← Back
Shopping center, with or without parking
32-11 BEACH CHANNEL DRIVE
QUEENS · BIN 4300870
💬 Discuss this project
1963Year Built
1Stories
K6Building Class
R6AZoning
28,025 sfGross Floor Area
10Units
LL97 Covered2 Open Violations ▸FDNY Report ↗
Shopping center, with or without parking · Owner of record: 32-11 CHANNEL REALTY LLC · 85,800 sf lot · 0.33 FAR built · Flood zone AE
Locations of Work
ArchitectureStructuralMechanicalPlumbingFire ProtectionCivilGeneral
Permit Issued — active, not yet Signed-off
RoofUnder Construction16p · 5 filings · 20 docs
Mezzanine1p · 1 filing · 3 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
32-11 CHANNEL FOOD907/08/2026
32-11 CHANNEL REALTY LLC303/22/2026
BRAVO103/21/2026
32-25 BEACH CHANNEL DRIVE QUEENS203/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
CONCEPT DESIGN GROUP604/21/2026
CQ&J CORPORATION104/21/2026
JOSE L. PENA,P.E.303/04/2021
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
CONCEPT DESIGN GROUP103/21/2026
ADAC CONSTRUCTION603/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
TAC 1 CONCEPTS INCGeneral Contractor504/09/2026
WZ CONSULTING CORPGeneral Contractor209/15/2026
YAFE MEOD CORPGeneral Contractor107/08/2026
L&J PLG & HTG CO OF NY INPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
CDG ARCHITECTS LLC /DBA:1327408/13/2025
JOSE L. PENA, P.E5969203/04/2021
AR ARCHITECT P.C.1171107/16/2020
Building Lifecycle
All (58)Filed (10)Permit Issued (7)Violation (12)Objection (16)Special Inspection (13)
09/14/2026
Permit issued — Mechanical Systems
Q01243635-I1-MS
09/14/2026
Permit issued — General Construction
Q01245793-I1-GC
04/21/2026
Filed — Alteration
Renovation to an existing storefront, and facade. No changes to use, egress, or occupancy.
Q01281723-S1
04/21/2026
Filed — Alteration
Installation of sprinkler piping and heads though the entire building, there is no change in use, egress and occupancy.
Q01341452-I1
03/24/2026
Violation issued (FDNY_ORDER, closed)
03/14/2026
Objection resolved — Addressed
02/17/2026
Permit issued — Mechanical Systems
Q01245793-S1-MS
02/17/2026
Permit issued — General Construction
Q01245793-I1-GC
02/17/2026
Permit issued — Mechanical Systems
Q01243635-I1-MS
12/31/2025
Special inspection requirement — Sprinkler Systems
12/15/2025
Objection resolved — Addressed
12/15/2025
Objection resolved — Addressed
12/15/2025
Objection resolved — Addressed
12/15/2025
Objection resolved — Addressed
12/08/2025
Objection raised — Admin
12/08/2025
Objection raised — Inspections
12/08/2025
Objection raised — Scope
12/08/2025
Objection raised — Structural
12/08/2025
Objection raised — Energy
12/01/2025
Filed — Alteration
Renovation to an existing storefront, and facade. No changes to use, egress, or occupancy.
Q01281723-I1
11/03/2025
Objection resolved — Addressed
11/02/2025
Special inspection requirement — Final
11/02/2025
Special inspection requirement — Structural Steel - Details
11/02/2025
Special inspection requirement — Structural Stability – Alterations of existing buildings
09/30/2025
Objection resolved — Addressed
09/11/2025
Objection resolved — Addressed
08/29/2025
Objection raised — Scope
08/28/2025
Objection raised — Admin
08/28/2025
Objection raised — Scope
08/13/2025
Filed — Alteration
Renovation to an existing storefront and interior of an existing commercial space as per plans submitted herewith. No changes to use, egress, or occupancy.
Q01245793-S1
08/13/2025
Filed — Alteration
Q01243635-I1
08/13/2025
Filed — Alteration
Renovation to an existing storefront and interior of an existing commercial space as per plans submitted herewith. No changes to use, egress, or occupancy.
Q01245793-I1
08/13/2025
Filed — Alteration
Renovation to an existing storefront and interior of an existing commercial space as per plans submitted herewith. No changes to use, egress, or occupancy.
Q01245793-S2
08/01/2025
Special inspection requirement — Interior lighting power
Yongho Kim
08/01/2025
Special inspection requirement — Fenestration areas
Yongho Kim
08/01/2025
Special inspection requirement — Fenestration and door U-factor and product ratings
Yongho Kim
08/01/2025
Special inspection requirement — Air barrier - visual inspection
Yongho Kim
08/01/2025
Special inspection requirement — Lighting controls
Yongho Kim
07/03/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Yongho Kim
06/24/2025
Special inspection requirement — Final
Yongho Kim
07/23/2023
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
03/09/2021
Special inspection requirement — Fire-Resistant Penetrations and Joints
Jose Pena
03/04/2021
Filed — Alteration
NEW GAS METER & GAS LINE FOR HVAC SYSTEM
Q00439942-P1
02/24/2021
Special inspection requirement — Fire-Resistant Penetrations and Joints
Jose Pena
01/11/2021
Permit issued — Plumbing
Q00439942-I1-PL
12/22/2020
Filed — Alteration
NEW GAS METER & GAS LINE FOR HVAC SYSTEM
Q00439942-I1
10/05/2020
Violation issued (FDNY_ORDER, closed)
07/23/2020
Permit issued — Mechanical Systems
Q00369320-I1-MS
07/16/2020
Filed — Alteration
Q00369320-I1
02/02/2020
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
11/02/2019
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
08/02/2019
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
05/02/2019
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
08/28/2017
Violation issued (ECB, closed)
Unknown
08/28/2017
Violation issued (ECB, closed)
Unknown
04/29/2003
Violation issued (FDNY_NOV, closed)
09/25/1991
Violation issued (FDNY_NOV, closed)
02/09/1983
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWMechanical SystemsPermit IssuedWZ CONSULTING CORP09/14/2026
DOB NOWGeneral ConstructionPermit IssuedWZ CONSULTING CORP09/14/2026
DOB NOWMechanical SystemsPermit IssuedTAC 1 CONCEPTS INC02/17/2026
DOB NOWGeneral ConstructionPermit IssuedTAC 1 CONCEPTS INC02/17/2026
DOB NOWMechanical SystemsPermit IssuedTAC 1 CONCEPTS INC02/17/2026
DOB NOWPlumbingSigned-offL&J PLG & HTG CO OF NY IN01/11/2021
DOB NOWMechanical SystemsSigned-offYAFE MEOD CORP07/23/2020
BISMHISSUEDA&A BUILDING CONSULTANTS06/10/2016
BISFPISSUEDCITYWIDE FIRE SYS PLBG EN02/24/2016
BISMHISSUEDA&A BUILDING CONSULTANTS02/22/2016
BISPLISSUEDPRECISION PLBG SVCS., INC10/16/2015
BISMHISSUEDGREENLINE DEVELOPERS LLC07/16/2015
BISSPISSUEDJOHNNY'S P&H CONTRAC INC01/28/2015
BIS—ISSUEDSIGN WORLD INC.T/A BEST SIGN CO03/07/1997
BISMHISSUEDPEROTTO ASSOCIATES12/03/1991
1 project · most recent 04/21/2026
FiledStatusContractorScope
04/21/2026———
2 projects · most recent 08/13/2025
Water/Sanitary Gas
FiledStatusContractorScope
08/13/2025——Water/Sanitary
03/04/2021Signed-offL&J PLG & HTG CO OF NY INGas
4 projects · most recent 09/03/2025
General Wiring
FiledStatusContractorScope
09/03/2025Permit IssuedMAR-KAM ELEC'L CONTR'G INGeneral Wiring
10/10/2024CompleteMAR-KAM ELEC'L CONTR'G IN1 meters
11/04/2022CompleteAPEX ELECTRIC CORP—
06/16/2022Permit IssuedTOM FITZPATRICK ELECTRICAGeneral Wiring
▾Special Inspection Requirements (DOB NOW) — 13
DateRequirementInspectorRole
12/31/2025Sprinkler Systems—special
11/02/2025Final—progress
11/02/2025Structural Steel - Details—special
11/02/2025Structural Stability – Alterations of existing buildings—special
08/01/2025Interior lighting powerYongho Kimenergy_progress
08/01/2025Fenestration areasYongho Kimenergy_progress
08/01/2025Fenestration and door U-factor and product ratingsYongho Kimenergy_progress
08/01/2025Air barrier - visual inspectionYongho Kimenergy_progress
08/01/2025Lighting controlsYongho Kimenergy_progress
07/03/2025Fire-Resistant Penetrations and JointsYongho Kimspecial
06/24/2025FinalYongho Kimprogress
03/09/2021Fire-Resistant Penetrations and JointsJose Penaspecial
02/24/2021Fire-Resistant Penetrations and JointsJose Penaspecial
▾Documents — 153 on file (BIS + DOB NOW)
▸Plans & Drawings10
▸DOB NOWPlans/Sketch7
08/19/2026Q01243635-I1Request digital key ↗
08/19/2026Q01245793-I1Request digital key ↗
08/19/2026Q01245793-S2Request digital key ↗
Showing 3 of 7 on file for this type
▸DOB NOWPlans/Sketch - Plumbing2
08/27/2026Q00439942-I1Request digital key ↗
08/15/2026Q00439942-P1Request digital key ↗
▸DOB NOWPlans/Sketch - Mechanical Systems1
08/28/2026Q00369320-I1Request digital key ↗
▸Applications & Permits19
▸BISPLAN / WORK APPROVAL APPLICATION10
08/02/2016421340427Open ↗
08/02/2016421340427Open ↗
06/15/2016421334782Open ↗
Showing 3 of 10 on file for this type
▸BISWORK PERMIT APPLICATION8
06/15/2016421334782Open ↗
03/02/2016421260021Open ↗
03/02/2016421260021Open ↗
Showing 3 of 8 on file for this type
▸BISNon-Directive 14 Construction Sign Off Including Sign Applications1
03/11/2016421032233Open ↗
▸Seals & Professional Certifications36
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION13
08/02/2016421340427Open ↗
07/15/2016421334782Open ↗
06/15/2016421334782Open ↗
Showing 3 of 13 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature10
08/28/2026Q00369320-I1Open ↗
08/27/2026Q00439942-P1Open ↗
08/27/2026Q00439942-I1Open ↗
Showing 3 of 10 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT4
08/02/2016421340427Open ↗
06/15/2016421334782Open ↗
03/02/2016421260021Open ↗
Showing 3 of 4 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST4
08/02/2016421340427Open ↗
06/15/2016421334782Open ↗
03/02/2016421260021Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature3
09/29/2026Q00439942-P1Open ↗
08/27/2026Q00439942-I1Open ↗
08/25/2026Q01245793-I1Open ↗
▸DOB NOWProgress Inspector Seal & Signature2
08/25/2026Q01245793-I1Open ↗
08/25/2026Q01245793-I1Open ↗
▸Trade Schedules & Equipment15
▸BISSELF-CERT PLUMBING NOTICE5
12/10/2015421206974Open ↗
11/18/2015421206974Open ↗
11/18/2015421206974Open ↗
Showing 3 of 5 on file for this type
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE3
10/22/2015421206974Open ↗
05/09/2015421018204Open ↗
09/18/2014421018204Open ↗
▸BISEQUIPMENT USE APPLICATION/PERMIT2
07/15/2016421334782Open ↗
03/11/2016421032233Open ↗
▸BISEQUIPMENT USE PERMITS2
07/21/2016421334782Open ↗
03/11/2016421032233Open ↗
▸BISWATER METER PERMIT : DEP-METER1
12/10/2015421206974Open ↗
▸BISSPRINKLER INSP REPORT : FP-851
07/22/2015421018204Open ↗
▸BISFIRE PROTECTION PLAN(FPP): FDNY APPROVAL1
04/25/2016421260021Open ↗
▸Safety & Tenant Protection1
▸BISTenant Protection Plan and Notes1
08/02/2016421340427Open ↗
▸Environmental & Asbestos16
▸DOB NOWDEP ACP-5: Asbestos Assessment Report11
08/28/2026Q00369320-I1Open ↗
08/27/2026Q00439942-I1Open ↗
08/27/2026Q00439942-P1Open ↗
Showing 3 of 11 on file for this type
▸BISASBESTOS: CERTIFICATION (DEP ACP5)5
08/02/2016421340427Open ↗
06/15/2016421334782Open ↗
03/02/2016421260021Open ↗
Showing 3 of 5 on file for this type
▸Energy Compliance15
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS10
08/02/2016421340427Open ↗
06/22/2016421334782Open ↗
06/15/2016421334782Open ↗
Showing 3 of 10 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS5
06/27/2016421334782Open ↗
04/25/2016421260021Open ↗
02/24/2016421032233Open ↗
Showing 3 of 5 on file for this type
▸Inspections & Test Reports3
▸BISHYDRAULIC FLOW CALCULATIONS2
11/28/2014421018204Open ↗
09/18/2014421018204Open ↗
▸BISDEP Hydrant Flow Test Letter1
09/18/2014421018204Open ↗
▸Approvals, Objections & Sign-offs17
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST7
07/15/2016421334782Open ↗
07/12/2016421334782Open ↗
06/29/2016421334782Open ↗
Showing 3 of 7 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION6
04/25/2016421260021Open ↗
04/25/2016421260021Open ↗
03/11/2016421032233Open ↗
Showing 3 of 6 on file for this type
▸BISADMINISTRATIVE OBJECTIONS3
03/02/2016421260021Open ↗
10/22/2015421206974Open ↗
09/18/2014421018204Open ↗
▸BISTAP LETTER - DOM SVC : DEP-DOM1
12/10/2015421206974Open ↗
▸Cost, Insurance & Ownership13
▸BISCOST AFFIDAVIT13
08/02/2016421340427Open ↗
06/22/2016421334782Open ↗
06/15/2016421334782Open ↗
Showing 3 of 13 on file for this type
▸Filing & Intake Forms8
▸BISEFILING COVER SHEET6
08/02/2016421340427Open ↗
06/15/2016421334782Open ↗
03/02/2016421260021Open ↗
Showing 3 of 6 on file for this type
▸BISADDITIONAL INFORMATION2
05/02/2017421340427Open ↗
08/02/2016421340427Open ↗