← Back
BuildNYC
Two family converted from one family
32 BAY 34 STREET
BROOKLYN · BIN 3185426
💬 Discuss this project
1935Year Built
2Stories
B3Building Class
R5Zoning
2,200 sfGross Floor Area
2Units
Rent Stabilized0 Active ViolationsFDNY Report ↗
Two family converted from one family · 2,417 sf lot · 0.91 FAR built · Flood zone X500
Locations of Work
ArchitectureElectricalPlumbing
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Floor 2HVAC and plumbing system installation2p · 1 filing · 20 docs
Floor 1HVAC and plumbing system installation2p · 1 filing · 20 docs
CellarHVAC and plumbing system installation7p · 1 filing · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
Innospark Design610/04/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
01/09/2026$1.3M—Private party → Private party$586/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Aaron McDonald Architect409/23/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Buildwise Construction GRGeneral Contractor104/09/2026
W.R. Plumbing and HeatingPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Aaron McDonald Architect5118409/23/2026
Building Lifecycle
11/19/2026
Signed off — Alteration
INSTALL NEW BOILER, H.W.H.,BATHROOM AND KITCHEN FIXTURES IN THE EXISTING 2 STORY BUILDING. PLUMBING WORKS AS PER PLAN. NO CHANGE IN EGRESS, USE, OR OCCUPANCY.
B01358173-I1
11/19/2026
Signed off — Alteration
INSTALL NEW BOILER, H.W.H.,BATHROOM AND KITCHEN FIXTURES IN THE EXISTING 2 STORY BUILDING. PLUMBING WORKS AS PER PLAN. NO CHANGE IN EGRESS, USE, OR OCCUPANCY.
B01358173-S1
09/23/2026
Filed — Alteration
INSTALL NEW BOILER, H.W.H.,BATHROOM AND KITCHEN FIXTURES IN THE EXISTING 2 STORY BUILDING. PLUMBING WORKS AS PER PLAN. NO CHANGE IN EGRESS, USE, OR OCCUPANCY.
B01358173-P2
09/22/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
Aaron McDonald
09/22/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
Aaron McDonald
33 history events on file for this building. Sign in free to see the full history. Sign in · Create account
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingSigned-offW.R. Plumbing and Heating02/24/2026
DOB NOWGeneral ConstructionSigned-offBuildwise Construction GR02/24/2026
1 project · most recent 09/23/2026
Gas Storm Water/Sanitary
FiledStatusContractorScope
09/23/2026Signed-offW.R. Plumbing and HeatingGas, Storm, Water/Sanitary
1 project · most recent 10/29/2026
General Wiring
FiledStatusContractorScope
10/29/2026CompleteCL ElectricalGeneral Wiring
▾Field Inspections (DOB CAP) — 1
DateTypeResultReport
05/19/2026Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 19
DateRequirementInspectorRole
09/22/2026Fire-Resistant Penetrations and JointsAaron McDonaldspecial
09/22/2026HVAC-R and service water piping design and insulationAaron McDonaldenergy_progress
09/22/2026HVAC-R and service water heating system controlsAaron McDonaldenergy_progress
09/22/2026HVAC-R and service water heating equipmentAaron McDonaldenergy_progress
09/22/2026Energy Code Compliance InspectionsAaron McDonaldprogress
05/16/2026Fire-Resistant Penetrations and JointsAaron McDonaldspecial
05/16/2026Energy Code Compliance InspectionsAaron McDonaldprogress
05/16/2026HVAC-R and service water piping design and insulationAaron McDonaldenergy_progress
05/16/2026HVAC-R and service water heating system controlsAaron McDonaldenergy_progress
05/16/2026HVAC-R and service water heating equipmentAaron McDonaldenergy_progress
02/16/2026Interior lighting powerAaron McDonaldenergy_progress
02/13/2026Fire-Resistance Rated ConstructionAaron McDonaldprogress
02/13/2026Energy Code Compliance InspectionsAaron McDonaldprogress
02/13/2026Fenestration and door U-factor and product ratingsAaron McDonaldenergy_progress
02/13/2026Fenestration areasAaron McDonaldenergy_progress
02/13/2026Fire-Resistant Penetrations and JointsAaron McDonaldspecial
02/13/2026Insulation placement and R valuesAaron McDonaldenergy_progress
02/13/2026Fenestration air leakageAaron McDonaldenergy_progress
02/10/2026FinalAaron McDonaldprogress
22 filed documents on file for this building. Sign in free to see the full history. Sign in · Create account