← Back
Three families
32-46 99 STREET
QUEENS · BIN 4625762
💬 Discuss this project
2023Year Built
2Stories
C0Building Class
R4Zoning
2,580 sfGross Floor Area
3Units
Rent Stabilized0 Open Violations
Three families · Owner of record: FANGTASTIC LLC · 3,000 sf lot · 0.86 FAR built · Flood zone X
Locations of Work
ArchitectureElectricalPlumbingFire ProtectionGeneral
Floor 233p · 2 filings · 20 docs
Floor 130p · 2 filings · 20 docs
Cellar33p · 2 filings · 20 docs
1 job · most recent 11/26/2023
General Wiring
FiledStatusContractorScope
11/26/2023CompletePOWER SURGE ELECTRIC, INCGeneral Wiring
1 job · most recent 03/01/2024
FiledStatusContractorScope
03/01/2024Signed-offJ&J DESIGNS INC1 scope_items
Building Lifecycle
All (61)Filed (8)Permit Issued (5)Signed Off (4)Inspection (10)Objection (16)Special Inspection (18)
08/22/2025
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
07/29/2024
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
04/26/2024
Signed off — Alteration
HEREWITH FILED PLUMBING AND SPRINKLER WORK FOR A NEW 2-STORY 3-FAMILY BUILDING
Q08003595-I1
04/17/2024
Signed off — Alteration
THIS APPLICATION IS BEING FILED FOR A TEMPORARY CONSTRUCTION FENCE
Q00734866-I1
04/12/2024
Signed off — Alteration
INSTALL TEMP. CONSTRUCTION FENCE IN CONJUNCTION WITH NB #Q00785186.
Q00929783-I1
04/10/2024
Signed off — New Building
INSTALL (1) 8' LONG NEW CURB CUT
Q00785186-S1
04/09/2024
Inspection — Pass-Final Curb Cut Non-Directive 14
Pass
View inspection ↗
04/05/2024
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
04/05/2024
Special inspection requirement — HVAC-R and service water heating system controls
DEZHANG FANG
04/05/2024
Special inspection requirement — Private On-Site Storm Water Disposal Systems-, and Detention Facilities, Installation
DEZHANG FANG
04/05/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
DEZHANG FANG
04/05/2024
Special inspection requirement — Soil Percolation Test - Private On-Site Storm Water Drainage Disposal Systems, and Detention Facilities
SOORJBALLY HARILALL
04/05/2024
Special inspection requirement — Sprinkler Systems
DEZHANG FANG
04/05/2024
Special inspection requirement — Energy Code Compliance Inspections
DEZHANG FANG
04/05/2024
Special inspection requirement — HVAC-R and service water heating equipment
DEZHANG FANG
04/05/2024
Special inspection requirement — Maintenance information
DEZHANG FANG
04/05/2024
Special inspection requirement — HVAC-R and service water piping design and insulation
DEZHANG FANG
04/03/2024
Filed — Alteration
HEREWITH FILED PLUMBING AND SPRINKLER WORK FOR A NEW 2-STORY 3-FAMILY BUILDING
Q08003595-P2
04/01/2024
Permit issued — Curb Cut
Q00785186-S1-CC
03/20/2024
Inspection — Fail-Final CND-Occupancy Inspection
Fail
View inspection ↗
03/01/2024
Filed — New Building
INSTALL (1) 8' LONG NEW CURB CUT
Q00785186-P1
12/08/2023
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
12/08/2023
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
10/27/2023
Inspection — Certified Storm Drainage-ST-Piping-Underground
Certified
View inspection ↗
10/18/2023
Inspection — Certified Storm Drainage-ST-Piping-Underground
Certified
View inspection ↗
10/18/2023
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
10/12/2023
Permit issued — Plumbing
Q08003595-I1-PL
10/02/2023
Filed — Alteration
HEREWITH FILED PLUMBING AND SPRINKLER WORK FOR A NEW 2-STORY 3-FAMILY BUILDING
Q08003595-P1
09/29/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
DEZHANG FANG
09/29/2023
Special inspection requirement — Private On-Site Storm Water Disposal Systems-, and Detention Facilities, Installation
DEZHANG FANG
09/29/2023
Special inspection requirement — Soil Percolation Test - Private On-Site Storm Water Drainage Disposal Systems, and Detention Facilities
SOORJBALLY HARILALL
09/29/2023
Special inspection requirement — Sprinkler Systems
DEZHANG FANG
09/29/2023
Special inspection requirement — Energy Code Compliance Inspections
DEZHANG FANG
09/29/2023
Special inspection requirement — HVAC-R and service water heating equipment
DEZHANG FANG
09/29/2023
Special inspection requirement — HVAC-R and service water piping design and insulation
DEZHANG FANG
09/29/2023
Special inspection requirement — HVAC-R and service water heating system controls
DEZHANG FANG
09/29/2023
Special inspection requirement — Maintenance information
DEZHANG FANG
09/14/2023
Filed — Alteration
HEREWITH FILED PLUMBING AND SPRINKLER WORK FOR A NEW 2-STORY 3-FAMILY BUILDING
Q08003595-I1
09/12/2023
Permit issued — General Construction
Q00785186-I1-GC-CX
09/07/2023
Permit issued — Construction Fence
Q00929783-I1-FN
09/06/2023
Filed — Alteration
INSTALL TEMP. CONSTRUCTION FENCE IN CONJUNCTION WITH NB #Q00785186.
Q00929783-I1
08/11/2023
Objection resolved — Addressed
08/11/2023
Objection resolved — Addressed
05/11/2023
Objection resolved — Addressed
05/11/2023
Objection resolved — Addressed
05/11/2023
Objection resolved — Addressed
05/11/2023
Objection resolved — Addressed
12/14/2022
Objection raised — Other
12/14/2022
Objection resolved — Addressed
12/12/2022
Objection raised — Inspections
12/12/2022
Objection resolved — Addressed
12/05/2022
Filed — New Building
INSTALL (1) 8' LONG NEW CURB CUT
Q00785186-S1
08/30/2022
Objection raised — Admin
08/30/2022
Objection raised — Zoning
08/30/2022
Objection raised — Admin
08/30/2022
Objection raised — Fire_Protection
08/30/2022
Objection raised — Accessibility
08/30/2022
Objection raised — Energy
08/22/2022
Filed — New Building
INSTALL (1) 8' LONG NEW CURB CUT
Q00785186-I1
06/24/2022
Permit issued — Construction Fence
Q00734866-I1-FN
Latest 60 of 61 events.
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
ATOMIC CONTRACTING404/09/2026
FONGTASY2104/09/2026
FANGTASTIC LLC103/22/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
04/13/2022$995K—— → —— not available
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
ALPHA HOME DESIGN LLC204/03/2024
FANG ARCHITECT503/01/2024
SION CONSULTING ENGINEERING PC105/13/2022
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
SION CONSULTING ENGINEERING203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
J&J DESIGNS INCGeneral Contractor304/09/2026
ATOMIC CONTRACTING INCGeneral Contractor104/09/2026
RENEW PLUMBING CORPPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
BIG APPLE GROUP NY A RMA9168304/03/2024
FANG ARCHITECT5513504/03/2024
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWCurb CutSigned-offJ&J DESIGNS INC04/01/2024
DOB NOWPlumbingSigned-offRENEW PLUMBING CORP10/12/2023
DOB NOWGeneral ConstructionPermit IssuedJ&J DESIGNS INC09/12/2023
DOB NOWConstruction FenceSigned-offJ&J DESIGNS INC09/07/2023
DOB NOWConstruction FenceSigned-offATOMIC CONTRACTING INC06/24/2022
▾Field Inspections (DOB CAP) — 10
DateTypeResultReport
08/22/2025Pass-Final CND-Occupancy InspectionPassView ↗
07/29/2024Pass-Final CND-Occupancy InspectionPassView ↗
04/09/2024Pass-Final Curb Cut Non-Directive 14PassView ↗
04/05/2024Pass-Final CND-Occupancy InspectionPassView ↗
03/20/2024Fail-Final CND-Occupancy InspectionFailView ↗
12/08/2023Certified Gas-Gas-Piping-RoughingCertifiedView ↗
12/08/2023Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
10/27/2023Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
10/18/2023Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
10/18/2023Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 18
DateRequirementInspectorRole
04/05/2024HVAC-R and service water heating system controlsDEZHANG FANGenergy_progress
04/05/2024Private On-Site Storm Water Disposal Systems-, and Detention Facilities, InstallationDEZHANG FANGspecial
04/05/2024Fire-Resistant Penetrations and JointsDEZHANG FANGspecial
04/05/2024Soil Percolation Test - Private On-Site Storm Water Drainage Disposal Systems, and Detention FacilitiesSOORJBALLY HARILALLspecial
04/05/2024Sprinkler SystemsDEZHANG FANGspecial
04/05/2024Energy Code Compliance InspectionsDEZHANG FANGprogress
04/05/2024HVAC-R and service water heating equipmentDEZHANG FANGenergy_progress
04/05/2024Maintenance informationDEZHANG FANGenergy_progress
04/05/2024HVAC-R and service water piping design and insulationDEZHANG FANGenergy_progress
09/29/2023Fire-Resistant Penetrations and JointsDEZHANG FANGspecial
09/29/2023Private On-Site Storm Water Disposal Systems-, and Detention Facilities, InstallationDEZHANG FANGspecial
09/29/2023Soil Percolation Test - Private On-Site Storm Water Drainage Disposal Systems, and Detention FacilitiesSOORJBALLY HARILALLspecial
09/29/2023Sprinkler SystemsDEZHANG FANGspecial
09/29/2023Energy Code Compliance InspectionsDEZHANG FANGprogress
09/29/2023HVAC-R and service water heating equipmentDEZHANG FANGenergy_progress
09/29/2023HVAC-R and service water piping design and insulationDEZHANG FANGenergy_progress
09/29/2023HVAC-R and service water heating system controlsDEZHANG FANGenergy_progress
09/29/2023Maintenance informationDEZHANG FANGenergy_progress
▾Documents — 65 on file (BIS + DOB NOW)
▸Plans & Drawings8
▸DOB NOWPlans/Sketch8
08/26/2026Q00734866-I1Request digital key ↗
08/24/2026Q00929783-I1Request digital key ↗
08/24/2026Q08003595-P2Request digital key ↗
Showing 3 of 8 on file for this type
▸Applications & Permits2
▸BISBPP-5 - Authorization to the Department of Transportation1
02/22/2023440759458Open ↗
▸BISPLAN / WORK APPROVAL APPLICATION1
12/07/2022440759458Open ↗
▸Zoning, Tax Lot & Property Records8
▸DOB NOWZD1: DOB Zoning Diagram2
08/13/2026Q00785186-P1Open ↗
08/13/2026Q00785186-I1Open ↗
▸DOB NOWRestrictive Declaration/Easement 22
08/13/2026Q00785186-P1Open ↗
08/13/2026Q00785186-I1Open ↗
▸DOB NOWRestrictive Declaration/Easement 12
08/13/2026Q00785186-P1Open ↗
08/13/2026Q00785186-I1Open ↗
▸BISTAX LOT: TENTATIVE LOT NUMBER ISSUED1
12/07/2022440759458Open ↗
▸DOB NOWHouse Number Verification: TOPO Stamp1
08/13/2026Q00785186-I1Open ↗
▸Seals & Professional Certifications18
▸DOB NOWDPL-1: Design Professional Seal & Signature8
08/26/2026Q00734866-I1Open ↗
08/24/2026Q00929783-I1Open ↗
08/24/2026Q08003595-P2Open ↗
Showing 3 of 8 on file for this type
▸DOB NOWProgress Inspector Seal & Signature4
08/25/2026Q08003595-I1Open ↗
08/25/2026Q08003595-I1Open ↗
08/24/2026Q08003595-P1Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature4
08/25/2026Q08003595-I1Open ↗
08/25/2026Q08003595-I1Open ↗
08/24/2026Q08003595-P1Open ↗
Showing 3 of 4 on file for this type
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY1
12/07/2022440759458Open ↗
▸BISAPPLICANT OWNER SIGNATURE1
12/07/2022440759458Open ↗
▸Trade Schedules & Equipment2
▸DOB NOWDEP: Sewer Certification (Sanitary/Storm)2
08/13/2026Q00785186-P1Open ↗
08/13/2026Q00785186-I1Open ↗
▸Safety & Tenant Protection10
▸BISSTREET TREE CHECKLIST2
12/07/2022440759458Open ↗
12/07/2022440759458Open ↗
▸DOB NOWStreet Tree Checklist2
08/23/2026Q00785186-P1Open ↗
08/15/2026Q00785186-I1Open ↗
▸BISSTREET TREES SITE PLAN1
12/07/2022440759458Open ↗
▸BISSTREET TREE SUPPORTING DOCUMENT1
12/07/2022440759458Open ↗
▸BISSTREET TREE SIGNOFF1
04/10/2024440759458Open ↗
▸DOB NOWStreet Trees Site Plan1
08/13/2026Q00785186-I1Open ↗
▸DOB NOWStreet Tree Sign Off1
08/13/2026Q00785186-I1Open ↗
▸DOB NOWParks Department Acknowledgment Letter for Street Trees Plan1
08/13/2026Q00785186-I1Open ↗
▸Energy Compliance1
▸DOB NOWEN2: As Built Energy Analysis1
08/13/2026Q00785186-I1Open ↗
▸Filing & Intake Forms3
▸BISADDITIONAL INFORMATION2
02/23/2023440759458Open ↗
12/09/2022440759458Open ↗
▸BISEFILING JOB APPLICATION COVER SHEET1
12/07/2022440759458Open ↗
▸Other Documents13
▸BISBPP - SUPPORTING DOCUMENTATION3
02/23/2023440759458Open ↗
02/21/2023440759458Open ↗
02/21/2023440759458Open ↗
▸DOB NOWSite Survey: Initial2
08/13/2026Q00785186-I1Open ↗
08/13/2026Q00785186-P1Open ↗
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone2
08/13/2026Q00785186-P1Open ↗
08/13/2026Q00785186-I1Open ↗
▸DOB NOWProperty Ownership Certification2
08/23/2026Q00785186-P1Open ↗
08/15/2026Q00785186-I1Open ↗
▸BISBPP: PHOTOS-SIGNED/SEALED BY APPLICANT1
12/09/2022440759458Open ↗
▸BISBPP-DOT: RELOCATE STREET LIGHT1
02/21/2023440759458Open ↗
▸DOB NOWFinal Survey1
08/13/2026Q00785186-I1Open ↗
▸DOB NOWAdjoining Owners Notification1
08/13/2026Q00785186-I1Open ↗