Two family brick
32 BUTLER STREET
BROOKLYN · BIN 3006498
💬 Discuss this project
1901Year Built
3Stories
B1Building Class
—Zoning
5,079 sfGross Floor Area
2Units
Rent Stabilized3 Open Violations ▸
Two family brick · Owner of record: 32 BUTLER LLC · 2,500 sf lot · 2.03 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanical
Roof5p · 2 filings · 20 docs
Floor 33p · 1 filing · 20 docs
Floor 26p · 2 filings · 20 docs
Floor 13p · 1 filing · 20 docs
Cellar7p · 2 filings · 20 docs
Basement4p · 2 filings · 20 docs
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
05/04/2023$3.9M—Private party → 32 BUTLER LLC$768/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
KEVIN GALLEN PE LLC107/21/2025
HPL ENGINEERING P.C.1306/18/2025
ASR ENGINEERING PC206/30/2024
JIAN ENGINEERING PLLC308/14/2023
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
SD DESIGN STUDIO3403/21/2026
ADVANCED BUILDERS SERVICES203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
MEGA GENERAL CONSTRUCTIONGeneral Contractor1307/08/2026
JRL SKYLINE INCGeneral Contractor1207/08/2026
CONSTRUCTION MNGT. AA,LLCGeneral Contractor407/08/2026
TOPLINE NYC INCGeneral Contractor407/08/2026
CL ELECTRICAL CORPElectrical203/22/2026
QMB PLUMBING & HEATING INCPlumbing207/08/2026
DPH PLUMBING & HTG CORPPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
HPL ENGINEERING PC56131507/21/2025
Building Lifecycle
All (133)Filed (18)Permit Issued (20)Signed Off (9)Violation (8)Inspection (9)Objection (39)Special Inspection (30)
05/04/2026
Violation issued (HPD, open)
A
07/28/2025
Signed off — Alteration CO
PROPOSED VERTICAL AND HORIZONTAL ENLARGEMENT OF AN EXISTING 3 STORY BUILDING. INTERIOR RENOVATION AS PER PLANS. OBTAIN NEW CERTIFICATE OF OCCUPANCY FOR 2 DWELLING UNITS.
B00891510-S2
07/24/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Fran Huang
07/24/2025
Special inspection requirement — Maintenance information
Fran Huang
07/24/2025
Special inspection requirement — HVAC-R and service water heating equipment
Fran Huang
07/24/2025
Special inspection requirement — Structural Stability – Alterations of existing buildings
Fran Huang
07/24/2025
Special inspection requirement — Mechanical Systems
Fran Huang
07/24/2025
Special inspection requirement — HVAC-R and service water heating system controls
Fran Huang
07/24/2025
Special inspection requirement — Final
Fran Huang
07/24/2025
Special inspection requirement — Energy Code Compliance Inspections
Fran Huang
07/24/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
Fran Huang
07/24/2025
Special inspection requirement — Shutoff dampers
Fran Huang
07/24/2025
Special inspection requirement — Duct leakage testing, insulation and design
Fran Huang
07/21/2025
Filed — Alteration CO
PROPOSED VERTICAL AND HORIZONTAL ENLARGEMENT OF AN EXISTING 3 STORY BUILDING. INTERIOR RENOVATION AS PER PLANS. OBTAIN NEW CERTIFICATE OF OCCUPANCY FOR 2 DWELLING UNITS.
B00891510-P8
06/30/2025
Signed off — Alteration
A PROPOSED FOUNDATION CONSTRUCTION FILING IN CONJUNCTION WITH GENERAL CONSTRUCTION JOB #: B00916959-I1 FOR A 3-STORY EXISTING BRICK BUILDING WITH BACK EXTENSION, THERE ARE PARTY WALLS INVOLVED WITH ADJACENT BUILDINGS.
B00916960-I1
06/30/2025
Signed off — Alteration
A PROPOSED STRUCTURAL FILING IN CONJUNCTION WITH GENERAL CONSTRUCTION JOB #: B008915101-I1 FOR A 3-STORY EXISTING BRICK BUILDING WITH BACK EXTENSION. THERE ARE PARTY WALLS INVOLVED WITH ADJACENT BUILDINGS.
B00916959-I1
06/30/2025
Signed off — Alteration
A PROPOSED SOE CONSTRUCTION FILING IN CONJUNCTION WITH GENERAL CONSTRUCTION JOB #: B00916959-I1 FOR A 3-STORY EXISTING BRICK BUILDING WITH BACK EXTENSION, THERE ARE PARTY WALLS INVOLVED WITH ADJACENT BUILDINGS.
B00916961-I1
06/30/2025
Special inspection requirement — Duct leakage testing, insulation and design
Fran Huang
06/30/2025
Special inspection requirement — HVAC-R and service water heating system controls
Fran Huang
06/30/2025
Special inspection requirement — Maintenance information
Fran Huang
06/30/2025
Special inspection requirement — Final
Fran Huang
06/30/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
Fran Huang
06/30/2025
Special inspection requirement — Mechanical Systems
Fran Huang
06/30/2025
Special inspection requirement — Structural Stability – Alterations of existing buildings
Fran Huang
06/30/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Fran Huang
06/30/2025
Special inspection requirement — Energy Code Compliance Inspections
Fran Huang
06/30/2025
Special inspection requirement — Shutoff dampers
Fran Huang
06/30/2025
Special inspection requirement — HVAC-R and service water heating equipment
Fran Huang
06/26/2025
Special inspection requirement — Structural Stability – Alterations of existing buildings
Fran Huang
06/26/2025
Special inspection requirement — Fenestration and door U-factor and product ratings
Fran Huang
06/26/2025
Special inspection requirement — Structural Stability – Alterations of existing buildings
Fran Huang
06/26/2025
Special inspection requirement — Air barrier - visual inspection
Fran Huang
06/26/2025
Special inspection requirement — Interior lighting power
Fran Huang
06/26/2025
Special inspection requirement — Fenestration air leakage
Fran Huang
06/26/2025
Special inspection requirement — Insulation placement and R values
Fran Huang
06/26/2025
Special inspection requirement — Fenestration areas
Fran Huang
06/18/2025
Filed — Alteration CO
PROPOSED VERTICAL AND HORIZONTAL ENLARGEMENT OF AN EXISTING 3 STORY BUILDING. INTERIOR RENOVATION AS PER PLANS. OBTAIN NEW CERTIFICATE OF OCCUPANCY FOR 2 DWELLING UNITS.
B00891510-P7
06/13/2025
Signed off — Alteration
INSTALLATION OF 300PSF SIDEWALK SHED AS PER PLANS. ALL EQUIPMENT SHALL COMPLY WITH CH #33 OF THE NYC CODE 2022. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
B01013271-I1
06/13/2025
Signed off — Alteration
INSTALLATION OF PIPE SCAFFOLDING AS PER PLANS. ALL EQUIPMENT SHALL COMPLY WITH CH #33 OF THE NYC CODE 2022. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
B01074294-I1
06/11/2025
Signed off — Alteration CO
PROPOSED VERTICAL AND HORIZONTAL ENLARGEMENT OF AN EXISTING 3 STORY BUILDING. INTERIOR RENOVATION AS PER PLANS. OBTAIN NEW CERTIFICATE OF OCCUPANCY FOR 2 DWELLING UNITS.
B00891510-S1
06/10/2025
Signed off — Alteration CO
PROPOSED VERTICAL AND HORIZONTAL ENLARGEMENT OF AN EXISTING 3 STORY BUILDING. INTERIOR RENOVATION AS PER PLANS. OBTAIN NEW CERTIFICATE OF OCCUPANCY FOR 2 DWELLING UNITS.
B00891510-S4
06/09/2025
Violation issued (HPD, open)
A
05/23/2025
Inspection — Certified Storm Drainage-ST-Fixtures-Finish
Certified
View inspection ↗
05/23/2025
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
05/22/2025
Signed off — Alteration CO
PROPOSED VERTICAL AND HORIZONTAL ENLARGEMENT OF AN EXISTING 3 STORY BUILDING. INTERIOR RENOVATION AS PER PLANS. OBTAIN NEW CERTIFICATE OF OCCUPANCY FOR 2 DWELLING UNITS.
B00891510-S3
05/21/2025
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
05/13/2025
Inspection — Certified Sprinkler-SP-Fixtures-Finish
Certified
View inspection ↗
05/13/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
05/13/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
05/12/2025
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
05/09/2025
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
05/05/2025
Objection resolved — Addressed
05/02/2025
Objection raised — Admin
04/30/2025
Filed — Alteration CO
PROPOSED VERTICAL AND HORIZONTAL ENLARGEMENT OF AN EXISTING 3 STORY BUILDING. INTERIOR RENOVATION AS PER PLANS. OBTAIN NEW CERTIFICATE OF OCCUPANCY FOR 2 DWELLING UNITS.
B00891510-P5
04/28/2025
Permit issued — Construction Fence
B00891510-S3-FN
04/25/2025
Permit issued — Mechanical Systems
B00891510-S2-MS
04/25/2025
Permit issued — General Construction
B00891510-I1-GC
04/24/2025
Objection resolved — Addressed
04/24/2025
Objection resolved — Addressed
04/24/2025
Objection resolved — Addressed
Latest 60 of 133 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWConstruction FenceSigned-offJRL SKYLINE04/28/2025
DOB NOWMechanical SystemsSigned-offJRL SKYLINE04/25/2025
DOB NOWGeneral ConstructionPermit IssuedJRL SKYLINE04/25/2025
DOB NOWSprinklersSigned-offQMB PLUMBING & HEATING INC04/09/2025
DOB NOWMechanical SystemsSigned-offMEGA GENERAL CONSTRUCTION02/28/2025
DOB NOWPlumbingSigned-offQMB PLUMBING & HEATING INC09/25/2024
DOB NOWStructuralSigned-offMEGA GENERAL CONSTRUCTION08/29/2024
DOB NOWFoundationSigned-offMEGA GENERAL CONSTRUCTION08/29/2024
DOB NOWGeneral ConstructionPermit IssuedMEGA GENERAL CONSTRUCTION07/12/2024
DOB NOWConstruction FenceSigned-offMEGA GENERAL CONSTRUCTION07/12/2024
DOB NOWGeneral ConstructionPermit IssuedCONSTRUCTION MNGT. AA,LLC07/11/2024
DOB NOWConstruction FenceSigned-offCONSTRUCTION MNGT. AA,LLC07/11/2024
DOB NOWSupported ScaffoldSigned-offTOPLINE NYC INC07/01/2024
DOB NOWPlumbingSigned-offDPH PLUMBING & HTG CORP05/02/2024
DOB NOWGeneral ConstructionPermit IssuedJRL SKYLINE04/18/2024
DOB NOWSidewalk ShedSigned-offTOPLINE NYC INC03/04/2024
DOB NOWConstruction FenceSigned-offJRL SKYLINE09/28/2023
DOB NOWSupport of ExcavationSigned-offJRL SKYLINE08/21/2023
DOB NOWStructuralSigned-offJRL SKYLINE08/16/2023
DOB NOWFoundationSigned-offJRL SKYLINE08/16/2023
1 project · most recent 07/21/2025
Heating and Air Conditioning Systems Heating Systems Ventilation Systems
FiledStatusContractorScopeMake / Model / Capacity
07/21/2025Signed-offJRL SKYLINE INCHeating and Air Conditioning Systems, Heating Systems, Ventilation Systems
Heat / Cool
Mitsubishi Electric MXZ-SM60NAM2 5 tons · Heat Pump Outdoor ×2
Heating
Envi SE5012D 1,707 BTU · Electric Heater ×5
Ventilation
Mitsubishi Electric TLGHF0300RV 210 CFM · Erv ×1
TLGHF0380RVX0 315 CFM · Erv ×1
1 project · most recent 07/21/2025
Sprinkler System
FiledStatusContractorScope
07/21/2025——Sprinkler System
1 project · most recent 07/21/2025
Gas Storm Water/Sanitary
FiledStatusContractorScope
07/21/2025Signed-offQMB PLUMBING & HEATING INGas, Storm, Water/Sanitary
3 projects · most recent 05/07/2025
General Wiring
FiledStatusContractorScope
05/07/2025CompleteCL ELECTRICAL CORPGeneral Wiring
08/18/2024CompleteCL ELECTRICAL CORP—
05/10/2024CompleteRICHARD NEU—
1 project · most recent 07/21/2025
Fence
FiledStatusContractorScope
07/21/2025Signed-offJRL SKYLINE INCFence
▾Field Inspections (DOB CAP) — 9
DateTypeResultReport
05/23/2025Certified Storm Drainage-ST-Fixtures-FinishCertifiedView ↗
05/23/2025Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
05/21/2025Pass-Final CND-Occupancy InspectionPassView ↗
05/13/2025Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
05/13/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
05/13/2025Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
05/12/2025Pass-Final PL - Up to 3 Requested FloorsPassView ↗
05/09/2025Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
10/08/2024Pass-Final PL - Up to 3 Requested FloorsPassView ↗
▾Special Inspection Requirements (DOB NOW) — 110
DateRequirementInspectorRole
07/24/2025Fire-Resistant Penetrations and JointsFran Huangspecial
07/24/2025Structural Stability – Alterations of existing buildingsFran Huangspecial
07/24/2025FinalFran Huangprogress
07/24/2025Energy Code Compliance InspectionsFran Huangprogress
07/24/2025HVAC-R and service water piping design and insulationFran Huangenergy_progress
07/24/2025Maintenance informationFran Huangenergy_progress
07/24/2025Duct leakage testing, insulation and designFran Huangenergy_progress
07/24/2025HVAC-R and service water heating system controlsFran Huangenergy_progress
07/24/2025Shutoff dampersFran Huangenergy_progress
07/24/2025HVAC-R and service water heating equipmentFran Huangenergy_progress
07/24/2025Mechanical SystemsFran Huangspecial
06/30/2025Energy Code Compliance InspectionsFran Huangprogress
06/30/2025Structural Stability – Alterations of existing buildingsFran Huangspecial
06/30/2025Mechanical SystemsFran Huangspecial
06/30/2025Fire-Resistant Penetrations and JointsFran Huangspecial
06/30/2025Duct leakage testing, insulation and designFran Huangenergy_progress
06/30/2025HVAC-R and service water heating system controlsFran Huangenergy_progress
06/30/2025Shutoff dampersFran Huangenergy_progress
06/30/2025HVAC-R and service water piping design and insulationFran Huangenergy_progress
06/30/2025Maintenance informationFran Huangenergy_progress
06/30/2025HVAC-R and service water heating equipmentFran Huangenergy_progress
06/30/2025FinalFran Huangprogress
06/26/2025Fenestration areasFran Huangenergy_progress
06/26/2025Energy Code Compliance InspectionsFran Huangprogress
06/26/2025Fire-Resistance Rated ConstructionFran Huangprogress
Latest 25 of 110.
▾Documents — 150 on file (BIS + DOB NOW)
▸Plans & Drawings19
▸DOB NOWPlans/Sketch19
08/27/2026B00892043-I1Request digital key ↗
08/27/2026B00916961-I1Request digital key ↗
08/27/2026B00916959-I1Request digital key ↗
Showing 3 of 19 on file for this type
▸Applications & Permits2
▸BISPLAN / WORK APPROVAL APPLICATION2
09/20/2024322114813Open ↗
09/13/2024322114813Open ↗
▸Zoning, Tax Lot & Property Records11
▸DOB NOWZD1: DOB Zoning Diagram5
08/24/2026B00891510-P7Open ↗
08/24/2026B00891510-P6Open ↗
08/15/2026B00891510-I1Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWZoning Exhibit form (1-5)5
08/24/2026B00891510-P7Open ↗
08/24/2026B00891510-P6Open ↗
08/15/2026B00891510-I1Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWHouse Number Verification: TOPO Stamp1
08/15/2026B00891510-I1Open ↗
▸Seals & Professional Certifications56
▸DOB NOWDPL-1: Design Professional Seal & Signature19
08/27/2026B00892043-I1Open ↗
08/27/2026B00916959-I1Open ↗
08/27/2026B00916960-I1Open ↗
Showing 3 of 19 on file for this type
▸DOB NOWProgress Inspector Seal & Signature19
09/23/2026B00891510-P7Open ↗
09/23/2026B00891510-P7Open ↗
08/31/2026B00891510-P5Open ↗
Showing 3 of 19 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature18
09/27/2026B00891510-S4Open ↗
09/23/2026B00891510-P7Open ↗
09/23/2026B00891510-P7Open ↗
Showing 3 of 18 on file for this type
▸Trade Schedules & Equipment5
▸DOB NOWDEP: Sewer Certification (Sanitary/Storm)5
08/24/2026B00891510-P7Open ↗
08/24/2026B00891510-P6Open ↗
08/15/2026B00891510-I1Open ↗
Showing 3 of 5 on file for this type
▸Safety & Tenant Protection5
▸DOB NOWStreet Tree Checklist5
08/24/2026B00891510-P6Open ↗
08/24/2026B00891510-P7Open ↗
08/15/2026B00891510-I1Open ↗
Showing 3 of 5 on file for this type
▸Environmental & Asbestos17
▸DOB NOWDEP ACP-5: Asbestos Assessment Report17
08/27/2026B00892043-I1Open ↗
08/27/2026B00916959-I1Open ↗
08/27/2026B00916960-I1Open ↗
Showing 3 of 17 on file for this type
▸Inspections & Test Reports10
▸DOB NOWSOIL REPORT6
08/24/2026B00891510-P6Open ↗
08/24/2026B00891510-P7Open ↗
08/15/2026B00891510-I1Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWGeotechnical Report (BC 1803.6)2
08/13/2026B00916960-I1Open ↗
08/13/2026B00916961-I1Open ↗
▸DOB NOWTR4 Test Report and Plot Diagram2
08/15/2026B00891510-I1Open ↗
08/13/2026B00916960-I1Open ↗
▸Filing & Intake Forms1
▸BISEFILING COVER SHEET1
09/13/2024322114813Open ↗
▸Other Documents24
▸DOB NOWPlot Diagram7
08/24/2026B00891510-P7Open ↗
08/24/2026B00891510-P6Open ↗
08/15/2026B00891510-I1Open ↗
Showing 3 of 7 on file for this type
▸DOB NOWSite Survey: Initial5
08/24/2026B00891510-P7Open ↗
08/24/2026B00891510-P6Open ↗
08/15/2026B00891510-I1Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone5
08/24/2026B00891510-P7Open ↗
08/24/2026B00891510-P6Open ↗
08/15/2026B00891510-I1Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWProperty Ownership Certification5
08/24/2026B00891510-P7Open ↗
08/24/2026B00891510-P6Open ↗
08/15/2026B00891510-I1Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWFinal Survey1
08/15/2026B00891510-I1Open ↗
▸DOB NOWAdjoining Owners Notification1
08/13/2026B00916961-I1Open ↗