← Back
Two stories - detached, small or mid-size
32-36 213 STREET
QUEENS · BIN 4134920
💬 Discuss this project
1940Year Built
2Stories
A1Building Class
R2AZoning
1,136 sfGross Floor Area
1Units
0 Open ViolationsFDNY Report ↗
Two stories - detached, small or mid-size · 4,500 sf lot · 0.25 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralElectricalPlumbingCivil
Roof1p · 1 filing · 5 docs
Floor 210p · 1 filing · 20 docs
Floor 111p · 1 filing · 20 docs
Cellar11p · 1 filing · 20 docs
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
12/05/2024$975K—Private party → Private party$858/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
DAVID CUNNINGHAM ARCHITECTURE PLANN705/15/2026
MDZ ENGINEERING, LLC205/08/2025
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
BMB BUILDING CONSULTING1603/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
OCS BUILDERS GROUP LLCGeneral Contractor507/08/2026
JUST PLUMBING INDUSTRIESPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
RYAN SPECIAL ENGINEERING2018605/15/2026
PAUL DENIS ASSOCIATES2472108/22/2025
SD TESTING & INSPECTION S7010205/08/2025
Building Lifecycle
All (74)Filed (9)Permit Issued (6)Signed Off (5)Violation (1)Inspection (7)Objection (16)Special Inspection (30)
07/20/2026
Signed off — Alteration CO
PROPOSE 2-STORY REAR HORIZONTAL ENLARGEMENT OF EXISTING SINGLE-FAMILY HOUSE WITH GENERAL CONSTRUCTION WORKS AS PER PLANS. OBTAIN NEW CO.
Q01187942-S2
06/04/2026
Special inspection requirement — HVAC-R and service water heating equipment
PAUL DENIS
06/04/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
William Ryan
06/04/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
PAUL DENIS
06/04/2026
Special inspection requirement — HVAC-R and service water heating system controls
PAUL DENIS
05/15/2026
Filed — Alteration CO
PROPOSE 2-STORY REAR HORIZONTAL ENLARGEMENT OF EXISTING SINGLE-FAMILY HOUSE WITH GENERAL CONSTRUCTION WORKS AS PER PLANS. OBTAIN NEW CO.
Q01187942-P3
05/05/2026
Signed off — Alteration
Propose Structural work for a rear horizontal enlargement of existing single family house, filed in conjunction with Alt-CO # Q01187942-I1.
Q01214007-I1
05/05/2026
Signed off — Alteration
Propose Foundation for horizontal enlargement of existing single family house, filed in conjunction with Alt-CO # Q01187942-I1
Q01214019-I1
04/27/2026
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
04/24/2026
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
04/09/2026
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
03/30/2026
Signed off — Alteration CO
PROPOSE 2-STORY REAR HORIZONTAL ENLARGEMENT OF EXISTING SINGLE-FAMILY HOUSE WITH GENERAL CONSTRUCTION WORKS AS PER PLANS. OBTAIN NEW CO.
Q01187942-S1
03/26/2026
Signed off — Alteration
Proposed installation of temporary construction fence at sidewalk as per plan in conjunction with ALT-CO Q01187942-I1.
Q01200986-I1
03/24/2026
Special inspection requirement — Interior lighting power
William Ryan
03/24/2026
Special inspection requirement — Fire-Resistance Rated Construction
William Ryan
03/24/2026
Special inspection requirement — Fenestration air leakage
William Ryan
03/24/2026
Special inspection requirement — Fenestration and door U-factor and product ratings
William Ryan
03/24/2026
Special inspection requirement — Electric vehicle service equipment requirements
William Ryan
03/24/2026
Special inspection requirement — Energy Code Compliance Inspections
William Ryan
03/24/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
William Ryan
03/24/2026
Special inspection requirement — Structural Stability – Alterations of existing buildings
William Ryan
03/24/2026
Special inspection requirement — Fenestration areas
William Ryan
03/24/2026
Special inspection requirement — Insulation placement and R values
William Ryan
03/24/2026
Special inspection requirement — Permanent certificate
William Ryan
03/24/2026
Special inspection requirement — Air barrier - visual inspection
William Ryan
02/25/2026
Objection resolved — Addressed
02/12/2026
Objection raised — Admin
02/09/2026
Filed — Alteration CO
PROPOSE 2-STORY REAR HORIZONTAL ENLARGEMENT OF EXISTING SINGLE-FAMILY HOUSE WITH GENERAL CONSTRUCTION WORKS AS PER PLANS. OBTAIN NEW CO.
Q01187942-P2
02/06/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
PAUL DENIS
02/06/2026
Special inspection requirement — HVAC-R and service water heating equipment
PAUL DENIS
02/06/2026
Special inspection requirement — HVAC-R and service water heating system controls
PAUL DENIS
02/06/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
William Ryan
01/26/2026
Filed — Alteration CO
PROPOSE 2-STORY REAR HORIZONTAL ENLARGEMENT OF EXISTING SINGLE-FAMILY HOUSE WITH GENERAL CONSTRUCTION WORKS AS PER PLANS. OBTAIN NEW CO.
Q01187942-P1
01/22/2026
Special inspection requirement — Fenestration air leakage
William Ryan
01/22/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
William Ryan
01/22/2026
Special inspection requirement — Structural Stability – Alterations of existing buildings
William Ryan
01/22/2026
Special inspection requirement — Energy Code Compliance Inspections
William Ryan
01/22/2026
Special inspection requirement — Fire-Resistance Rated Construction
William Ryan
01/22/2026
Special inspection requirement — Electric vehicle service equipment requirements
William Ryan
01/22/2026
Special inspection requirement — Permanent certificate
William Ryan
01/22/2026
Special inspection requirement — Air barrier - visual inspection
William Ryan
01/22/2026
Special inspection requirement — Fenestration and door U-factor and product ratings
William Ryan
01/22/2026
Special inspection requirement — Fenestration areas
William Ryan
01/05/2026
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
12/22/2025
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
12/12/2025
Permit issued — Mechanical Systems
Q01187942-S1-MS
12/09/2025
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
11/14/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
11/05/2025
Permit issued — Plumbing
Q01187942-S2-PL
10/30/2025
Objection raised — Admin
10/30/2025
Objection resolved — Addressed
10/03/2025
Objection resolved — Addressed
10/03/2025
Objection resolved — Addressed
10/03/2025
Objection resolved — Addressed
10/03/2025
Objection resolved — Addressed
09/26/2025
Permit issued — Structural
Q01214007-I1-ST
09/26/2025
Permit issued — Foundation
Q01214019-I1-FO
09/24/2025
Objection raised — Plumbing
09/24/2025
Objection raised — Plumbing
09/24/2025
Objection raised — Fire_Protection
Latest 60 of 74 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWMechanical SystemsSigned-offOCS BUILDERS GROUP LLC12/12/2025
DOB NOWPlumbingSigned-offJUST PLUMBING INDUSTRIES11/05/2025
DOB NOWStructuralSigned-offOCS BUILDERS GROUP LLC09/26/2025
DOB NOWFoundationSigned-offOCS BUILDERS GROUP LLC09/26/2025
DOB NOWGeneral ConstructionPermit IssuedOCS BUILDERS GROUP LLC09/04/2025
DOB NOWConstruction FenceSigned-offOCS BUILDERS GROUP LLC08/26/2025
1 project · most recent 05/15/2026
Gas Water/Sanitary
FiledStatusContractorScope
05/15/2026Signed-offJUST PLUMBING INDUSTRIESGas, Water/Sanitary
1 project · most recent 05/02/2025
General Wiring
FiledStatusContractorScope
05/02/2025Permit IssuedFRACCAVENTO ELEC. CORPGeneral Wiring
2 projects · most recent 05/08/2025
Steel Concrete
FiledStatusContractorScope
05/08/2025Signed-offOCS BUILDERS GROUP LLCSteel, Concrete
05/08/2025Signed-offOCS BUILDERS GROUP LLC1 scope_items
▾Field Inspections (DOB CAP) — 7
DateTypeResultReport
04/27/2026Pass-Final PL - Up to 3 Requested FloorsPassView ↗
04/24/2026Pass-Final CND-Occupancy InspectionPassView ↗
04/09/2026Pass-Final CND-Occupancy InspectionPassView ↗
01/05/2026Certified Gas-Gas-Piping-RoughingCertifiedView ↗
12/22/2025Pass-Final PL - Up to 3 Requested FloorsPassView ↗
12/09/2025Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
11/14/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 42
DateRequirementInspectorRole
06/04/2026HVAC-R and service water heating equipmentPAUL DENISenergy_progress
06/04/2026Fire-Resistant Penetrations and JointsWilliam Ryanspecial
06/04/2026HVAC-R and service water piping design and insulationPAUL DENISenergy_progress
06/04/2026HVAC-R and service water heating system controlsPAUL DENISenergy_progress
03/24/2026Interior lighting powerWilliam Ryanenergy_progress
03/24/2026Fire-Resistance Rated ConstructionWilliam Ryanprogress
03/24/2026Fenestration air leakageWilliam Ryanenergy_progress
03/24/2026Fenestration and door U-factor and product ratingsWilliam Ryanenergy_progress
03/24/2026Electric vehicle service equipment requirementsWilliam Ryanenergy_progress
03/24/2026Energy Code Compliance InspectionsWilliam Ryanprogress
03/24/2026Fire-Resistant Penetrations and JointsWilliam Ryanspecial
03/24/2026Structural Stability – Alterations of existing buildingsWilliam Ryanspecial
03/24/2026Fenestration areasWilliam Ryanenergy_progress
03/24/2026Insulation placement and R valuesWilliam Ryanenergy_progress
03/24/2026Permanent certificateWilliam Ryanenergy_progress
03/24/2026Air barrier - visual inspectionWilliam Ryanenergy_progress
02/06/2026HVAC-R and service water piping design and insulationPAUL DENISenergy_progress
02/06/2026HVAC-R and service water heating equipmentPAUL DENISenergy_progress
02/06/2026HVAC-R and service water heating system controlsPAUL DENISenergy_progress
02/06/2026Fire-Resistant Penetrations and JointsWilliam Ryanspecial
01/22/2026Fenestration air leakageWilliam Ryanenergy_progress
01/22/2026Fire-Resistant Penetrations and JointsWilliam Ryanspecial
01/22/2026Structural Stability – Alterations of existing buildingsWilliam Ryanspecial
01/22/2026Energy Code Compliance InspectionsWilliam Ryanprogress
01/22/2026Fire-Resistance Rated ConstructionWilliam Ryanprogress
Latest 25 of 42.
▾Documents — 84 on file (BIS + DOB NOW)
▸Plans & Drawings9
▸DOB NOWPlans/Sketch9
08/20/2026Q01200986-I1Request digital key ↗
08/20/2026Q01214007-I1Request digital key ↗
08/20/2026Q01214019-I1Request digital key ↗
Showing 3 of 9 on file for this type
▸Zoning, Tax Lot & Property Records6
▸DOB NOWZD1: DOB Zoning Diagram2
08/13/2026Q01187942-P1Open ↗
08/13/2026Q01187942-I1Open ↗
▸DOB NOWHouse Number Verification: TOPO Stamp2
08/13/2026Q01187942-I1Open ↗
08/13/2026Q01187942-P1Open ↗
▸DOB NOWZoning Exhibit form (1-5)2
08/13/2026Q01187942-P1Open ↗
08/13/2026Q01187942-I1Open ↗
▸Seals & Professional Certifications46
▸DOB NOWProgress Inspector Seal & Signature28
08/31/2026Q01214019-I1Open ↗
08/31/2026Q01187942-P2Open ↗
08/31/2026Q01187942-P2Open ↗
Showing 3 of 28 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature9
08/20/2026Q01200986-I1Open ↗
08/20/2026Q01214007-I1Open ↗
08/20/2026Q01214019-I1Open ↗
Showing 3 of 9 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature9
08/31/2026Q01214019-I1Open ↗
08/31/2026Q01214019-I1Open ↗
08/31/2026Q01187942-P2Open ↗
Showing 3 of 9 on file for this type
▸Safety & Tenant Protection2
▸DOB NOWStreet Tree Checklist2
08/13/2026Q01187942-I1Open ↗
08/13/2026Q01187942-P1Open ↗
▸Environmental & Asbestos8
▸DOB NOWDEP ACP-5: Asbestos Assessment Report8
08/20/2026Q01214007-I1Open ↗
08/20/2026Q01214019-I1Open ↗
08/17/2026Q01187942-P2Open ↗
Showing 3 of 8 on file for this type
▸Inspections & Test Reports3
▸DOB NOWGeotechnical Report (BC 1803.6)1
08/13/2026Q01214019-I1Open ↗
▸DOB NOWTR4 Test Report and Plot Diagram1
08/13/2026Q01214019-I1Open ↗
▸DOB NOWSOIL REPORT1
08/13/2026Q01214019-I1Open ↗
▸Other Documents10
▸DOB NOWPlot Diagram3
08/13/2026Q01214019-I1Open ↗
08/13/2026Q01187942-I1Open ↗
08/13/2026Q01187942-P1Open ↗
▸DOB NOWSite Survey: Initial2
08/13/2026Q01187942-I1Open ↗
08/13/2026Q01187942-P1Open ↗
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone2
08/13/2026Q01187942-I1Open ↗
08/13/2026Q01187942-P1Open ↗
▸DOB NOWProperty Ownership Certification2
08/17/2026Q01187942-P1Open ↗
08/17/2026Q01187942-I1Open ↗
▸DOB NOWFinal Survey1
08/17/2026Q01187942-I1Open ↗