← Back
Zoned commercial or Manhattan residential
32-16 36TH AVENUE
QUEENS · BIN 4625677
💬 Discuss this project
0Year Built
—Stories
V1Building Class
M1-2/R5BZoning
0 sfGross Floor Area
0Units
0 Open ViolationsFDNY Report ↗
Zoned commercial or Manhattan residential · Owner of record: LAND SHARK NYC LLC · 6,426 sf lot · 0 FAR built · Flood zone X
Locations of Work
No floor-level scope or drawing coverage on file for this building.
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
CADILLAC GROUP2608/29/2026
TRIERA CONTRACTING303/22/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
JAMINET ENGINEERING603/17/2026
IMEG204/07/2025
LEON SKVIRSKY PE203/25/2024
GREEN DESIGN103/12/2020
VICTOR A. GORDON, PE PC112/06/2019
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
BUILDING BROTHERS1803/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
WOODHOLLOW CONTR CORPGeneral Contractor303/21/2026
RICHARD NEUElectrical103/22/2026
ARCO PLBG AND HTG INCPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
CROSSCHECK INSPECTION SER544403/17/2026
SGM ENGINEERING2366204/07/2025
Building Lifecycle
All (79)Filed (12)Permit Issued (2)Signed Off (9)Inspection (2)Objection (24)Special Inspection (30)
04/23/2026
Signed off — Alteration CO
CONVERT VACANT LAND INTO ELECTRIC VEHICLE CHARGING STATION (USE GROUP 7D) FOR PUBLIC USE. PROPOSED (7) CHARGING DISPENSERS FOR (12) ELECTRIC VEHICLES. NO NEW BUILDING IS TO BE CONSTRUCTED. CURB CUT (Q00703737) AND BPP (440745124) FILED SEPARATELY.
Q00703529-I1
04/02/2026
Special inspection requirement — Exterior lighting power
PHILLIP JAMINET
04/02/2026
Special inspection requirement — Electric vehicle service equipment requirements
PHILLIP JAMINET
04/02/2026
Special inspection requirement — Structural Stability – Alterations of existing buildings
EUGENE BIFULCO
04/02/2026
Special inspection requirement — Excavations - Sheeting, Shoring, and Bracing
EUGENE BIFULCO
04/02/2026
Special inspection requirement — Concrete - Cast-In-Place
EUGENE BIFULCO
04/02/2026
Special inspection requirement — Subsurface Conditions – Fill Placement & In-Place Density
EUGENE BIFULCO
04/02/2026
Special inspection requirement — Subgrade Inspections
EUGENE BIFULCO
04/02/2026
Special inspection requirement — Final
PHILLIP JAMINET
04/02/2026
Special inspection requirement — Lighting controls
PHILLIP JAMINET
03/17/2026
Filed — Alteration CO
CONVERT VACANT LAND INTO ELECTRIC VEHICLE CHARGING STATION (USE GROUP 7D) FOR PUBLIC USE. PROPOSED (7) CHARGING DISPENSERS FOR (12) ELECTRIC VEHICLES. NO NEW BUILDING IS TO BE CONSTRUCTED. CURB CUT (Q00703737) AND BPP (440745124) FILED SEPARATELY.
Q00703529-P3
03/16/2026
Special inspection requirement — Subgrade Inspections
EUGENE BIFULCO
03/16/2026
Special inspection requirement — Lighting controls
PHILLIP JAMINET
03/16/2026
Special inspection requirement — Electric vehicle service equipment requirements
PHILLIP JAMINET
03/16/2026
Special inspection requirement — Exterior lighting power
PHILLIP JAMINET
03/16/2026
Special inspection requirement — Structural Stability – Alterations of existing buildings
EUGENE BIFULCO
03/16/2026
Special inspection requirement — Final
PHILLIP JAMINET
03/16/2026
Special inspection requirement — Subsurface Conditions – Fill Placement & In-Place Density
EUGENE BIFULCO
03/16/2026
Special inspection requirement — Concrete - Cast-In-Place
EUGENE BIFULCO
03/16/2026
Special inspection requirement — Excavations - Sheeting, Shoring, and Bracing
EUGENE BIFULCO
09/05/2025
Signed off — Alteration
PROPOSED GENERAL CONSTRUCTION FOR STORM DRAINAGE WORK AT EXISTING EV CHARGING STATION. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
Q01186204-S1
09/05/2025
Signed off — Alteration
PROPOSED GENERAL CONSTRUCTION FOR STORM DRAINAGE WORK AT EXISTING EV CHARGING STATION. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
Q01186204-I1
07/22/2025
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
07/16/2025
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
06/12/2025
Permit issued — Plumbing
Q01186204-S1-PL
06/10/2025
Permit issued — General Construction
Q01186204-I1-GC
04/07/2025
Filed — Alteration
PROPOSED GENERAL CONSTRUCTION FOR STORM DRAINAGE WORK AT EXISTING EV CHARGING STATION. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
Q01186204-S1
04/07/2025
Filed — Alteration
PROPOSED GENERAL CONSTRUCTION FOR STORM DRAINAGE WORK AT EXISTING EV CHARGING STATION. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
Q01186204-I1
02/25/2025
Special inspection requirement — Subgrade Inspections
steven Giammona
02/25/2025
Special inspection requirement — Private On-Site Storm Water Disposal Systems-, and Detention Facilities, Installation
steven Giammona
02/25/2025
Special inspection requirement — Final
Michael Hults
02/25/2025
Special inspection requirement — Subsurface Investigations (Borings/Test Pits)
Nejm Jundi
10/16/2024
Objection resolved — Addressed
10/09/2024
Objection raised — Scope
10/08/2024
Filed — Alteration CO
CONVERT VACANT LAND INTO ELECTRIC VEHICLE CHARGING STATION (USE GROUP 7D) FOR PUBLIC USE. PROPOSED (7) CHARGING DISPENSERS FOR (12) ELECTRIC VEHICLES. NO NEW BUILDING IS TO BE CONSTRUCTED. CURB CUT (Q00703737) AND BPP (440745124) FILED SEPARATELY.
Q00703529-P2
10/03/2024
Special inspection requirement — Electric vehicle service equipment requirements
PHILLIP JAMINET
10/03/2024
Special inspection requirement — Concrete - Cast-In-Place
EUGENE BIFULCO
10/03/2024
Special inspection requirement — Excavations - Sheeting, Shoring, and Bracing
EUGENE BIFULCO
10/03/2024
Special inspection requirement — Structural Stability – Alterations of existing buildings
EUGENE BIFULCO
10/03/2024
Special inspection requirement — Subgrade Inspections
EUGENE BIFULCO
10/03/2024
Special inspection requirement — Subsurface Conditions – Fill Placement & In-Place Density
EUGENE BIFULCO
10/03/2024
Special inspection requirement — Final
PHILLIP JAMINET
10/03/2024
Special inspection requirement — Exterior lighting power
PHILLIP JAMINET
07/29/2024
Signed off — Alteration
Q00942260-I1
07/29/2024
Signed off — Alteration
INSTALL NON-ILLUMINATED SIGN ON EXTERIOR WALL (EVgo FAST CHARGING)
Q00942285-I1
07/29/2024
Signed off — Alteration
Q00703737-I1
07/08/2024
Signed off — Alteration
TEMPORARY CONSTRUCTION FENCE
Q00761343-I1
04/24/2024
Objection resolved — Addressed
04/23/2024
Objection raised — Scope
04/23/2024
Objection resolved — Addressed
04/16/2024
Objection resolved — Addressed
04/02/2024
Objection raised — Scope
04/02/2024
Objection raised — Scope
03/29/2024
Objection resolved — Addressed
03/29/2024
Objection resolved — Addressed
03/25/2024
Filed — Alteration
Q00942260-I1
03/25/2024
Filed — Alteration
INSTALL NON-ILLUMINATED SIGN ON EXTERIOR WALL (EVgo FAST CHARGING)
Q00942285-I1
03/06/2024
Objection resolved — Addressed
03/01/2024
Objection raised — Zoning
03/01/2024
Objection raised — Scope
Latest 60 of 79 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingSigned-offARCO PLBG AND HTG INC06/12/2025
DOB NOWGeneral ConstructionSigned-offWOODHOLLOW CONTR CORP06/10/2025
2 projects · most recent 07/22/2024
General Wiring
FiledStatusContractorScope
07/22/2024CompleteHOME RUN ELECTRICGeneral Wiring
03/12/2020CompleteRICHARD NEU—
1 project · most recent 03/17/2026
FiledStatusContractorScope
03/17/2026Permit IssuedWOODHOLLOW CONTR CORP3 scope_items
▾Field Inspections (DOB CAP) — 2
DateTypeResultReport
07/22/2025Pass-Final PL - Up to 3 Requested FloorsPassView ↗
07/16/2025Pass-Final PL - Up to 3 Requested FloorsPassView ↗
▾Special Inspection Requirements (DOB NOW) — 42
DateRequirementInspectorRole
04/02/2026Exterior lighting powerPHILLIP JAMINETenergy_progress
04/02/2026Electric vehicle service equipment requirementsPHILLIP JAMINETenergy_progress
04/02/2026Structural Stability – Alterations of existing buildingsEUGENE BIFULCOspecial
04/02/2026Excavations - Sheeting, Shoring, and BracingEUGENE BIFULCOspecial
04/02/2026Concrete - Cast-In-PlaceEUGENE BIFULCOspecial
04/02/2026Subsurface Conditions – Fill Placement & In-Place DensityEUGENE BIFULCOspecial
04/02/2026Subgrade InspectionsEUGENE BIFULCOspecial
04/02/2026FinalPHILLIP JAMINETprogress
04/02/2026Lighting controlsPHILLIP JAMINETenergy_progress
03/16/2026Subgrade InspectionsEUGENE BIFULCOspecial
03/16/2026Lighting controlsPHILLIP JAMINETenergy_progress
03/16/2026Electric vehicle service equipment requirementsPHILLIP JAMINETenergy_progress
03/16/2026Exterior lighting powerPHILLIP JAMINETenergy_progress
03/16/2026Structural Stability – Alterations of existing buildingsEUGENE BIFULCOspecial
03/16/2026FinalPHILLIP JAMINETprogress
03/16/2026Subsurface Conditions – Fill Placement & In-Place DensityEUGENE BIFULCOspecial
03/16/2026Concrete - Cast-In-PlaceEUGENE BIFULCOspecial
03/16/2026Excavations - Sheeting, Shoring, and BracingEUGENE BIFULCOspecial
02/25/2025Subgrade Inspectionssteven Giammonaspecial
02/25/2025Private On-Site Storm Water Disposal Systems-, and Detention Facilities, Installationsteven Giammonaspecial
02/25/2025FinalMichael Hultsprogress
02/25/2025Subsurface Investigations (Borings/Test Pits)Nejm Jundispecial
10/03/2024Electric vehicle service equipment requirementsPHILLIP JAMINETenergy_progress
10/03/2024Concrete - Cast-In-PlaceEUGENE BIFULCOspecial
10/03/2024Excavations - Sheeting, Shoring, and BracingEUGENE BIFULCOspecial
Latest 25 of 42.
▾Documents — 74 on file (BIS + DOB NOW)
▸Plans & Drawings11
▸DOB NOWPlans/Sketch9
08/26/2026Q00761343-I1Request digital key ↗
08/26/2026Q00703737-I1Request digital key ↗
08/23/2026Q00942285-I1Request digital key ↗
Showing 3 of 9 on file for this type
▸DOB NOWPlans/Sketch - Construction Fence1
08/28/2026Q00276720-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Sidewalk Shed1
08/28/2026Q00331303-I1Request digital key ↗
▸Applications & Permits5
▸BISPLAN / WORK APPROVAL APPLICATION2
11/03/2023440745124Open ↗
10/21/2022440745124Open ↗
▸BISBPP-DOT: SIDEWALK/CURB/ROAD WORK PERMITS1
09/15/2025440745124Open ↗
▸BISPLAN - WORK & PERMITS - SUPPPORTING DOCUMENTATION1
10/02/2025440745124Open ↗
▸BISBPP-5 - Authorization to the Department of Transportation1
05/02/2024440745124Open ↗
▸Zoning, Tax Lot & Property Records1
▸BISTAX LOT: FINAL LOT NUMBER ISSUED1
09/10/2025440745124Open ↗
▸Seals & Professional Certifications31
▸DOB NOWDPL-1: Design Professional Seal & Signature11
08/28/2026Q00276720-I1Open ↗
08/28/2026Q00331303-I1Open ↗
08/26/2026Q00703737-I1Open ↗
Showing 3 of 11 on file for this type
▸DOB NOWProgress Inspector Seal & Signature11
09/05/2026Q00331303-I1Open ↗
09/01/2026Q00703529-P2Open ↗
09/01/2026Q00703529-P2Open ↗
Showing 3 of 11 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature7
09/01/2026Q00703529-P2Open ↗
08/29/2026Q01186204-S1Open ↗
08/25/2026Q00703529-I1Open ↗
Showing 3 of 7 on file for this type
▸BISAPPLICANT OWNER SIGNATURE1
10/21/2022440745124Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY1
10/21/2022440745124Open ↗
▸Safety & Tenant Protection4
▸BISSTREET TREES SITE PLAN1
09/10/2025440745124Open ↗
▸BISSTREET TREE SUPPORTING DOCUMENT1
09/15/2025440745124Open ↗
▸BISSTREET TREE CHECKLIST1
11/04/2022440745124Open ↗
▸BISSTREET TREE SIGNOFF1
09/10/2025440745124Open ↗
▸Inspections & Test Reports4
▸BISBPP: FIELD INSPECTION1
12/02/2025440745124Open ↗
▸BISTECHNICAL REPORT: RESPONSIBILITY1
10/21/2022440745124Open ↗
▸DOB NOWTR4 Test Report and Plot Diagram1
08/13/2026Q01186204-I1Open ↗
▸DOB NOWSOIL REPORT1
08/13/2026Q01186204-I1Open ↗
▸Approvals, Objections & Sign-offs1
▸BISCURB CUT (CC) SIGNOFF1
09/10/2025440745124Open ↗
▸Cost, Insurance & Ownership1
▸BISBPP: ENGINEERS AFFIDAVIT1
10/02/2025440745124Open ↗
▸Filing & Intake Forms5
▸BISADDITIONAL INFORMATION3
03/14/2024440745124Open ↗
10/20/2023440745124Open ↗
10/16/2023440745124Open ↗
▸BISEFILING JOB APPLICATION COVER SHEET1
10/21/2022440745124Open ↗
▸BISBPP: CHECKLIST IN LIEU OF PLANS-ALT31
10/21/2022440745124Open ↗
▸Other Documents11
▸DOB NOWProperty Ownership Certification4
08/21/2026Q00703529-P2Open ↗
08/21/2026Q00703529-P3Open ↗
08/21/2026Q00703529-I1Open ↗
Showing 3 of 4 on file for this type
▸BISTREE TRANSPLANTATION1
10/22/2025440745124Open ↗
▸BISBPP-PARKS: PLANT NEW TREE1
10/03/2023440745124Open ↗
▸BISOPPOSITE CORNER PED-RAMP DOT COMPLIANCE1
09/15/2025440745124Open ↗
▸BISBPP: FINAL AS-BUILT PHOTOGRAPHS1
10/02/2025440745124Open ↗
▸BISBPP: PHOTOS-SIGNED/SEALED BY APPLICANT1
10/16/2023440745124Open ↗
▸BISBPP: AS-BUILT SIDEWALK SURVEY1
10/02/2025440745124Open ↗
▸BISBPP: GRADE STUDY1
10/20/2023440745124Open ↗