← Back
Two family converted from one family
32-37 106 STREET
QUEENS · East Elmhurst · BIN 4042186
💬 Discuss this project
1910Year Built
2Stories
B3Building Class
R4Zoning
2,016 sfGross Floor Area
2Units
Two family converted from one family · 4,000 sf lot · 0.5 FAR built · Flood zone X
Locations of Work
Plumbing
Cellar5p · 1 filing · 19 docs
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
06/29/2021$1.1M—Private party → Private party$526/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
ZHENG ENGINEERING PLLC210/20/2021
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
XH&RC PLBG AND HTG INCPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
OFFICE OF XIAO YE ZHENG,7471210/20/2021
Building Lifecycle
All (20)Filed (2)Permit Issued (1)Signed Off (1)Inspection (4)Special Inspection (12)
11/18/2021
Signed off — Alteration
WORK TO REPLACE EXISTING GAS BOILER AND GAS HOT WATER HEATER WITH TWO HOT WATER HEATERS AND TWO GAS BOILERS WITH REQUIRED PLUMBING WORK. NO CHANGE IN USE, OCCUPANCY, AND EGRESS.
Q00560879-I1
11/08/2021
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
11/04/2021
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
10/30/2021
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
10/24/2021
Special inspection requirement — Maintenance information
XIAO ZHENG
10/24/2021
Special inspection requirement — Fire-Resistant Penetrations and Joints
XIAO ZHENG
10/24/2021
Special inspection requirement — Energy Code Compliance Inspections
XIAO ZHENG
10/24/2021
Special inspection requirement — HVAC-R and service water piping design and insulation
XIAO ZHENG
10/24/2021
Special inspection requirement — HVAC-R and service water heating equipment
XIAO ZHENG
10/24/2021
Special inspection requirement — HVAC-R and service water heating system controls
XIAO ZHENG
10/20/2021
Filed — Alteration
WORK TO REPLACE EXISTING GAS BOILER AND GAS HOT WATER HEATER WITH TWO HOT WATER HEATERS AND TWO GAS BOILERS WITH REQUIRED PLUMBING WORK. NO CHANGE IN USE, OCCUPANCY, AND EGRESS.
Q00560879-P1
10/20/2021
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
10/20/2021
Special inspection requirement — Fire-Resistant Penetrations and Joints
XIAO ZHENG
10/20/2021
Special inspection requirement — Energy Code Compliance Inspections
XIAO ZHENG
10/20/2021
Special inspection requirement — HVAC-R and service water piping design and insulation
XIAO ZHENG
10/20/2021
Special inspection requirement — HVAC-R and service water heating equipment
XIAO ZHENG
10/20/2021
Special inspection requirement — Maintenance information
XIAO ZHENG
10/20/2021
Special inspection requirement — HVAC-R and service water heating system controls
XIAO ZHENG
08/23/2021
Permit issued — Plumbing
Q00560879-I1-PL
07/21/2021
Filed — Alteration
WORK TO REPLACE EXISTING GAS BOILER AND GAS HOT WATER HEATER WITH TWO HOT WATER HEATERS AND TWO GAS BOILERS WITH REQUIRED PLUMBING WORK. NO CHANGE IN USE, OCCUPANCY, AND EGRESS.
Q00560879-I1
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingSigned-offXH&RC PLBG AND HTG INC08/23/2021
BISPLISSUEDN/A10/17/1995
1 project · most recent 07/12/2021
FiledStatusContractorScope
07/12/2021CompleteAL-LECTRIC ELECT'L CONTRG3 meters, 3 new_meters
▾Field Inspections (DOB CAP) — 4
DateTypeResultReport
11/08/2021Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
11/04/2021Pass-Final PL - Up to 3 Requested FloorsPassView ↗
10/30/2021Pass-Final PL - Up to 3 Requested FloorsPassView ↗
10/20/2021Certified Gas-Gas-Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 12
DateRequirementInspectorRole
10/24/2021Maintenance informationXIAO ZHENGenergy_progress
10/24/2021Fire-Resistant Penetrations and JointsXIAO ZHENGspecial
10/24/2021Energy Code Compliance InspectionsXIAO ZHENGprogress
10/24/2021HVAC-R and service water piping design and insulationXIAO ZHENGenergy_progress
10/24/2021HVAC-R and service water heating equipmentXIAO ZHENGenergy_progress
10/24/2021HVAC-R and service water heating system controlsXIAO ZHENGenergy_progress
10/20/2021Fire-Resistant Penetrations and JointsXIAO ZHENGspecial
10/20/2021Energy Code Compliance InspectionsXIAO ZHENGprogress
10/20/2021HVAC-R and service water piping design and insulationXIAO ZHENGenergy_progress
10/20/2021HVAC-R and service water heating equipmentXIAO ZHENGenergy_progress
10/20/2021Maintenance informationXIAO ZHENGenergy_progress
10/20/2021HVAC-R and service water heating system controlsXIAO ZHENGenergy_progress
▾Documents — 19 on file (BIS + DOB NOW)
▸Plans & Drawings2
▸DOB NOWPlans/Sketch2
08/27/2026Q00560879-I1Request digital key ↗
08/27/2026Q00560879-P1Request digital key ↗
▸Seals & Professional Certifications14
▸DOB NOWProgress Inspector Seal & Signature10
09/01/2026Q00560879-P1Open ↗
09/01/2026Q00560879-P1Open ↗
09/01/2026Q00560879-P1Open ↗
Showing 3 of 10 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature2
08/13/2026Q00560879-P1Open ↗
08/13/2026Q00560879-I1Open ↗
▸DOB NOWSpecial Inspector Seal & Signature2
09/01/2026Q00560879-P1Open ↗
08/24/2026Q00560879-I1Open ↗
▸Environmental & Asbestos2
▸DOB NOWDEP ACP-5: Asbestos Assessment Report2
08/13/2026Q00560879-I1Open ↗
08/13/2026Q00560879-P1Open ↗
▸Energy Compliance1
▸DOB NOWEN2: As Built Energy Analysis.1
08/13/2026Q00560879-I1Open ↗