← Back
Miscellaneous and old-style bank buildings
32-36 Cooper Square
32 COOPER SQUARE · BIN 1089867
💬 Discuss this project
1904Year Built
6Stories
O9Building Class
M1-6/R10Zoning
18,255 sfGross Floor Area
6Units
Rent Stabilized0 Open Violations
Miscellaneous and old-style bank buildings · Owner of record: UNAVAILABLE OWNER · 3,125 sf lot · 5.84 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanicalPlumbingFire ProtectionGeneralOther
Roof9p · 4 filings · 20 docs
Floor 211p · 1 filing · 9 docs
Floor 20
Floor 19
Floor 18
Floor 17
Floor 16
Floor 15
Floor 14
Floor 13
Floor 12
Floor 11
Floor 10
Floor 9
Floor 8
Floor 7
Floor 6
Floor 54p · 1 filing · 11 docs
Floor 4
Floor 32p · 1 filing · 6 docs
Floor 25p · 2 filings · 20 docs
Floor 12p · 1 filing · 18 docs
2 jobs · most recent 09/15/2025
Ventilation Systems Heating and Air Conditioning Systems
FiledStatusContractorScopeMake / Model / Capacity
09/15/2025——Heating and Air Conditioning Systems, Ventilation Systems
Heat / Cool
Daikin FXSQ48TBVJU 48,000 BTU · Vrf Indoor ×1
RXTQ48TAVJU 45,500 BTU · Vrf Outdoor ×1
Ventilation
Captiveaire CFA-110-CA 110 CFM · Exhaust Fan ×1
CFA-D50-CA 50 CFM · Exhaust Fan ×1
05/12/2025Signed-offCASELLA CONSTRUCTION CORPVentilation Systems
Ventilation
Panasonic FV-05VQ5 50 CFM · Exhaust Fan ×1
1 job · most recent 09/15/2025
FiledStatusContractorScope
09/15/2025——48 heads
2 jobs · most recent 09/15/2025
Water/Sanitary
FiledStatusContractorScope
09/15/2025——Water/Sanitary
05/12/2025Signed-offHYDROKINETIC PLBG & HTG IWater/Sanitary
4 jobs · most recent 08/05/2025
General Wiring
FiledStatusContractorScope
08/05/2025Permit IssuedQUEENSBORO ELEC'L CONTR'GGeneral Wiring
08/30/2023CompleteBOROWIDE ELECT'L CONTR'S—
10/19/2022CompleteJAM ELECTRICAL CORP—
10/12/2021CompleteALL-STAR ELEC'L SERVICESGeneral Wiring
Building Lifecycle
All (92)Filed (19)Permit Issued (18)Signed Off (10)Violation (4)Inspection (7)Objection (4)Special Inspection (30)
07/27/2026
Signed off — Alteration
APPLICATION FILED FOR INTERIOR REMOVAL OF NON-LOAD BEARING PARTITIONS, CEILINGS, AND FINISHES ON THE 5TH FLOOR AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
M01161891-I1
07/27/2026
Signed off — Alteration
APPLICATION FILED FOR INTERIOR REMOVAL OF NON-LOAD BEARING PARTITIONS, CEILINGS, AND FINISHES ON THE 3RD FLOOR AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
M01167587-I1
01/07/2026
Signed off — Alteration
M01143182-I1
10/22/2025
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
10/17/2025
Objection raised — Cost
10/16/2025
Objection raised — Scope
09/29/2025
Signed off — Alteration
M00997601-I1
09/26/2025
Objection raised — Scope
09/15/2025
Filed — Alteration
APPLICATION FILED FOR INTERIOR RENOVATION OF NON-LOAD BEARING PARTITIONS, CEILINGS, AND FINISHES ON THE 5TH FLOOR TO EXISTING JLWQ AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
M01258058-S2
09/15/2025
Filed — Alteration
APPLICATION FILED FOR INTERIOR RENOVATION OF NON-LOAD BEARING PARTITIONS, CEILINGS, AND FINISHES ON THE 5TH FLOOR TO EXISTING JLWQ AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
M01258058-S3
09/12/2025
Objection raised — Admin
09/10/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
09/10/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
09/04/2025
Filed — Alteration
APPLICATION FILED FOR INTERIOR RENOVATION OF NON-LOAD BEARING PARTITIONS, CEILINGS, AND FINISHES ON THE 5TH FLOOR TO EXISTING JLWQ AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
M01258058-I1
09/04/2025
Filed — Alteration
APPLICATION FILED FOR INTERIOR RENOVATION OF NON-LOAD BEARING PARTITIONS, CEILINGS, AND FINISHES ON THE 3RD FLOOR AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
M01253609-I1
09/04/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
09/04/2025
Special inspection requirement — Fire-Resistance Rated Construction
08/20/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
08/15/2025
Permit issued — Plumbing
M01194909-S2-PL
08/04/2025
Special inspection requirement — Sprinkler Systems
07/09/2025
Special inspection requirement — Final
VINCENT JR ANTONACCI
06/03/2025
Signed off — Alteration
PROPOSED INSTALLATION OF TEMPORARY PIPE SCAFFOLD AS PER PLANS. WORK SHALL COMPLY WITH CHAPTER #33 OF 2022 THE NYC BUILDING CODE. NO CHANGE IN USE, OCCUPANCY, OR EGRESS UNDER THIS APPLICATION.
M00927587-I1
06/03/2025
Signed off — Alteration
INSTALLATION OF TEMPORARY HEAVY DUTY SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF 2022 THE NYC BUILDING CODE. LIVE LOAD 300PSF.
M00927585-I1
05/13/2025
Permit issued — Mechanical Systems
M01194909-S1-MS
05/12/2025
Filed — Alteration
APPLICATION FILED FOR INTERIOR RENOVATION OF NON-LOAD BEARING PARTITIONS, CEILINGS, AND FINISHES ON THE 1ST FLOOR AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
M01194909-S1
05/12/2025
Filed — Alteration
APPLICATION FILED FOR INTERIOR RENOVATION OF NON-LOAD BEARING PARTITIONS, CEILINGS, AND FINISHES ON THE 1ST FLOOR AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
M01194909-S2
05/01/2025
Permit issued — General Construction
M01194909-I1-GC
04/17/2025
Filed — Alteration
APPLICATION FILED FOR INTERIOR RENOVATION OF NON-LOAD BEARING PARTITIONS, CEILINGS, AND FINISHES ON THE 1ST FLOOR AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
M01194909-I1
04/14/2025
Special inspection requirement — Final
Ari Kamo
04/14/2025
Special inspection requirement — Mechanical Systems
Ari Kamo
04/14/2025
Special inspection requirement — Tenant Protection Plan Compliance
Ari Kamo
04/14/2025
Special inspection requirement — Tenant Protection Plan Compliance
Ari Kamo
04/04/2025
Special inspection requirement — Wood – High-Load Diaphragms
Chris Yiu
04/04/2025
Special inspection requirement — Construction Utilizing CLT or SCL, Type IV
Chris Yiu
04/04/2025
Special inspection requirement — Wood – Seismic Resistance
Chris Yiu
04/04/2025
Special inspection requirement — Post-installed Anchors
Francesco Bruni
04/04/2025
Special inspection requirement — Tenant Protection Plan Compliance
ARIEL GOLSHAN
04/04/2025
Special inspection requirement — Masonry
Francesco Bruni
04/04/2025
Special inspection requirement — Structural Stability – Alterations of existing buildings
Chris Yiu
04/04/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Francesco Bruni
04/04/2025
Special inspection requirement — Energy Code Compliance Inspections
Francesco Bruni
04/04/2025
Special inspection requirement — Final
Francesco Bruni
04/03/2025
Filed — Alteration
M01143182-P1
03/13/2025
Special inspection requirement — Tenant Protection Plan Compliance
Ari Kamo
03/13/2025
Special inspection requirement — Final
VINCENT JR ANTONACCI
02/25/2025
Special inspection requirement — Final
Francesco Bruni
02/25/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Francesco Bruni
02/25/2025
Special inspection requirement — Masonry
Francesco Bruni
02/25/2025
Special inspection requirement — Post-installed Anchors
Francesco Bruni
02/25/2025
Special inspection requirement — Structural Stability – Alterations of existing buildings
Chris Yiu
02/25/2025
Special inspection requirement — Wood – High-Load Diaphragms
Chris Yiu
02/25/2025
Special inspection requirement — Wood – Seismic Resistance
Chris Yiu
02/25/2025
Special inspection requirement — Tenant Protection Plan Compliance
ARIEL GOLSHAN
02/21/2025
Signed off — Alteration
Roof System Replacement as shown in filed drawings. No change in use, egress or occupancy.
M00959921-I1
02/14/2025
Permit issued — Structural
M01143182-I1-GC-CX
02/10/2025
Filed — Alteration
M01143182-I1
02/03/2025
Permit issued — Structural
M00997601-I1-ST
01/30/2025
Permit issued — General Construction
M00959921-I1-GC
01/28/2025
Permit issued — General Construction
M01167587-I1-GC
01/28/2025
Permit issued — General Construction
M01161891-I1-GC
Latest 60 of 92 events.
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
HARTZ MOUNTAIN INDUSTRIES4707/08/2026
HARTZ INDUSTRIES1203/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
RLM ENGINEERING PLLC409/15/2025
HARTZ MOUNTAIN609/04/2025
THE VSA GROUP404/03/2025
ENTHINK ENGINEERS LLC208/31/2023
PATHIK SHAH, P.E. LEED AP BD+C204/09/2022
JAYPCONSULTING ENGINEERING INC.109/22/2021
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
EA DESIGN GROUP2603/21/2026
VSA303/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
ANDAMIO SCAFFOLDING LLCGeneral Contractor807/08/2026
CASELLA CONSTRUCTION CORP.General Contractor607/08/2026
LHOTSE CORPGeneral Contractor507/08/2026
REEM PLBG & HTG CORPFire Protection107/08/2026
HYDROKINETIC PLBG & HTG IPlumbing107/08/2026
REEM PLBG & HTG CORPPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
AK ENGINEERING PC678905/12/2025
AG ENGINEERING PLLC8899204/03/2025
STRUCT. ENGINEERING INTEG4174204/03/2025
THE VSA GROUP1767404/03/2025
QUALITY TESTING, LLC7344202/27/2024
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingSigned-offHYDROKINETIC PLBG & HTG I08/15/2025
DOB NOWMechanical SystemsSigned-offCASELLA CONSTRUCTION CORP.05/13/2025
DOB NOWGeneral ConstructionSigned-offCASELLA CONSTRUCTION CORP.05/01/2025
DOB NOWStructuralSigned-offLHOTSE CORP02/14/2025
DOB NOWStructuralSigned-offLHOTSE CORP02/03/2025
DOB NOWGeneral ConstructionSigned-offLHOTSE CORP01/30/2025
DOB NOWGeneral ConstructionSigned-offCASELLA CONSTRUCTION CORP.01/28/2025
DOB NOWGeneral ConstructionSigned-offCASELLA CONSTRUCTION CORP.01/28/2025
DOB NOWSupported ScaffoldSigned-offANDAMIO SCAFFOLDING LLC08/29/2024
DOB NOWSidewalk ShedSigned-offANDAMIO SCAFFOLDING LLC08/29/2024
DOB NOWStructuralSigned-offLHOTSE CORP03/04/2024
DOB NOWGeneral ConstructionSigned-offLHOTSE CORP02/28/2024
DOB NOWSupported ScaffoldSigned-offANDAMIO SCAFFOLDING LLC09/01/2023
DOB NOWSidewalk ShedSigned-offANDAMIO SCAFFOLDING LLC09/01/2023
DOB NOWSprinklersSigned-offREEM PLBG & HTG CORP09/30/2021
DOB NOWPlumbingSigned-offREEM PLBG & HTG CORP09/29/2021
DOB NOWGeneral ConstructionSigned-offCASELLA CONSTRUCTION CORP.09/27/2021
DOB NOWMechanical SystemsSigned-offCASELLA CONSTRUCTION CORP.09/27/2021
BISPLISSUEDREEM PLBG & HTG CORP02/27/2019
BISMHISSUEDCASELLA CONSTRUCTION CORP.02/01/2019
BISOTISSUEDCASELLA CONSTRUCTION CORP.01/31/2019
BISSPISSUEDREEM PLBG & HTG CORP09/11/2017
BISPLISSUEDREEM PLBG & HTG CORP09/11/2017
BISOTISSUEDHARTZ MOUNTAIN INDUSTRIES08/25/2017
BISMHISSUEDHARTZ MOUNTAIN INDUSTRIES08/25/2017
BIS—ISSUEDHARTZ MOUNTAIN INDUSTRIES08/25/2017
BISOTISSUEDHARTZ MOUNTAIN INDUSTRIES11/02/2016
BISMHISSUEDHARTZ MOUNTAIN INDUSTRIES11/02/2016
BISOTISSUEDCASELLA CONSTRUCTION CORP.11/17/1997
BISOTISSUEDCASELLA CONSTRUCTION CORP.07/03/1997
BIS—ISSUEDHARTZ MOUNTAIN INDUSTRIES06/08/1995
▾Field Inspections (DOB CAP) — 7
DateTypeResultReport
10/22/2025Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
08/20/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
03/03/2022Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
12/21/2021Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
12/20/2021Pass-Final PL - Up to 3 Requested FloorsPassView ↗
11/01/2021Pass-Final PL - Up to 3 Requested FloorsPassView ↗
10/21/2021Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 40
DateRequirementInspectorRole
09/10/2025Fire-Resistant Penetrations and Joints—special
09/10/2025Fire-Resistant Penetrations and Joints—special
09/04/2025Fire-Resistant Penetrations and Joints—special
09/04/2025Fire-Resistance Rated Construction—progress
08/04/2025Sprinkler Systems—special
07/09/2025FinalVINCENT JR ANTONACCIprogress
04/14/2025FinalAri Kamoprogress
04/14/2025Mechanical SystemsAri Kamospecial
04/14/2025Tenant Protection Plan ComplianceAri Kamospecial
04/14/2025Tenant Protection Plan ComplianceAri Kamospecial
04/04/2025Wood – High-Load DiaphragmsChris Yiuspecial
04/04/2025Construction Utilizing CLT or SCL, Type IVChris Yiuspecial
04/04/2025Wood – Seismic ResistanceChris Yiuspecial
04/04/2025Post-installed AnchorsFrancesco Brunispecial
04/04/2025Tenant Protection Plan ComplianceARIEL GOLSHANspecial
04/04/2025MasonryFrancesco Brunispecial
04/04/2025Structural Stability – Alterations of existing buildingsChris Yiuspecial
04/04/2025Fire-Resistant Penetrations and JointsFrancesco Brunispecial
04/04/2025Energy Code Compliance InspectionsFrancesco Bruniprogress
04/04/2025FinalFrancesco Bruniprogress
03/13/2025Tenant Protection Plan ComplianceAri Kamospecial
03/13/2025FinalVINCENT JR ANTONACCIprogress
02/25/2025FinalFrancesco Bruniprogress
02/25/2025Fire-Resistant Penetrations and JointsFrancesco Brunispecial
02/25/2025MasonryFrancesco Brunispecial
Latest 25 of 40.
▾Documents — 293 on file (BIS + DOB NOW)
▸Plans & Drawings20
▸DOB NOWPlans/Sketch20
09/03/2026M00596506-I1Request digital key ↗
09/03/2026M00596503-I1Request digital key ↗
09/02/2026M00596509-I1Request digital key ↗
Showing 3 of 20 on file for this type
▸Applications & Permits55
▸BISPLAN / WORK APPROVAL APPLICATION30
10/09/2025122927690Open ↗
07/11/2024122927690Open ↗
06/29/2023101708555Open ↗
Showing 3 of 30 on file for this type
▸DOB NOWLPC Approval/Permit13
09/03/2026M00596506-I1Open ↗
08/24/2026M01143182-I1Open ↗
08/13/2026M01194909-S1Open ↗
Showing 3 of 13 on file for this type
▸BISWORK PERMIT APPLICATION9
02/27/2019123656230Open ↗
02/04/2019123656230Open ↗
01/31/2019123656230Open ↗
Showing 3 of 9 on file for this type
▸BISPLAN - WORK & PERMITS - SUPPPORTING DOCUMENTATION2
08/07/2020122927690Open ↗
07/02/2020123656230Open ↗
▸BISCERTIFICATE OF OCCUPANCY: APPLICATION1
04/03/2018122927690Open ↗
▸Seals & Professional Certifications85
▸DOB NOWSpecial Inspector Seal & Signature23
08/30/2026M01167587-I1Open ↗
08/26/2026M01194909-I1Open ↗
08/26/2026M01143182-I1Open ↗
Showing 3 of 23 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION21
01/25/2019123656230Open ↗
01/22/2019123656230Open ↗
01/22/2019123656230Open ↗
Showing 3 of 21 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature19
09/03/2026M00596506-I1Open ↗
09/02/2026M00596509-P1Open ↗
09/02/2026M00596509-I1Open ↗
Showing 3 of 19 on file for this type
▸DOB NOWProgress Inspector Seal & Signature10
08/30/2026M01167587-I1Open ↗
08/26/2026M01194909-I1Open ↗
08/26/2026M01143182-I1Open ↗
Showing 3 of 10 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST6
01/22/2019123656230Open ↗
06/07/2018122875344Open ↗
06/04/2018122875344Open ↗
Showing 3 of 6 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT6
01/22/2019123656230Open ↗
01/22/2019123656230Open ↗
01/22/2019123656230Open ↗
Showing 3 of 6 on file for this type
▸Trade Schedules & Equipment9
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE7
01/22/2019123656230Open ↗
06/05/2017122875344Open ↗
06/05/2017122875344Open ↗
Showing 3 of 7 on file for this type
▸BISEQUIPMENT USE PERMITS1
06/13/2018122875344Open ↗
▸BISEQUIPMENT USE APPLICATION/PERMIT1
06/13/2018122875344Open ↗
▸Safety & Tenant Protection6
▸BISTenant Protection Plan and Notes3
01/22/2019123656230Open ↗
01/23/2017122927690Open ↗
10/24/2016122875344Open ↗
▸BISSTREET TREE CHECKLIST2
01/23/2017122927690Open ↗
03/27/2012121008836Open ↗
▸BISSTREET TREE SIGNOFF1
03/05/2023122927690Open ↗
▸Environmental & Asbestos22
▸DOB NOWDEP ACP-5: Asbestos Assessment Report15
09/03/2026M00596506-I1Open ↗
09/02/2026M00596509-P1Open ↗
09/02/2026M00596509-I1Open ↗
Showing 3 of 15 on file for this type
▸BISASBESTOS: CERTIFICATION (DEP ACP5)3
10/09/2025122927690Open ↗
01/22/2019123656230Open ↗
01/23/2017122927690Open ↗
▸BISTHIS IS NOT AN ASBESTOS PROJECT2
03/27/2012121008836Open ↗
03/27/2012121008836Open ↗
▸DOB NOWDEP ACP-20/ACP-21: Asbestos Project Conditional Completion Form/Asbestos Project Completion Form2
08/27/2026M00997601-I1Open ↗
08/13/2026M01143182-I1Open ↗
▸Energy Compliance2
▸BISTECHNICAL REPORT: ENERGY1
03/27/2012121008836Open ↗
▸BISENERGY CODE 1ST REVIEW COMPLETE1
01/23/2017122927690Open ↗
▸Inspections & Test Reports3
▸BISTECHNICAL REPORT: RESPONSIBILITY3
07/02/2020123656230Open ↗
07/02/2020123656230Open ↗
07/02/2020123656230Open ↗
▸Approvals, Objections & Sign-offs30
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST17
02/02/2021122927690Open ↗
11/11/2020122927690Open ↗
08/20/2020122927690Open ↗
Showing 3 of 17 on file for this type
▸BISSCHEDULE A - OCCUPANCY / USE8
10/09/2025122927690Open ↗
06/05/2019122927690Open ↗
08/06/2018122927690Open ↗
Showing 3 of 8 on file for this type
▸BISLANDMARKS APPROVAL3
01/22/2019123656230Open ↗
08/22/2017122927690Open ↗
10/24/2016122875344Open ↗
▸BISLANDMARKS SIGNOFF1
03/09/2023122927690Open ↗
▸BISADMINISTRATIVE OBJECTIONS1
03/27/2012121008836Open ↗
▸Cost, Insurance & Ownership11
▸BISCOST AFFIDAVIT10
07/02/2020123656230Open ↗
07/02/2020123656230Open ↗
07/02/2020123656230Open ↗
Showing 3 of 10 on file for this type
▸BISCOST AFFIDAVIT (FINAL): PW31
03/09/2023122927690Open ↗
▸Filing & Intake Forms42
▸BISBOROUGH INTAKE FORM22
12/04/2019122927690Open ↗
09/12/2019122927690Open ↗
06/05/2019122927690Open ↗
Showing 3 of 22 on file for this type
▸BISADDITIONAL INFORMATION11
09/14/2024122927690Open ↗
06/14/2023122927690Open ↗
09/06/2019122927690Open ↗
Showing 3 of 11 on file for this type
▸BISEFILING COVER SHEET9
01/22/2019123656230Open ↗
01/22/2019123656230Open ↗
01/22/2019123656230Open ↗
Showing 3 of 9 on file for this type
▸Other Documents8
▸DOB NOWProof of Historic Building5
08/13/2026M01194909-I1Open ↗
08/13/2026M01161891-I1Open ↗
08/13/2026M01258058-I1Open ↗
Showing 3 of 5 on file for this type
▸BISPLOT DIAGRAM2
01/23/2017122927690Open ↗
03/27/2012121008836Open ↗
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION1
10/06/2025122927690Open ↗