32 ORANGE STREET
BROOKLYN · BIN 3001673
💬 Discuss this project
1899Year Built
3Stories
B9Building Class
R6Zoning
3,680 sfGross Floor Area
2Units
Rent Stabilized5 Open Violations 4 unresolved · 1 paperwork only ▸
Miscellaneous two family · 1,379 sf lot · 2.67 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanicalPlumbingFire ProtectionOther
Permit Issued — active, not yet Signed-off
RoofUnder Construction63p · 4 filings · 20 docs
Floor 3Under Construction81p · 5 filings · 20 docs
Floor 2Under Construction87p · 5 filings · 20 docs
Floor 1Under Construction79p · 5 filings · 20 docs
CellarUnder Construction86p · 5 filings · 20 docs
BasementUnder Construction13p · 1 filing · 20 docs
Sub-BasementUnder Construction66p · 4 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
CARICIC CONTRACTING203/22/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
11/28/2023$4.8M—Private party → Private party$1,318/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
D'ANTONIO CONSULTING ENGINEERS804/03/2026
NY BUILDING ASSOCIATES INC106/26/2025
MARTOS ENGINEERING202/04/2025
THE BROOKLYN STUDIO212/17/2024
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
J CALLAHAN CONSULTING1403/21/2026
J. CALLAHAN CONSULTING, INC.803/21/2026
BROOKLYN SOLARWORKS103/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
CARICIC CONTRACTING INCGeneral Contractor709/29/2026
CROSSFIELD PLBG.&HTG.CORPFire Protection207/08/2026
BROOKLYN SOLARWORKS LLCGeneral Contractor203/21/2026
AP PLUMBING & HVAC LLCPlumbing207/02/2026
AERO ELECTRIC CORPElectrical103/22/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
D'ANTONIO CONSULTING ENGI931804/03/2026
NKM ENGINEERING PLLC6244106/26/2025
CHRISTIAN L. MARTOS ENGIN5965202/04/2025
THE BROOKLYN STUDIO OF AR2684212/17/2024
Building Lifecycle
All (101)Filed (13)Permit Issued (11)Signed Off (1)Violation (17)Inspection (7)Objection (22)Special Inspection (30)
09/28/2026
Permit issued — General Construction
B01072757-I1-GC
06/23/2026
Permit issued — Mechanical Systems
B01071354-I1-MS
05/11/2026
Permit issued — Sprinklers
B01077930-I1-EW-SP
05/08/2026
Permit issued — Plumbing
B01071296-I1-PL
05/05/2026
Signed off — Alteration
INSTALL SOLAR PV ON EXISTING ROOFTOP. NO CHANGE IN USE, OCCUPANCY, OR EGRESS.
B01242068-I1
05/05/2026
Violation issued (HPD, open)
A
04/16/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
GAETANO D'ANTONIO
04/10/2026
Objection resolved — Addressed
04/09/2026
Objection raised — Other
04/03/2026
Filed — Alteration
Plumbing modification to include cap and remove, relocation and addition of new plumbing fixtures and related piping associated with the renovation of building as per plans filed herewith. No change to occupancy, use or egress under this application.
B01071296-P3
04/02/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
GAETANO D'ANTONIO
01/12/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
GAETANO D'ANTONIO
01/12/2026
Special inspection requirement — Sprinkler Systems
GAETANO D'ANTONIO
12/26/2025
Objection resolved — Addressed
12/26/2025
Objection resolved — Addressed
12/24/2025
Objection raised — Cost
12/24/2025
Objection raised — Inspections
12/18/2025
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
12/09/2025
Filed — Alteration
Sprinkler work associated renovation and conversion of building to one (1) family dwelling as per plans filed herewith.
B01077930-P1
12/08/2025
Special inspection requirement — Sprinkler Systems
GAETANO D'ANTONIO
12/08/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
GAETANO D'ANTONIO
11/18/2025
Violation issued (HPD, open)
I
11/03/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
10/21/2025
Filed — Alteration
Plumbing modification to include cap and remove, relocation and addition of new plumbing fixtures and related piping associated with the renovation of building as per plans filed herewith. No change to occupancy, use or egress under this application.
B01071296-P2
10/17/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
GAETANO D'ANTONIO
10/07/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
09/19/2025
Permit issued — General Construction
B01072757-I1-GC
08/04/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
06/27/2025
Permit issued — Solar
B01242068-I1-SL
06/26/2025
Filed — Alteration
INSTALL SOLAR PV ON EXISTING ROOFTOP. NO CHANGE IN USE, OCCUPANCY, OR EGRESS.
B01242068-I1
06/16/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
NARESH MAHANGU
06/16/2025
Special inspection requirement — Structural Stability – Alterations of existing buildings
NARESH MAHANGU
06/16/2025
Special inspection requirement — Energy Code Compliance Inspections
NARESH MAHANGU
06/16/2025
Special inspection requirement — Final
NARESH MAHANGU
06/16/2025
Special inspection requirement — Air barrier - visual inspection
NARESH MAHANGU
06/11/2025
Permit issued — Structural
B01071160-I1-ST
06/11/2025
Permit issued — Mechanical Systems
B01071354-I1-MS
06/10/2025
Violation issued (HPD, open)
A
06/06/2025
Violation issued (ECB, open)
Construction
06/06/2025
Violation issued (ECB, closed)
Construction
03/20/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
02/19/2025
Permit issued — Sprinklers
B01077930-I1-EW-SP
02/19/2025
Permit issued — Plumbing
B01071296-I1-PL
02/14/2025
Filed — Alteration
Plumbing modification to include cap and remove, relocation and addition of new plumbing fixtures and related piping associated with the renovation of building as per plans filed herewith. No change to occupancy, use or egress under this application.
B01071296-P1
02/13/2025
Filed — Alteration
Mechanical work including duct work and piping associated with the renovation of building as per plans filed herewith. No change in occupancy, use or egress proposed under this application.
B01071354-P1
02/10/2025
Special inspection requirement — Structural Stability – Alterations of existing buildings
Christian Martos
02/10/2025
Special inspection requirement — Structural Steel - Details
Christian Martos
02/10/2025
Special inspection requirement — Concrete - Cast-In-Place
Christian Martos
02/10/2025
Special inspection requirement — Structural Steel - Welding
Christian Martos
02/10/2025
Special inspection requirement — Subgrade Inspections
Christian Martos
02/10/2025
Special inspection requirement — Masonry
Christian Martos
02/10/2025
Special inspection requirement — Structural Cold-Formed Steel
Christian Martos
02/10/2025
Special inspection requirement — Structural Steel - High Strength Bolting
Christian Martos
02/10/2025
Special inspection requirement — Construction Utilizing CLT or SCL, Type IV
Christian Martos
02/10/2025
Special inspection requirement — Structural Wood Frame
Christian Martos
02/10/2025
Special inspection requirement — Final
Christian Martos
02/10/2025
Special inspection requirement — Wood – Seismic Resistance
Christian Martos
02/05/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Brendan Coburn
02/05/2025
Special inspection requirement — Fire-Resistance Rated Construction
Brendan Coburn
02/04/2025
Filed — Alteration
Structural work to include framing, footing, structural reinforcement, excavation, benching and foundation associated with renovation of building as per plans filed. No change to occupancy, use or egress. LPC amendment approval under LPC-25-02695.
B01071160-P1
Latest 60 of 101 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionPermit IssuedCARICIC CONTRACTING INC09/28/2026
DOB NOWMechanical SystemsPermit IssuedCARICIC CONTRACTING INC06/23/2026
DOB NOWSprinklersPermit IssuedCROSSFIELD PLBG.&HTG.CORP05/11/2026
DOB NOWPlumbingPermit IssuedAP PLUMBING & HVAC LLC05/08/2026
DOB NOWGeneral ConstructionPermit IssuedCARICIC CONTRACTING09/19/2025
DOB NOWSolarSigned-offBROOKLYN SOLARWORKS LLC06/27/2025
DOB NOWStructuralPermit IssuedCARICIC CONTRACTING06/11/2025
DOB NOWMechanical SystemsPermit IssuedCARICIC CONTRACTING06/11/2025
DOB NOWSprinklersPermit IssuedCROSSFIELD PLBG.&HTG.CORP02/19/2025
DOB NOWPlumbingPermit IssuedCROSSFIELD PLBG.&HTG02/19/2025
DOB NOWGeneral ConstructionPermit IssuedCARICIC CONTRACTING12/19/2024
1 project · most recent 02/13/2025
Heating and Air Conditioning Systems
FiledStatusContractorScopeMake / Model / Capacity
02/13/2025Permit IssuedCARICIC CONTRACTING INCHeating and Air Conditioning Systems
Heat / Cool
Mitsubishi Electric MXZ-SM60NAM2-U1 126,000 BTU · Heat Pump Outdoor ×4
1 project · most recent 12/09/2025
FiledStatusContractorScope
12/09/2025Permit IssuedCROSSFIELD PLBG.&HTG.CORP82 heads
2 projects · most recent 04/03/2026
Gas Storm Water/Sanitary
FiledStatusContractorScope
04/03/2026Permit IssuedCROSSFIELD PLBG.&HTGGas, Storm, Water/Sanitary
12/09/2025———
2 projects · most recent 06/18/2026
General Wiring
FiledStatusContractorScope
06/18/2026Permit IssuedAERO ELECTRIC CORPGeneral Wiring
06/18/2025CompleteBROOKYLN SOLARWORKS, LLC—
1 project · most recent 02/04/2025
Steel Concrete Wood
FiledStatusContractorScope
02/04/2025Permit IssuedCARICIC CONTRACTING INCSteel, Concrete, Wood
1 project · most recent 06/26/2025
FiledStatusContractorScope
06/26/2025Signed-offBROOKLYN SOLARWORKS LLC11 panels, 4.73 kw, 1,018 roof_area_sqft
▾Field Inspections (DOB CAP) — 7
DateTypeResultReport
12/18/2025Pass-Final CND-Occupancy InspectionPassView ↗
11/03/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
10/07/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
08/04/2025Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
03/20/2025Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
08/19/2024Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
08/19/2024Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 32
DateRequirementInspectorRole
04/16/2026Fire-Resistant Penetrations and JointsGAETANO D'ANTONIOspecial
04/02/2026Fire-Resistant Penetrations and JointsGAETANO D'ANTONIOspecial
01/12/2026Fire-Resistant Penetrations and JointsGAETANO D'ANTONIOspecial
01/12/2026Sprinkler SystemsGAETANO D'ANTONIOspecial
12/08/2025Sprinkler SystemsGAETANO D'ANTONIOspecial
12/08/2025Fire-Resistant Penetrations and JointsGAETANO D'ANTONIOspecial
10/17/2025Fire-Resistant Penetrations and JointsGAETANO D'ANTONIOspecial
06/16/2025Fire-Resistant Penetrations and JointsNARESH MAHANGUspecial
06/16/2025Structural Stability – Alterations of existing buildingsNARESH MAHANGUspecial
06/16/2025Energy Code Compliance InspectionsNARESH MAHANGUprogress
06/16/2025FinalNARESH MAHANGUprogress
06/16/2025Air barrier - visual inspectionNARESH MAHANGUenergy_progress
02/10/2025Structural Stability – Alterations of existing buildingsChristian Martosspecial
02/10/2025Structural Steel - DetailsChristian Martosspecial
02/10/2025Concrete - Cast-In-PlaceChristian Martosspecial
02/10/2025Structural Steel - WeldingChristian Martosspecial
02/10/2025Subgrade InspectionsChristian Martosspecial
02/10/2025MasonryChristian Martosspecial
02/10/2025Structural Cold-Formed SteelChristian Martosspecial
02/10/2025Structural Steel - High Strength BoltingChristian Martosspecial
02/10/2025Construction Utilizing CLT or SCL, Type IVChristian Martosspecial
02/10/2025Structural Wood FrameChristian Martosprogress
02/10/2025FinalChristian Martosprogress
02/10/2025Wood – Seismic ResistanceChristian Martosspecial
02/05/2025Fire-Resistant Penetrations and JointsBrendan Coburnspecial
Latest 25 of 32.
▾Documents — 79 on file (BIS + DOB NOW)
▸Plans & Drawings13
▸DOB NOWPlans/Sketch13
08/23/2026B01072757-I1Request digital key ↗
08/23/2026B01072757-P1Request digital key ↗
08/23/2026B01071160-P1Request digital key ↗
Showing 3 of 13 on file for this type
▸Applications & Permits11
▸DOB NOWLPC Approval/Permit11
08/23/2026B01072757-I1Open ↗
08/23/2026B01071160-I1Open ↗
08/17/2026B01071296-I1Open ↗
Showing 3 of 11 on file for this type
▸Zoning, Tax Lot & Property Records2
▸DOB NOWHouse Number Verification: TOPO Stamp2
08/23/2026B01072757-I1Open ↗
08/13/2026B01072757-P1Open ↗
▸Seals & Professional Certifications32
▸DOB NOWSpecial Inspector Seal & Signature13
09/05/2026B01071296-I1Open ↗
09/01/2026B01072757-I1Open ↗
08/26/2026B01071296-P3Open ↗
Showing 3 of 13 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature13
08/23/2026B01072757-I1Open ↗
08/23/2026B01071160-I1Open ↗
08/22/2026B01071354-P1Open ↗
Showing 3 of 13 on file for this type
▸DOB NOWProgress Inspector Seal & Signature6
09/01/2026B01072757-I1Open ↗
08/24/2026B01071160-I1Open ↗
08/24/2026B01242068-I1Open ↗
Showing 3 of 6 on file for this type
▸Safety & Tenant Protection4
▸DOB NOWStreet Tree Checklist2
08/23/2026B01072757-I1Open ↗
08/13/2026B01072757-P1Open ↗
▸DOB NOWStreet Trees Site Plan1
08/13/2026B01072757-I1Open ↗
▸DOB NOWStreet Tree Sign Off1
08/13/2026B01072757-I1Open ↗
▸Environmental & Asbestos6
▸DOB NOWDEP ACP-20/ACP-21: Asbestos Project Conditional Completion Form/Asbestos Project Completion Form5
08/22/2026B01071354-I1Open ↗
08/19/2026B01077930-I1Open ↗
08/17/2026B01071296-I1Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWDEP ACP-5: Asbestos Assessment Report1
08/13/2026B01242068-I1Open ↗
▸Approvals, Objections & Sign-offs1
▸DOB NOWUtility Company Final Acceptance Letter1
08/21/2026B01242068-I1Open ↗
▸Other Documents10
▸DOB NOWProof of Historic Building8
08/23/2026B01072757-I1Open ↗
08/17/2026B01071296-I1Open ↗
08/15/2026B01071296-P3Open ↗
Showing 3 of 8 on file for this type
▸DOB NOWProperty Ownership Certification2
08/23/2026B01072757-I1Open ↗
08/13/2026B01072757-P1Open ↗