← Back
Two family brick
32-20 32 STREET
QUEENS · BIN 4008291
💬 Discuss this project
1950Year Built
2Stories
B1Building Class
R5Zoning
1,701 sfGross Floor Area
2Units
0 Open Violations
Two family brick · 1,832 sf lot · 0.93 FAR built · Flood zone X
Locations of Work
ArchitectureGeneral
Floor 26p · 1 filing · 20 docs
Floor 15p · 1 filing · 20 docs
Basement6p · 1 filing · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
DUTCH KILLS THEATER COMPANY1203/22/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
11/03/2021$1.3M—— → —$758/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
CLAUS F. RADEMACHER, ARCHITECTS805/14/2024
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
PROCESS WERKSHOP1003/21/2026
NMI ARCHITECTURE PLLC603/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
DFE CONTRACTOR LLCGeneral Contractor303/21/2026
JUST PLBG & HTG INCPlumbing207/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
NMI ARCHITECTURE, PLLC6825305/14/2024
ROBERT HANNA5589605/14/2024
Building Lifecycle
All (45)Filed (8)Permit Issued (3)Signed Off (1)Violation (2)Inspection (9)Objection (4)Special Inspection (18)
05/28/2024
Special inspection requirement — Fenestration areas
Claus Rademacher
05/28/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
ROBERT HANNA
05/28/2024
Special inspection requirement — Structural Stability – Alterations of existing buildings
ROBERT HANNA
05/28/2024
Special inspection requirement — Structural Steel - Details
NASHAT IBRAHIM
05/28/2024
Special inspection requirement — Final
Claus Rademacher
05/28/2024
Special inspection requirement — Energy Code Compliance Inspections
Claus Rademacher
05/28/2024
Special inspection requirement — Fenestration air leakage
Claus Rademacher
05/28/2024
Special inspection requirement — Insulation placement and R values
Claus Rademacher
05/28/2024
Special inspection requirement — Fenestration and door U-factor and product ratings
Claus Rademacher
05/14/2024
Filed — Alteration CO
Alt-1 for the existing 2 fam to combine the 1st and second floor as one unit, create a separate unit at the basement floor, no change of use or occupancy is proposed. Sprinkler heads filed under separate PL job for basement unit only.
Q08012696-P2
05/14/2024
Signed off — Alteration
MINOR PLUMBING WORK RELATED TO GEN CONST WORK FILED SEPERATELY. NO CHANGE IN OCCUPANCY, USE OR EGRESS.
Q08025042-I1
05/13/2024
Special inspection requirement — Final
Claus Rademacher
05/13/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
ROBERT HANNA
05/13/2024
Special inspection requirement — Structural Stability – Alterations of existing buildings
ROBERT HANNA
05/13/2024
Special inspection requirement — Structural Steel - Details
NASHAT IBRAHIM
05/13/2024
Special inspection requirement — Energy Code Compliance Inspections
Claus Rademacher
05/13/2024
Special inspection requirement — Fenestration areas
Claus Rademacher
05/13/2024
Special inspection requirement — Fenestration air leakage
Claus Rademacher
05/13/2024
Special inspection requirement — Fenestration and door U-factor and product ratings
Claus Rademacher
05/13/2024
Special inspection requirement — Insulation placement and R values
Claus Rademacher
03/18/2024
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
02/21/2024
Filed — Alteration
MINOR PLUMBING WORK RELATED TO GEN CONST WORK FILED SEPERATELY. NO CHANGE IN OCCUPANCY, USE OR EGRESS.
Q08025042-P4
12/11/2023
Filed — Alteration
MINOR PLUMBING WORK RELATED TO GEN CONST WORK FILED SEPERATELY. NO CHANGE IN OCCUPANCY, USE OR EGRESS.
Q08025042-P3
10/02/2023
Filed — Alteration
MINOR PLUMBING WORK RELATED TO GEN CONST WORK FILED SEPERATELY. NO CHANGE IN OCCUPANCY, USE OR EGRESS.
Q08025042-P2
09/01/2023
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
07/10/2023
Inspection — No Access-Final PL - Up to 3 Requested Floors
No Access
View inspection ↗
07/05/2023
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
05/08/2023
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
05/08/2023
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
05/08/2023
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
05/03/2023
Filed — Alteration
MINOR PLUMBING WORK RELATED TO GEN CONST WORK FILED SEPERATELY. NO CHANGE IN OCCUPANCY, USE OR EGRESS.
Q08025042-P1
02/23/2023
Filed — Alteration CO
Alt-1 for the existing 2 fam to combine the 1st and second floor as one unit, create a separate unit at the basement floor, no change of use or occupancy is proposed. Sprinkler heads filed under separate PL job for basement unit only.
Q08012696-P1
02/13/2023
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
02/07/2023
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
01/20/2023
Permit issued — General Construction
Q08012696-I1-GC-CX
01/19/2023
Permit issued — Plumbing
Q08025042-I1-PL
11/22/2022
Objection raised — Other
11/22/2022
Objection resolved — Addressed
10/25/2022
Objection raised — Fire_Protection
10/25/2022
Objection resolved — Addressed
10/24/2022
Permit issued — Plumbing
Q08025042-I1-PL
10/21/2022
Filed — Alteration
MINOR PLUMBING WORK RELATED TO GEN CONST WORK FILED SEPERATELY. NO CHANGE IN OCCUPANCY, USE OR EGRESS.
Q08025042-I1
10/17/2022
Filed — Alteration CO
Alt-1 for the existing 2 fam to combine the 1st and second floor as one unit, create a separate unit at the basement floor, no change of use or occupancy is proposed. Sprinkler heads filed under separate PL job for basement unit only.
Q08012696-I1
05/01/2007
Violation issued (ECB, closed)
Quality of Life
05/01/2007
Violation issued (ECB, closed)
Quality of Life
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionPermit IssuedDFE CONTRACTOR LLC01/20/2023
DOB NOWPlumbingSigned-offMOHAMED ABDELRAZEK01/19/2023
DOB NOWPlumbingSigned-offMOHAMED ABDELRAZEK10/24/2022
1 project · most recent 08/11/2023
General Wiring
FiledStatusContractorScope
08/11/2023CompleteWCK ELECTRIC CORP.General Wiring
1 project · most recent 05/14/2024
Steel Concrete
FiledStatusContractorScope
05/14/2024Permit IssuedDFE CONTRACTOR LLCSteel, Concrete
▾Field Inspections (DOB CAP) — 9
DateTypeResultReport
03/18/2024Pass-Final CND-Occupancy InspectionPassView ↗
09/01/2023Pass-Final PL - Up to 3 Requested FloorsPassView ↗
07/10/2023No Access-Final PL - Up to 3 Requested FloorsNo AccessView ↗
07/05/2023Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
05/08/2023Certified Gas-Gas-Piping-RoughingCertifiedView ↗
05/08/2023Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
05/08/2023Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
02/13/2023Certified Gas-Gas-Piping-RoughingCertifiedView ↗
02/07/2023Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 18
DateRequirementInspectorRole
05/28/2024Fenestration areasClaus Rademacherenergy_progress
05/28/2024Fire-Resistant Penetrations and JointsROBERT HANNAspecial
05/28/2024Structural Stability – Alterations of existing buildingsROBERT HANNAspecial
05/28/2024Structural Steel - DetailsNASHAT IBRAHIMspecial
05/28/2024FinalClaus Rademacherprogress
05/28/2024Energy Code Compliance InspectionsClaus Rademacherprogress
05/28/2024Fenestration air leakageClaus Rademacherenergy_progress
05/28/2024Insulation placement and R valuesClaus Rademacherenergy_progress
05/28/2024Fenestration and door U-factor and product ratingsClaus Rademacherenergy_progress
05/13/2024FinalClaus Rademacherprogress
05/13/2024Fire-Resistant Penetrations and JointsROBERT HANNAspecial
05/13/2024Structural Stability – Alterations of existing buildingsROBERT HANNAspecial
05/13/2024Structural Steel - DetailsNASHAT IBRAHIMspecial
05/13/2024Energy Code Compliance InspectionsClaus Rademacherprogress
05/13/2024Fenestration areasClaus Rademacherenergy_progress
05/13/2024Fenestration air leakageClaus Rademacherenergy_progress
05/13/2024Fenestration and door U-factor and product ratingsClaus Rademacherenergy_progress
05/13/2024Insulation placement and R valuesClaus Rademacherenergy_progress
▾Documents — 36 on file (BIS + DOB NOW)
▸Plans & Drawings8
▸DOB NOWPlans/Sketch8
08/24/2026Q08025042-P4Request digital key ↗
08/24/2026Q08025042-P3Request digital key ↗
08/24/2026Q08025042-P2Request digital key ↗
Showing 3 of 8 on file for this type
▸Zoning, Tax Lot & Property Records1
▸DOB NOWHouse Number Verification: TOPO Stamp1
08/13/2026Q08012696-I1Open ↗
▸Seals & Professional Certifications20
▸DOB NOWDPL-1: Design Professional Seal & Signature8
08/24/2026Q08025042-P3Open ↗
08/24/2026Q08025042-P1Open ↗
08/24/2026Q08025042-I1Open ↗
Showing 3 of 8 on file for this type
▸DOB NOWProgress Inspector Seal & Signature6
08/24/2026Q08012696-P2Open ↗
08/24/2026Q08012696-P2Open ↗
08/24/2026Q08012696-P2Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature6
08/24/2026Q08012696-P2Open ↗
08/24/2026Q08012696-P2Open ↗
08/24/2026Q08012696-P2Open ↗
Showing 3 of 6 on file for this type
▸Trade Schedules & Equipment2
▸DOB NOWSprinkler system Application Sign-off1
08/13/2026Q08012696-I1Open ↗
▸DOB NOWSprinkler System sign-off1
08/13/2026Q08012696-I1Open ↗
▸Environmental & Asbestos2
▸DOB NOWDEP ACP-20/ACP-21: Asbestos Project Conditional Completion Form/Asbestos Project Completion Form2
08/24/2026Q08025042-I1Open ↗
08/14/2026Q08012696-I1Open ↗
▸Other Documents3
▸DOB NOWProperty Ownership Certification3
08/22/2026Q08012696-P2Open ↗
08/22/2026Q08012696-P1Open ↗