← Back
Over six families without stores
32 PIERREPONT STREET
BROOKLYN · BIN 3001955
💬 Discuss this project
1899Year Built
3Stories
C1Building Class
R6Zoning
6,310 sfGross Floor Area
9Units
Rent Stabilized0 Open Violations
Over six families without stores · Owner of record: HB NYRF 1 PROPERTY OWNER 2, LLC · 2,000 sf lot · 3.16 FAR built · Flood zone X
Locations of Work
ArchitectureMechanicalPlumbing
Roof18p · 2 filings · 20 docs
Floor 340p · 4 filings · 20 docs
Floor 235p · 5 filings · 20 docs
Floor 134p · 4 filings · 20 docs
Cellar2p · 1 filing · 19 docs
Sub-Basement31p · 3 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
GREENBROOK PARTNERS1807/08/2026
HB NYRF 1 PROPERTY OWNER 2, LLC103/22/2026
EMCON GROUP203/22/2026
32 PIERREPONT ST LLC203/22/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
08/27/2025$5.4M—32 PIERREPONT ST, LLC → HB NYRF 1 PROPERTY OWNER 2, LLC$856/sf building
03/16/2022$4.2M—321 PIERREPONT LLC → 32 PIERREPONT ST LLC$666/sf building
08/23/2018$2.9M—Private party → 321 PIERREPONT LLC$464/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
AUVER ARCHITECTURE D.P.C.412/04/2025
AN SHEN MA ARCHITECT510/09/2025
RAAD102/07/2024
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
AN SHEN MA ARCHITECT303/21/2026
CASA GROUP403/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
METACOMET CONSTRUCTIONGeneral Contractor504/09/2026
JOSEPH NORIEGA, JRElectrical103/21/2026
AMM GEN'L CONTRACTING INCPlumbing107/08/2026
ETHOS PLUMBING CORPPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
AN SHEN MA ARCHITECT2968812/04/2025
PSI AGENCY INC.254309/09/2025
RAAD7727102/07/2024
Building Lifecycle
All (155)Filed (10)Permit Issued (7)Violation (60)Inspection (6)Objection (42)Special Inspection (30)
08/03/2026
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
08/03/2026
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
03/04/2026
Special inspection requirement — Maintenance information
AN MA
03/04/2026
Special inspection requirement — Shutoff dampers
AN MA
03/04/2026
Special inspection requirement — HVAC-R and service water heating system controls
AN MA
03/04/2026
Special inspection requirement — Energy Code Compliance Inspections
AN MA
03/04/2026
Special inspection requirement — Final
AN MA
03/04/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
AN MA
03/04/2026
Special inspection requirement — HVAC-R and service water heating equipment
AN MA
03/04/2026
Special inspection requirement — Mechanical Systems
AN MA
03/04/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
AN MA
02/18/2026
Objection resolved — Addressed
02/18/2026
Objection resolved — Addressed
12/24/2025
Objection raised — Scope
12/05/2025
Permit issued — General Construction
B00850239-I1-GC
12/04/2025
Filed — Alteration
TO REPAIR FRONT & REAR FACADE IN EXISTING 4 STORY DWELLING. NO CHANGE OF USE, EGRESS OR OCCUPANCY.
B00783526-P2
12/03/2025
Special inspection requirement — Metering
AN MA
12/02/2025
Permit issued — Mechanical Systems
B00783551-I1-MS
12/02/2025
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
11/28/2025
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
11/25/2025
Permit issued — General Construction
B00783526-I1-GC
11/18/2025
Special inspection requirement — Fire-Resistance Rated Construction
AN MA
11/18/2025
Special inspection requirement — Energy Code Compliance Inspections
AN MA
11/18/2025
Special inspection requirement — Lighting in dwelling units
AN MA
11/18/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
AN MA
11/18/2025
Special inspection requirement — Final
AN MA
11/07/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
10/20/2025
Permit issued — Plumbing
B01292513-I1-PL
10/09/2025
Filed — Alteration
TO INSTALL, RELOCATE OR REMOVE PLUMBING FIXTURES IN EXISTING APT. #3R. FILED IN CONJUNCTION W/ ALT #B00783526-I1. NO CHANGE OF USE, EGRESS OR OCCUPANCY.
B01292513-I1
10/06/2025
Objection resolved — Addressed
09/29/2025
Objection resolved — Addressed
09/24/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
AN MA
09/24/2025
Special inspection requirement — Energy Code Compliance Inspections
AN MA
09/24/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
AN MA
09/16/2025
Objection raised — Zoning
09/16/2025
Objection raised — Admin
09/16/2025
Objection raised — Scope
09/09/2025
Filed — Alteration
INSTALLATION OF PLUMBING SYSTEM. NO CHANGE OF USE, EGRESS OR OCCUPANCY.
B00783532-P1
09/09/2025
Filed — Alteration
INSTALLATION OF HEATING SYSTEM. NO CHANGE OF USE, EGRESS OR OCCUPANCY.
B00783551-P2
09/05/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
AN MA
09/05/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
AN MA
09/05/2025
Special inspection requirement — Energy Code Compliance Inspections
AN MA
09/05/2025
Special inspection requirement — Final
AN MA
09/05/2025
Special inspection requirement — HVAC-R and service water heating system controls
AN MA
09/05/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
AN MA
09/05/2025
Special inspection requirement — HVAC-R and service water heating equipment
AN MA
09/05/2025
Special inspection requirement — Shutoff dampers
AN MA
09/05/2025
Special inspection requirement — Maintenance information
AN MA
09/05/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
AN MA
09/05/2025
Special inspection requirement — Energy Code Compliance Inspections
AN MA
09/05/2025
Special inspection requirement — HVAC-R and service water heating system controls
AN MA
09/03/2025
Filed — Alteration
TO REPAIR FRONT & REAR FACADE IN EXISTING 4 STORY DWELLING. NO CHANGE OF USE, EGRESS OR OCCUPANCY.
B00783526-P1
08/26/2025
Permit issued — General Construction
B00783526-I1-GC
01/13/2025
Violation issued (HPD, closed)
B
09/23/2024
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
06/14/2024
Violation issued (HPD, closed)
C
04/19/2024
Permit issued — General Construction
B00783526-I1-GC
04/17/2024
Violation issued (HPD, closed)
B
03/08/2024
Objection resolved — Addressed
03/04/2024
Objection resolved — Addressed
Latest 60 of 155 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionPermit IssuedMETACOMET CONSTRUCTION12/05/2025
DOB NOWMechanical SystemsPermit IssuedMETACOMET CONSTRUCTION12/02/2025
DOB NOWGeneral ConstructionPermit IssuedMETACOMET CONSTRUCTION11/25/2025
DOB NOWPlumbingSigned-offAMM GEN'L CONTRACTING INC10/20/2025
DOB NOWGeneral ConstructionPermit IssuedMETACOMET CONSTRUCTION08/26/2025
DOB NOWGeneral ConstructionPermit IssuedMETACOMET CONSTRUCTION04/19/2024
DOB NOWPlumbingSigned-offETHOS PLUMBING CORP08/24/2023
1 project · most recent 09/09/2025
Heating Systems
FiledStatusContractorScopeMake / Model / Capacity
09/09/2025Permit IssuedMETACOMET CONSTRUCTIONHeating Systems
Heating
Runtal EB3-208D 3,000 BTU · Radiant ×114
2 projects · most recent 10/09/2025
Water/Sanitary Gas
FiledStatusContractorScope
10/09/2025Signed-offAMM GEN'L CONTRACTING INCGas, Water/Sanitary
09/09/2025Signed-offETHOS PLUMBING CORPWater/Sanitary
3 projects · most recent 09/04/2025
General Wiring
FiledStatusContractorScope
09/04/2025CompleteKJK ELECTRIC INCGeneral Wiring
12/11/2023CompleteCONDE ELECTRIC INCGeneral Wiring
04/10/2018Permit IssuedSWITCH ELECT OF THE FIVEGeneral Wiring
▾Field Inspections (DOB CAP) — 6
DateTypeResultReport
08/03/2026Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
08/03/2026Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
11/07/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
12/05/2023Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
12/05/2023Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
11/21/2023Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 47
DateRequirementInspectorRole
03/04/2026Maintenance informationAN MAenergy_progress
03/04/2026Shutoff dampersAN MAenergy_progress
03/04/2026HVAC-R and service water heating system controlsAN MAenergy_progress
03/04/2026Energy Code Compliance InspectionsAN MAprogress
03/04/2026FinalAN MAprogress
03/04/2026Fire-Resistant Penetrations and JointsAN MAspecial
03/04/2026HVAC-R and service water heating equipmentAN MAenergy_progress
03/04/2026Mechanical SystemsAN MAspecial
03/04/2026HVAC-R and service water piping design and insulationAN MAenergy_progress
12/03/2025MeteringAN MAenergy_progress
11/18/2025Fire-Resistance Rated ConstructionAN MAprogress
11/18/2025Energy Code Compliance InspectionsAN MAprogress
11/18/2025Lighting in dwelling unitsAN MAenergy_progress
11/18/2025Fire-Resistant Penetrations and JointsAN MAspecial
11/18/2025FinalAN MAprogress
09/24/2025Fire-Resistant Penetrations and JointsAN MAspecial
09/24/2025Energy Code Compliance InspectionsAN MAprogress
09/24/2025HVAC-R and service water piping design and insulationAN MAenergy_progress
09/05/2025HVAC-R and service water piping design and insulationAN MAenergy_progress
09/05/2025Fire-Resistant Penetrations and JointsAN MAspecial
09/05/2025Energy Code Compliance InspectionsAN MAprogress
09/05/2025FinalAN MAprogress
09/05/2025HVAC-R and service water heating system controlsAN MAenergy_progress
09/05/2025HVAC-R and service water piping design and insulationAN MAenergy_progress
09/05/2025HVAC-R and service water heating equipmentAN MAenergy_progress
Latest 25 of 47.
▾Documents — 103 on file (BIS + DOB NOW)
▸Plans & Drawings13
▸DOB NOWPlans/Sketch13
08/28/2026B00783532-P1Request digital key ↗
08/28/2026B00783532-P2Request digital key ↗
08/27/2026B00850239-I1Request digital key ↗
Showing 3 of 13 on file for this type
▸Applications & Permits16
▸DOB NOWLPC Approval/Permit13
08/20/2026B00783526-S1Open ↗
08/20/2026B00783551-P3Open ↗
08/13/2026B00783532-P2Open ↗
Showing 3 of 13 on file for this type
▸BISPLAN / WORK APPROVAL APPLICATION3
01/22/2021321970060Open ↗
07/15/2020321970060Open ↗
06/28/2019321970060Open ↗
▸Seals & Professional Certifications49
▸DOB NOWProgress Inspector Seal & Signature25
08/31/2026B00783551-I1Open ↗
08/31/2026B00783551-I1Open ↗
08/31/2026B00783551-I1Open ↗
Showing 3 of 25 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature12
08/28/2026B00783532-I1Open ↗
08/28/2026B00783532-P2Open ↗
08/28/2026B00783532-P1Open ↗
Showing 3 of 12 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature11
08/31/2026B00783551-I1Open ↗
08/31/2026B00783551-I1Open ↗
08/27/2026B00783526-P2Open ↗
Showing 3 of 11 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION1
06/28/2019321970060Open ↗
▸Trade Schedules & Equipment1
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE1
06/28/2019321970060Open ↗
▸Safety & Tenant Protection1
▸BISTenant Protection Plan and Notes1
06/28/2019321970060Open ↗
▸Environmental & Asbestos14
▸DOB NOWDEP ACP-5: Asbestos Assessment Report13
08/28/2026B00783532-P2Open ↗
08/28/2026B00783532-P1Open ↗
08/27/2026B00850239-I1Open ↗
Showing 3 of 13 on file for this type
▸BISASBESTOS: CERTIFICATION (DEP ACP5)1
06/28/2019321970060Open ↗
▸Energy Compliance1
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS1
06/28/2019321970060Open ↗
▸Approvals, Objections & Sign-offs1
▸BISLANDMARKS APPROVAL1
08/14/2019321970060Open ↗
▸Cost, Insurance & Ownership1
▸BISCOST AFFIDAVIT1
06/28/2019321970060Open ↗
▸Filing & Intake Forms2
▸BISADDITIONAL INFORMATION1
01/22/2021321970060Open ↗
▸BISEFILING COVER SHEET1
06/28/2019321970060Open ↗
▸Other Documents4
▸DOB NOWWaiver Document4
08/20/2026B00783551-P3Open ↗
08/13/2026B00783532-I1Open ↗
08/13/2026B00783532-P2Open ↗
Showing 3 of 4 on file for this type