← Back
QUEENS
The 103-21 Northern Blvd Condominium
32-54 NORTHERN BOULEVARD · BIN 4617751
💬 Discuss this project
—Year Built
—Stories
—Building Class
R6AZoning
—Gross Floor Area
—Units
0 Open ViolationsFDNY Report ↗
4,322 sf lot · Flood zone X
Locations of Work
ArchitectureMechanicalFire Protection
Roof5p · 1 filing · 6 docs
Floor 45p · 1 filing · 6 docs
Floor 35p · 1 filing · 6 docs
Floor 26p · 2 filings · 16 docs
Floor 111p · 3 filings · 20 docs
Cellar7p · 1 filing · 6 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
TRIERA CONTRACTING407/08/2026
INTEGRAL HELP GROUP1807/08/2026
DA HAI CONSTRUCTION1203/22/2026
OWNER OF 103-21 NOTHERN B403/22/2026
103-21 NORTHERN1903/21/2026
METRO CONTRACTING NY203/21/2026
NEW AMERICAN CONSTRUCTION103/21/2026
103-21 NORTHERN BOULEVARD103/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
WOJCIECH ORZECHOWSKI ARCHITECT211/28/2022
WJY ELECTRIC INC.411/16/2022
ROYAL ENGINEERING, P.C109/10/2019
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
JRK CREATIVE803/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
PONOS HOME IMPROVEMENTGeneral Contractor603/21/2026
BRANDL ELECTRIC INC.Electrical103/22/2026
DOVAL PLBG & HTG CORPFire Protection107/08/2026
TRIERA CONTRACTING INCGeneral Contractor107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
ORZECHOWSKI ARCHITECT PLL8235211/28/2022
EDRA ENGINEERING & INSPEC2820411/16/2022
Building Lifecycle
All (52)Filed (7)Permit Issued (4)Signed Off (1)Violation (37)Inspection (3)
06/13/2025
Violation issued (HPD, closed)
A
11/28/2022
Filed — Alteration CO
NEW FLOOR LAYOUT WITH OFFICES AT GROUND FLOOR. CHANGE OF USE AND OCCUPANCY FROM A STORE (MERCANTILE) TO SOCIAL WORK OFFICES (BUSINESS). WORK INCLUDES NEW INTERIOR PARTITIONS, CEILINGS AND LIGHTING.
Q00766425-P1
11/16/2022
Filed — Alteration
INSTALLATION OF NEW MECHANICAL SYSTEM AS PER PLANS FILED HEREWITH, IN CONJUNCTION WITH DOB NOW JOB Q00766425-I1. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
Q00774084-P1
11/16/2022
Filed — Alteration
INSTALLATION OF NEW SPRINKLER HEADS AS PER PLANS FILED HEREWITH, IN CONJUNCTION WITH DOB NOW JOB Q00766425-I1. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
Q00774197-P1
10/28/2022
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
10/26/2022
Inspection — Certified Sprinkler-SP-Fixtures-Finish
Certified
View inspection ↗
10/25/2022
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
10/22/2022
Permit issued — Mechanical Systems
Q00774084-I1-MS
09/30/2022
Permit issued — Sprinklers
Q00774197-I1-EW-SP
08/31/2022
Filed — Alteration
INSTALLATION OF NEW MECHANICAL SYSTEM AS PER PLANS FILED HEREWITH, IN CONJUNCTION WITH DOB NOW JOB Q00766425-I1. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
Q00774084-I1
08/25/2022
Permit issued — General Construction
Q00766425-I1-GC
07/25/2022
Filed — Alteration
INSTALLATION OF NEW SPRINKLER HEADS AS PER PLANS FILED HEREWITH, IN CONJUNCTION WITH DOB NOW JOB Q00766425-I1. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
Q00774197-I1
07/11/2022
Filed — Alteration CO
NEW FLOOR LAYOUT WITH OFFICES AT GROUND FLOOR. CHANGE OF USE AND OCCUPANCY FROM A STORE (MERCANTILE) TO SOCIAL WORK OFFICES (BUSINESS). WORK INCLUDES NEW INTERIOR PARTITIONS, CEILINGS AND LIGHTING.
Q00766425-I1
08/26/2021
Violation issued (FDNY_ORDER, closed)
06/24/2021
Signed off — Alteration
Q00224142-I1
09/16/2020
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
06/15/2020
Violation issued (ECB, closed)
Site Safety
06/15/2020
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
06/15/2020
Violation issued (ECB, closed)
Construction
09/11/2019
Permit issued — Supported Scaffold
Q00224142-I1-SF
09/10/2019
Filed — Alteration
Q00224142-I1
05/31/2017
Violation issued (ECB, closed)
Construction
05/31/2017
Violation issued (ECB, closed)
Construction
05/31/2017
Violation issued (ECB, closed)
Construction
05/31/2017
Violation issued (ECB, closed)
Construction
05/31/2017
Violation issued (ECB, closed)
Construction
05/31/2017
Violation issued (ECB, closed)
Construction
05/31/2017
Violation issued (ECB, closed)
Construction
11/16/2015
Violation issued (ECB, closed)
Construction
11/16/2015
Violation issued (ECB, closed)
Construction
11/16/2015
Violation issued (ECB, closed)
Construction
11/16/2015
Violation issued (ECB, closed)
Construction
07/30/2009
Violation issued (ECB, closed)
Signs
07/30/2009
Violation issued (ECB, closed)
Signs
07/27/2009
Violation issued (ECB, closed)
Signs
07/27/2009
Violation issued (ECB, closed)
Signs
07/27/2009
Violation issued (ECB, closed)
Signs
10/15/2004
Violation issued (ECB, closed)
Construction
06/18/2001
Violation issued (ECB, closed)
Construction
06/18/2001
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
06/18/2001
Violation issued (ECB, closed)
Construction
09/15/2000
Violation issued (DOB, closed)
VW*-VIOLATION - WORK W/O PERMIT DISMISSED
09/15/2000
Violation issued (ECB, closed)
Construction
09/15/2000
Violation issued (ECB, closed)
Construction
08/04/1999
Violation issued (ECB, closed)
Construction
07/22/1999
Violation issued (ECB, closed)
Construction
07/22/1999
Violation issued (ECB, closed)
Construction
05/12/1995
Violation issued (ECB, closed)
Construction
05/12/1995
Violation issued (ECB, closed)
Construction
04/04/1995
Violation issued (ECB, closed)
Construction
04/04/1995
Violation issued (ECB, closed)
Construction
03/13/1995
Violation issued (ECB, closed)
Construction
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWMechanical SystemsPermit IssuedPONOS HOME IMPROVEMENT10/22/2022
DOB NOWSprinklersPermit IssuedDOVAL PLBG & HTG CORP09/30/2022
DOB NOWGeneral ConstructionPermit IssuedPONOS HOME IMPROVEMENT08/25/2022
DOB NOWSupported ScaffoldSigned-offTRIERA CONTRACTING INC09/11/2019
BISPLISSUEDPETER PLUMBING ASSOC. INC.01/25/2021
BIS—ISSUEDDA HAI CONSTRUCTION INC09/18/2020
BISEQISSUEDMETRO CONTRACTING NY, INC.07/10/2020
BIS—ISSUEDDA HAI CONSTRUCTION INC07/01/2020
BISEQISSUEDDA HAI CONSTRUCTION INC07/01/2020
BISPLISSUEDPETER PLUMBING ASSOC. INC.10/04/2019
BIS—ISSUEDDA HAI CONSTRUCTION INC06/27/2019
BISEQISSUEDDA HAI CONSTRUCTION INC06/25/2019
BIS—ISSUEDDA HAI CONSTRUCTION INC06/25/2019
BISEQISSUEDMETRO CONTRACTING NY, INC.10/04/2018
BISEQISSUEDDA HAI CONSTRUCTION INC06/27/2018
BIS—ISSUEDDA HAI CONSTRUCTION INC06/27/2018
BISPLISSUEDPETER PLUMBING ASSOC. INC.04/18/2018
BISEQISSUEDMETRO CONTRACTING NY, INC.10/13/2017
BISEQISSUEDDA HAI CONSTRUCTION INC06/22/2017
BIS—ISSUEDDA HAI CONSTRUCTION INC06/22/2017
BISPLISSUEDPETER PLUMBING ASSOC. INC.03/22/2017
BISEQISSUEDNEW AMERICAN CONSTRUCTION INC11/15/2016
BISEQISSUEDMETRO CONTRACTING NY, INC.10/06/2016
BIS—ISSUEDDA HAI CONSTRUCTION INC06/17/2016
BISEQISSUEDDA HAI CONSTRUCTION INC06/17/2016
BIS—ISSUEDDA HAI CONSTRUCTION INC06/17/2016
BISEQISSUEDMETRO CONTRACTING NY, INC.10/16/2015
BISOTISSUEDDA HAI CONSTRUCTION INC06/15/2015
BISEQISSUEDDA HAI CONSTRUCTION INC06/15/2015
BIS—ISSUEDDA HAI CONSTRUCTION INC06/15/2015
BIS—ISSUEDDA HAI CONSTRUCTION INC06/15/2015
BISOTISSUEDDA HAI CONSTRUCTION INC04/21/2015
BIS—ISSUEDDA HAI CONSTRUCTION INC04/20/2015
BIS—ISSUEDDA HAI CONSTRUCTION INC04/20/2015
BIS—ISSUEDDA HAI CONSTRUCTION INC12/09/2014
BISEQISSUEDDA HAI CONSTRUCTION INC12/09/2014
BIS—ISSUEDDA HAI CONSTRUCTION INC12/09/2014
BISEQISSUEDMETRO CONTRACTING NY, INC.10/28/2014
BISPLISSUEDDALEYS PLG AND HEATING02/08/1991
BISOTISSUEDHOMEGIRLS SIZZLING SEAFOOD10/30/1990
1 project · most recent 11/16/2022
Air Conditioning Systems
FiledStatusContractorScopeMake / Model / Capacity
11/16/2022Permit IssuedPONOS HOME IMPROVEMENTAir Conditioning Systems
Cooling
United Cool Air C10G3ASHA 114,200 BTU ×1
1 project · most recent 11/16/2022
FiledStatusContractorScope
11/16/2022Permit IssuedDOVAL PLBG & HTG CORP25 heads
3 projects · most recent 08/16/2022
General Wiring
FiledStatusContractorScope
08/16/2022CompleteBRANDL ELECTRIC INC.General Wiring
07/07/2021CompleteTUXEDO ELEC'L CONTR'G INC—
04/21/2021CompleteV. VASS ELECTRIC CORPGeneral Wiring
▾Field Inspections (DOB CAP) — 3
DateTypeResultReport
10/28/2022Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
10/26/2022Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
10/25/2022Pass-Final CND-Occupancy InspectionPassView ↗
▾Special Inspection Requirements (DOB NOW) — 7
DateRequirementInspectorRole
11/13/2022FinalEDWARD RACZKOWSKIprogress
11/13/2022Fire-Resistant Penetrations and JointsEDWARD RACZKOWSKIspecial
11/13/2022Mechanical SystemsEDWARD RACZKOWSKIspecial
11/13/2022Sprinkler SystemsEDWARD RACZKOWSKIspecial
08/31/2022Fire-Resistant Penetrations and JointsEDWARD RACZKOWSKIspecial
07/13/2022Mechanical SystemsEDWARD RACZKOWSKIspecial
07/13/2022FinalEDWARD RACZKOWSKIprogress
▾Documents — 218 on file (BIS + DOB NOW)
▸Plans & Drawings7
▸DOB NOWPlans/Sketch6
08/25/2026Q00774197-P1Request digital key ↗
08/25/2026Q00774197-I1Request digital key ↗
08/25/2026Q00774084-I1Request digital key ↗
Showing 3 of 6 on file for this type
▸DOB NOWPlans/Sketch - Supported Scaffold1
08/28/2026Q00224142-I1Request digital key ↗
▸Applications & Permits60
▸BISPLAN / WORK APPROVAL APPLICATION33
12/20/2022421813568Open ↗
06/03/2022400136893Open ↗
10/25/2021421637125Open ↗
Showing 3 of 33 on file for this type
▸BISWORK PERMIT APPLICATION20
08/17/2020440179691Open ↗
07/20/2019420785948Open ↗
07/18/2019420785948Open ↗
Showing 3 of 20 on file for this type
▸BISPLAN - WORK & PERMITS - SUPPPORTING DOCUMENTATION4
09/20/2021400136893Open ↗
09/20/2021400136893Open ↗
08/12/2021420513377Open ↗
Showing 3 of 4 on file for this type
▸BISBPP-5 - Authorization to the Department of Transportation2
10/23/2020420803580Open ↗
01/23/2013420803580Open ↗
▸BISCERTIFICATE OF OCCUPANCY: APPLICATION1
06/14/2021420785948Open ↗
▸Zoning, Tax Lot & Property Records3
▸BISVERIFY TAX LOT1
07/12/2021420785948Open ↗
▸BISCO OBJ: VERIFY ADDRESS-TOPO STAMP1
08/20/2021420785948Open ↗
▸BISZONING DIAGRAM1
03/14/2013420785948Open ↗
▸Seals & Professional Certifications32
▸DOB NOWDPL-1: Design Professional Seal & Signature7
08/28/2026Q00224142-I1Open ↗
08/25/2026Q00774197-P1Open ↗
08/25/2026Q00774197-I1Open ↗
Showing 3 of 7 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION5
11/08/2014420785948Open ↗
03/11/2013420785948Open ↗
12/13/2011420513377Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature5
08/23/2026Q00774084-P1Open ↗
08/23/2026Q00774084-P1Open ↗
08/22/2026Q00774084-I1Open ↗
Showing 3 of 5 on file for this type
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION3
11/14/2016440361733Open ↗
10/24/2014440179691Open ↗
04/30/2014440141142Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT3
11/14/2016440361733Open ↗
10/24/2014440179691Open ↗
04/30/2014440141142Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY3
11/14/2016440361733Open ↗
10/24/2014440179691Open ↗
04/30/2014440141142Open ↗
▸BISPROFESSIONAL CERTIFIED CHECKLIST2
01/23/2013420803580Open ↗
12/13/2011420513377Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM2
01/23/2013420803580Open ↗
12/13/2011420513377Open ↗
▸DOB NOWProgress Inspector Seal & Signature2
08/23/2026Q00774084-P1Open ↗
08/22/2026Q00774084-I1Open ↗
▸Trade Schedules & Equipment16
▸BISSCHEDULE B - PLUMBING9
06/24/2021420785948Open ↗
01/04/2021420785948Open ↗
12/30/2020420785948Open ↗
Showing 3 of 9 on file for this type
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE4
12/18/2018420785948Open ↗
08/07/2018420785948Open ↗
07/20/2018420785948Open ↗
Showing 3 of 4 on file for this type
▸BISDETECTOR:SMOKE-CERT. OF INSTALLATION1
09/29/2021420785948Open ↗
▸BISDETECTOR:CARBON MONOXIDE-CERT.OF INSTALL1
09/29/2021420785948Open ↗
▸BISSEWER CONNECTION: DEP SD1 & SD21
03/11/2013420785948Open ↗
▸Safety & Tenant Protection6
▸BISSTREET TREE CHECKLIST1
11/15/2012420785948Open ↗
▸BISSTREET TREES SITE PLAN1
07/12/2021420785948Open ↗
▸BISEXCAVATION OR DEMOLITION: 5-DAY NOTICE1
10/17/2014420785948Open ↗
▸BISSTREET TREE SIGNOFF1
07/12/2021420785948Open ↗
▸BISSTREET TREES: RECEIPT OF STREET TREES SITE PLAN1
01/12/2021420785948Open ↗
▸DOB NOWTenant Protection Plan1
08/13/2026Q00224142-I1Open ↗
▸Environmental & Asbestos2
▸BISASBESTOS EXEMPTION CERTIFICATION LETTER1
01/23/2013420803580Open ↗
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'1
12/13/2011420513377Open ↗
▸Energy Compliance5
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY1
06/22/2021420785948Open ↗
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS1
03/11/2013420785948Open ↗
▸BISTECHNICAL REPORT: ENERGY1
12/13/2011420513377Open ↗
▸BISAS-BUILT ENERGY ANALYSIS1
07/12/2021420785948Open ↗
▸BISTR8: Energy Code Progress Inspections1
11/08/2014420785948Open ↗
▸Inspections & Test Reports18
▸BISTECHNICAL REPORT: RESPONSIBILITY10
12/17/2021440361733Open ↗
12/17/2021440361733Open ↗
07/08/2021420785948Open ↗
Showing 3 of 10 on file for this type
▸BISTECHNICAL REPORT: CONCRETE/TEST CYLINDER3
09/29/2021420785948Open ↗
11/08/2014420785948Open ↗
10/15/2014420785948Open ↗
▸BISTECHNICAL REPORT: CONCRETE DESIGN MIX2
11/08/2014420785948Open ↗
10/15/2014420785948Open ↗
▸BISTECHNICAL REPORT: SOIL INSPECTION1
03/11/2013420785948Open ↗
▸BISHYDRO FLOW TEST LETTER1
03/11/2013420785948Open ↗
▸BISDEMOLITION (DM) JOB SIGNOFF1
01/10/2022420785948Open ↗
▸Approvals, Objections & Sign-offs22
▸BISLETTERS - SUPPORTING DOCUMENTATION10
08/17/2020440179691Open ↗
08/17/2020440179691Open ↗
11/19/2018440179691Open ↗
Showing 3 of 10 on file for this type
▸BISSCHEDULE A - OCCUPANCY / USE4
07/07/2021420785948Open ↗
06/21/2021420785948Open ↗
09/15/2020420785948Open ↗
Showing 3 of 4 on file for this type
▸BISADMINISTRATIVE OBJECTIONS3
01/23/2013420803580Open ↗
11/15/2012420785948Open ↗
12/13/2011420513377Open ↗
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST3
12/22/2021440361733Open ↗
07/20/2021440141142Open ↗
06/21/2021440179691Open ↗
▸BISSHED LETTER1
11/02/2015440179691Open ↗
▸BISBPP-8 - Request Items for Builders Pavement Plan Signoff1
12/16/2021420803580Open ↗
▸Cost, Insurance & Ownership11
▸BISPROJECT-SPECIFIC GL INSURANCE6
07/20/2019420785948Open ↗
07/06/2018420785948Open ↗
06/29/2017420785948Open ↗
Showing 3 of 6 on file for this type
▸BISCOST AFFIDAVIT3
06/06/2018421637125Open ↗
04/30/2014440141142Open ↗
12/13/2011420513377Open ↗
▸BISCOST AFFIDAVIT (FINAL): PW31
07/20/2021440141142Open ↗
▸BISAcord 25 (Acord Certificate of Liability Insurance)1
07/20/2019420785948Open ↗
▸Filing & Intake Forms24
▸BISADDITIONAL INFORMATION9
03/14/2022420785948Open ↗
09/10/2021420785948Open ↗
07/19/2021420785948Open ↗
Showing 3 of 9 on file for this type
▸BISEFILING COVER SHEET6
12/20/2022421813568Open ↗
06/06/2018421637125Open ↗
03/05/2013420785948Open ↗
Showing 3 of 6 on file for this type
▸BISBOROUGH INTAKE FORM4
06/02/2022400136893Open ↗
08/17/2020440179691Open ↗
08/07/2018420785948Open ↗
Showing 3 of 4 on file for this type
▸BISEFILING JOB APPLICATION COVER SHEET3
11/14/2016440361733Open ↗
10/24/2014440179691Open ↗
04/30/2014440141142Open ↗
▸BISBPP: CHECKLIST IN LIEU OF PLANS-ALT32
01/23/2013420803580Open ↗
01/23/2013420803580Open ↗
▸Other Documents12
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION4
01/09/2023421813568Open ↗
01/09/2023421813568Open ↗
10/25/2021421637125Open ↗
Showing 3 of 4 on file for this type
▸BISPLOT DIAGRAM2
08/20/2021420785948Open ↗
11/15/2012420785948Open ↗
▸BISSEPTIC - SUPPORTING DOCUMENTATION2
10/15/2014420785948Open ↗
10/15/2014420785948Open ↗
▸DOB NOWProperty Ownership Certification2
08/13/2026Q00766425-P1Open ↗
08/13/2026Q00766425-I1Open ↗
▸BISPROTECTION OF EXPOSED FOUNDATION INSULATION1
08/20/2021420785948Open ↗
▸BISRESTRICTION: DEED1
06/03/2022400136893Open ↗