLER HEADS ON THE 1ST FLOOR COMMERCIAL SPACE. SCOPE OF WORKS AS SHOWN IN PLANS. NO CHANGE IN EGRESS, OCCUPANCY OR USE.
Q01269776-P2
06/04/2026
Filed — Alteration
INSTALL NEW FIRE RATED PARTITION AT THE 1ST FLOOR COMMERCIAL SPACES. NO CHANGE IN EGRESS, OCCUPANCY OR USE.
Q01240810-P2
06/04/2026
Filed — Alteration
Q01382260-P1
06/03/2026
Special inspection requirement — Structural Steel - High Strength Bolting
ALEKSANDR LEVIN
06/03/2026
Special inspection requirement — Structural Stability – Alterations of existing buildings
ALEKSANDR LEVIN
06/03/2026
Special inspection requirement — Structural Steel - Welding
ALEKSANDR LEVIN
06/03/2026
Special inspection requirement — Structural Steel - Details
ALEKSANDR LEVIN
06/03/2026
Special inspection requirement — Post-installed Anchors
ALEKSANDR LEVIN
06/03/2026
Special inspection requirement — Open-web Steel Joists and Joist Girders
ALEKSANDR LEVIN
06/03/2026
Special inspection requirement — Structural Cold-Formed Steel
ALEKSANDR LEVIN
06/03/2026
Special inspection requirement — Final
ALEKSANDR LEVIN
05/20/2026
Permit issued — Mechanical Systems
Q01322135-I1-MS
05/20/2026
Special inspection requirement — Final
PING MAN HO
05/20/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
PING MAN HO
05/20/2026
Special inspection requirement — Fire-Resistance Rated Construction
PING MAN HO
05/19/2026
Filed — Alteration
Q01348343-S3
05/19/2026
Filed — Alteration
Q01348343-S1
05/19/2026
Filed — Alteration
Q01348343-S2
05/15/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
ALEKSANDR LEVIN
05/14/2026
Special inspection requirement — Sprinkler Systems
ALEKSANDR LEVIN
05/14/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
ALEKSANDR LEVIN
05/11/2026
Permit issued — Supported Scaffold
Q01355867-I1-SH
05/08/2026
Permit issued — General Construction
Q01296767-I1-GC
05/06/2026
Permit issued — Plumbing
Q01382260-I1-PL
04/30/2026
Permit issued — Plumbing
Q01382260-I1-PL
04/28/2026
Filed — Alteration
Q01322135-I1
04/11/2026
Special inspection requirement — Structural Stability – Alterations of existing buildings
Baris Acar
04/11/2026
Special inspection requirement — Masonry
Baris Acar
04/11/2026
Special inspection requirement — Final
Baris Acar
04/11/2026
Special inspection requirement — Energy Code Compliance Inspections
Baris Acar
04/10/2026
Filed — Alteration
INSTALL NEW FIRE RATED PARTITION AT THE 1ST FLOOR COMMERCIAL SPACES. NO CHANGE IN EGRESS, OCCUPANCY OR USE.
Q01240810-P1
04/10/2026
Filed — Alteration
RE-ROUTE EXISTING MECHANICAL DUCTWORKS AND ADD NEW REGISTERS FOR NEW COMMERCIAL SPACE AT 1ST FLOOR. SCOPE OF WORKS AS SHOWN IN PLANS. NO CHANGE IN EGRESS, OCCUPANCY OR USE.
Q01269771-P1
04/10/2026
Filed — Alteration
RELOCATE AND ADD NEW SPRINKLER HEADS ON THE 1ST FLOOR COMMERCIAL SPACE. SCOPE OF WORKS AS SHOWN IN PLANS. NO CHANGE IN EGRESS, OCCUPANCY OR USE.
Q01269776-P1
04/09/2026
Filed — Alteration
Q01382260-I1
04/08/2026
Filed — Alteration
Q01296767-P1
04/07/2026
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
04/02/2026
Special inspection requirement — Fire-Resistance Rated Construction
PING MAN HO
04/02/2026
Special inspection requirement — Final
04/02/2026
Special inspection requirement — Mechanical Systems
04/02/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
PING MAN HO
04/02/2026
Special inspection requirement — Final
PING MAN HO
02/24/2026
Filed — Alteration
Q01348343-I1
02/13/2026
Special inspection requirement — Exterior Insulation and Finish Systems (EIFS)
ALEKSANDR LEVIN
02/13/2026
Special inspection requirement — Fire-Resistance Rated Construction
ALEKSANDR LEVIN
02/13/2026
Special inspection requirement — Energy Code Compliance Inspections
ALEKSANDR LEVIN
02/13/2026
Special inspection requirement — Final
ALEKSANDR LEVIN
02/13/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
ALEKSANDR LEVIN
02/13/2026
Special inspection requirement — Fenestration and door U-factor and product ratings
ALEKSANDR LEVIN
02/11/2026
Filed — Alteration
Q01355867-I1
Latest 60 of 148 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSidewalk ShedPermit IssuedPLATINUM SERVICES NY LLC08/03/2026
DOB NOWProtection and Mechanical MethodsPermit IssuedPLATINUM SERVICES NY LLC07/09/2026
DOB NOWMechanical SystemsSigned-offA & B CONTRACTING SVCS IN05/20/2026
DOB NOWSupported ScaffoldPermit IssuedPLATINUM SERVICES NY LLC05/11/2026
DOB NOWGeneral ConstructionPermit IssuedPYRAMID RESTORATION NY LL05/08/2026
DOB NOWPlumbingPermit IssuedSPEEDWAY PLUMBING CORP05/06/2026
DOB NOWPlumbingPermit IssuedSPEEDWAY PLUMBING CORP04/30/2026
DOB NOWSupported ScaffoldPermit IssuedPLATINUM SERVICES NY LLC02/11/2026
DOB NOWSupported ScaffoldPermit IssuedPLATINUM SERVICES NY LLC02/11/2026
DOB NOWGeneral ConstructionPermit IssuedTHE HARVEY GROUP LLC07/30/2025
DOB NOWSupported ScaffoldSigned-offSAFELINE GROUP INC06/25/2025
DOB NOWSidewalk ShedSigned-offSAFELINE GROUP INC06/24/2025
DOB NOWProtection and Mechanical MethodsSigned-offSAFELINE GROUP INC06/24/2025
DOB NOWGeneral ConstructionSigned-offEUROPA GENERAL CONTRACTIN02/23/2022
DOB NOWGeneral ConstructionSigned-offEUROPA GENERAL CONTRACTIN09/29/2021
DOB NOWGeneral ConstructionSigned-offEUROPA GENERAL CONTRACTIN04/19/2021
DOB NOWSupported ScaffoldPermit IssuedRELIABLE ENTERPRISES INC04/08/2021
DOB NOWSidewalk ShedPermit IssuedRELIABLE ENTERPRISES INC03/16/2021
BISMHISSUEDFINE QUALITY CONTRACTING11/29/2019
BISPLISSUEDSAMUEL & SONS P & H INC02/21/2019
BISOTISSUEDFINE QUALITY CONTRACTING12/24/2018
BISEQISSUEDBAGIANA CONSTRUCTION INC04/12/2018
BISEQISSUEDBAGIANA CONSTRUCTION INC04/12/2018
BISPLISSUEDP.S.I. MECHANICAL06/23/2017
BISEQISSUEDBAGIANA CONSTRUCTION INC04/18/2017
BISEQISSUEDBAGIANA CONSTRUCTION INC04/18/2017
BISPLISSUEDDARCI PLUMBING CO INC04/17/2017
BISFBISSUEDLARRY BERGE04/12/2017
BISOTISSUEDGEM MECHANICAL LLC04/12/2017
BISOTISSUEDSANVITO REALTY HOLDING CORP08/17/2016
BISOTISSUEDSANVITO REALTY HOLDING CORP08/17/2016
BISOTISSUEDSANVITO REALTY HOLDING CORP08/17/2016
BISPLISSUEDDARCI PLUMBING CO INC08/14/2015
BISBLISSUEDLARRY BERGE08/14/2015
BISPLISSUEDP.S.I. MECHANICAL07/31/2015
BISMHISSUEDAGO & ALAUDIN GENERAL CON06/24/2015
BISPLISSUEDP.S.I. MECHANICAL06/03/2015
BISPLISSUEDP.S.I. MECHANICAL06/03/2015
BISPLISSUEDJAG PLBG & MECH INC05/22/2015
BISOTISSUEDAGO & ALAUDIN GENERAL CON05/13/2015
+ 28 more permits on file
1 project · most recent 06/04/2026
FiledStatusContractorScope
06/04/2026——30 heads
1 project · most recent 06/04/2026
FiledStatusContractorScope
06/04/2026———
13 projects · most recent 05/06/2026
General Wiring
FiledStatusContractorScope
05/06/2026Permit IssuedRE-CON ELECTRIC INCGeneral Wiring
02/11/2026Permit IssuedRICHARD NEU—
06/25/2025Permit IssuedRICHARD NEU—
05/17/2022CompleteAMERGY ELECTRIC OF NY INCGeneral Wiring
03/15/2021Permit IssuedRICHARD NEU—
01/19/2021CompleteWILLDAN ELECTRICAL OF NYGeneral Wiring
01/06/2021CompleteWILLDAN ELECTRICAL OF NYGeneral Wiring
01/05/2021CompleteWILLDAN ELECTRICAL OF NY—
12/24/2020CompleteWILLDAN ELECTRICAL OF NY—
12/04/2020CompleteWILLDAN ELECTRICAL OF NY—
11/20/2020CompleteWILLDAN ELECTRICAL OF NY—
02/05/2020CompleteWILLDAN ELECTRICAL OF NYGeneral Wiring
01/18/2019CompleteC.Q. ELECTR'L CONTRG CORPGeneral Wiring
2 projects · most recent 05/05/2021
Sidewalk Shed Scaffold
FiledStatusContractorScope
05/05/2021Permit IssuedRELIABLE ENTERPRISES INCSidewalk Shed
04/07/2021Permit IssuedRELIABLE ENTERPRISES INCScaffold
▾Field Inspections (DOB CAP) — 7
DateTypeResultReport
07/13/2026Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
07/08/2026Pass-Final PL - Up to 3 Requested FloorsPassView ↗
07/03/2026Certified Sprinkler (PL)-Sprinkler-HydroCertifiedView ↗
06/17/2026Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
04/07/2026Pass-Final CND-Occupancy InspectionPassView ↗
05/19/2025Pass-Final CND-Occupancy InspectionPassView ↗
04/28/2025Pass-Final CND-Occupancy InspectionPassView ↗
▾Special Inspection Requirements (DOB NOW) — 41
DateRequirementInspectorRole
06/08/2026Sprinkler SystemsDAVID TENGspecial
06/03/2026Structural Steel - High Strength BoltingALEKSANDR LEVINspecial
06/03/2026Structural Stability – Alterations of existing buildingsALEKSANDR LEVINspecial
06/03/2026Structural Steel - WeldingALEKSANDR LEVINspecial
06/03/2026Structural Steel - DetailsALEKSANDR LEVINspecial
06/03/2026Post-installed AnchorsALEKSANDR LEVINspecial
06/03/2026Open-web Steel Joists and Joist GirdersALEKSANDR LEVINspecial
06/03/2026Structural Cold-Formed SteelALEKSANDR LEVINspecial
06/03/2026FinalALEKSANDR LEVINprogress
05/20/2026FinalPING MAN HOprogress
05/20/2026Fire-Resistant Penetrations and JointsPING MAN HOspecial
05/20/2026Fire-Resistance Rated ConstructionPING MAN HOprogress
05/15/2026Fire-Resistant Penetrations and JointsALEKSANDR LEVINspecial
05/14/2026Sprinkler SystemsALEKSANDR LEVINspecial
05/14/2026Fire-Resistant Penetrations and JointsALEKSANDR LEVINspecial
04/11/2026Structural Stability – Alterations of existing buildingsBaris Acarspecial
04/11/2026MasonryBaris Acarspecial
04/11/2026FinalBaris Acarprogress
04/11/2026Energy Code Compliance InspectionsBaris Acarprogress
04/02/2026Fire-Resistance Rated ConstructionPING MAN HOprogress
04/02/2026Final—progress
04/02/2026Mechanical Systems—special
04/02/2026Fire-Resistant Penetrations and JointsPING MAN HOspecial
04/02/2026FinalPING MAN HOprogress
02/13/2026Exterior Insulation and Finish Systems (EIFS)ALEKSANDR LEVINspecial
Latest 25 of 41.
▾Documents — 563 on file (BIS + DOB NOW)
▸Plans & Drawings28
▸DOB NOWPlans/Sketch28
08/27/2026Q00495789-I1Request digital key ↗
08/27/2026Q00493095-I1Request digital key ↗
08/27/2026Q00486208-P1Request digital key ↗
Showing 3 of 28 on file for this type
▸Applications & Permits109
▸BISPLAN / WORK APPROVAL APPLICATION53
12/17/2020421470205Open ↗
08/26/2020421470205Open ↗
12/15/2018421692412Open ↗
Showing 3 of 53 on file for this type
▸BISWORK PERMIT APPLICATION44
12/05/2019421692412Open ↗
02/21/2019421692412Open ↗
01/05/2019421692412Open ↗
Showing 3 of 44 on file for this type
▸BISNon-Directive 14 Construction Sign Off Including Sign Applications5
01/24/2018420588670Open ↗
10/13/2017420588670Open ↗
10/03/2017420188692Open ↗
Showing 3 of 5 on file for this type
▸BISApplication Withdrawal/Address Change Form OP-1134
12/17/2020421470205Open ↗
12/17/2020421470205Open ↗
05/30/2017402015644Open ↗
Showing 3 of 4 on file for this type
▸BISPLACE OF ASSEMBLY1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISRescission of Intent to Revoke Approval/Permit1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISPLACE OF ASSEMBLY APPLICATION1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Zoning, Tax Lot & Property Records2
▸DOB NOWZD1: DOB Zoning Diagram2
08/16/2026Q01348343-I1Open ↗
08/13/2026Q01348343-I1Open ↗
▸Seals & Professional Certifications143
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION40
01/05/2019421692412Open ↗
01/05/2019421692412Open ↗
01/05/2019421692412Open ↗
Showing 3 of 40 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature28
08/27/2026Q00486208-I1Open ↗
08/27/2026Q00486208-P1Open ↗
08/19/2026Q01244544-I1Open ↗
Showing 3 of 28 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST16
08/29/2016421346877Open ↗
08/25/2016421346868Open ↗
08/25/2016421352173Open ↗
Showing 3 of 16 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT15
04/21/2017421470205Open ↗
04/21/2017421470205Open ↗
04/17/2017440398543Open ↗
Showing 3 of 15 on file for this type
▸DOB NOWProgress Inspector Seal & Signature11
09/01/2026Q00493095-I1Open ↗
09/01/2026Q01348343-S4Open ↗
08/30/2026Q01348343-I1Open ↗
Showing 3 of 11 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature11
09/01/2026Q01348343-S1Open ↗
09/01/2026Q01348343-S4Open ↗
08/30/2026Q01348343-I1Open ↗
Showing 3 of 11 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM9
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 9 on file for this type
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION6
04/17/2017440398543Open ↗
04/17/2017440398552Open ↗
Showing 2 of 6 on file for this type
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY6
04/17/2017440398543Open ↗
04/17/2017440398552Open ↗
Showing 2 of 6 on file for this type
▸BISPC FULL REPORT1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Trade Schedules & Equipment31
▸BISSELF-CERT PLUMBING NOTICE12
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 12 on file for this type
▸BISSCHEDULE B - PLUMBING9
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 9 on file for this type
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE4
12/11/2018421692412Open ↗
04/21/2017421470205Open ↗
Showing 2 of 4 on file for this type
▸BISSCHEDULE C - HEATING & COMBUSTION EQUIPMENT2
04/21/2017421470205Open ↗
Showing 1 of 2 on file for this type
▸BISEQUIPMENT USE APPLICATION/PERMIT2
01/24/2018420588670Open ↗
Showing 1 of 2 on file for this type
▸BISEQUIPMENT USE PERMITS1
01/24/2018420588670Open ↗
▸BISSCHEDULE C - HEATING & COMBUSTION EQUIPMENT1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Safety & Tenant Protection6
▸BISSTREET TREE CHECKLIST5
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 5 on file for this type
▸BISTenant Protection Plan and Notes1
11/10/2018421692412Open ↗
▸Environmental & Asbestos35
▸DOB NOWDEP ACP-5: Asbestos Assessment Report18
08/17/2026Q01240810-P1Open ↗
08/17/2026Q01240810-I1Open ↗
08/17/2026Q01240810-P2Open ↗
Showing 3 of 18 on file for this type
▸BISASBESTOS: CERTIFICATION (DEP ACP5)11
11/10/2018421692412Open ↗
Showing 1 of 11 on file for this type
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸BISDEP ASBESTOS PROJECT COMPLETION FORM1
04/21/2017421470205Open ↗
▸BISACP5 ASBESTOS: CERTIFICATION (DEP ACP5)1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸DOB NOWDEP ACP-20/ACP-21: Asbestos Project Conditional Completion Form/Asbestos Project Completion Form1
08/18/2026Q01296767-I1Open ↗
▸Energy Compliance42
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS23
01/05/2019421692412Open ↗
10/24/2017420794901Open ↗
10/24/2017420794901Open ↗
Showing 3 of 23 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS10
08/24/2020440398552Open ↗
07/14/2020421692412Open ↗
10/24/2017420794901Open ↗
Showing 3 of 10 on file for this type
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY4
07/14/2020421692412Open ↗
Showing 1 of 4 on file for this type
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY FOR ENERGY CODE PROGRESS INSPECTIONS4
04/17/2017440398552Open ↗
Showing 1 of 4 on file for this type
▸BISELECTRICAL APPLICATION FOR SIDEWALK SHED LIGHTING1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Inspections & Test Reports10
▸BISTECHNICAL REPORT: RESPONSIBILITY10
08/24/2020440398543Open ↗
08/24/2020440398552Open ↗
07/14/2020421692412Open ↗
Showing 3 of 10 on file for this type
▸Approvals, Objections & Sign-offs66
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST35
01/27/2021402119658Open ↗
10/09/2020421692412Open ↗
08/24/2020440398543Open ↗
Showing 3 of 35 on file for this type
▸BISADMINISTRATIVE OBJECTIONS13
08/25/2016421352173Open ↗
Showing 1 of 13 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION12
08/03/2018402119658Open ↗
10/24/2017440161682Open ↗
10/24/2017420794901Open ↗
Showing 3 of 12 on file for this type
▸BISSCHEDULE A - OCCUPANCY / USE2
07/19/2018402119658Open ↗
09/07/2016402119658Open ↗
▸BISSUPERSEDING LETTER2
07/07/2017420188692Open ↗
Showing 1 of 2 on file for this type
▸BISSHED LETTER2
04/13/2018440398543Open ↗
Showing 1 of 2 on file for this type
▸Cost, Insurance & Ownership41
▸BISCOST AFFIDAVIT40
10/09/2020421692412Open ↗
12/14/2018421692412Open ↗
11/10/2018421692412Open ↗
Showing 3 of 40 on file for this type
▸BISDEPT OF FINANCE VERIFICATION1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Filing & Intake Forms43
▸BISEFILING COVER SHEET20
12/11/2018421692412Open ↗
11/10/2018421692412Open ↗
04/21/2017421470205Open ↗
Showing 3 of 20 on file for this type
▸BISBOROUGH INTAKE FORM10
04/05/2019402119658Open ↗
01/08/2018402119658Open ↗
11/16/2017402119658Open ↗
Showing 3 of 10 on file for this type
▸BISADDITIONAL INFORMATION7
02/08/2018402119658Open ↗
12/28/2017420588670Open ↗
04/17/2017440398543Open ↗
Showing 3 of 7 on file for this type
▸BISEFILING JOB APPLICATION COVER SHEET6
04/17/2017440398543Open ↗
04/17/2017440398552Open ↗
Showing 2 of 6 on file for this type
▸Other Documents7
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION2
08/26/2020421470205Open ↗
Showing 1 of 2 on file for this type
▸BISPLOT DIAGRAM1
10/07/2016402119658Open ↗
▸BISCONSTRUCTION - SUPPORTING DOCUMENTATION1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸DOB NOWSite Survey: Initial1
08/13/2026Q01348343-I1Open ↗
▸DOB NOWPlot Diagram1
08/13/2026Q01348343-I1Open ↗
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone1
08/13/2026Q01348343-I1Open ↗