← Back
Two family brick
32 RADDE PLACE
BROOKLYN · BIN 3042476
💬 Discuss this project
1920Year Built
2Stories
B1Building Class
R5Zoning
2,574 sfGross Floor Area
2Units
0 Open Violations
Two family brick · Owner of record: 32 RADDE LLC · 1,568 sf lot · 1.64 FAR built · Flood zone X
Locations of Work
ArchitecturePlumbingGeneral
Floor 210p · 1 filing · 20 docs
Floor 110p · 1 filing · 20 docs
Cellar12p · 1 filing · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
MORELL BUILDERS403/22/2026
32 RADDE LLC303/22/2026
32 RADDE PLACE803/21/2026
2015 ATLANTIC AVE203/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
AA BLDG & INSP SVC LLC305/09/2024
SUPERIOR HOME INSPECTION SERVICES403/08/2021
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
S Y CONSULTING VIOLATIONS603/21/2026
DMCONSULTING6860603/21/2026
5 BORO CONSTRUCTION CONSULTANTS103/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
STEVEN BOODHOOElectrical703/21/2026
G & C RESTORATION INCGeneral Contractor703/22/2026
SB RENOVATION & MODELINGGeneral Contractor407/08/2026
INFINITI ESC PLUMBING CORPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
AA BUILDING & INSPECTION1519305/09/2024
SUPERIOR - HOME INSPECTIO1804303/08/2021
Building Lifecycle
All (79)Filed (7)Permit Issued (4)Signed Off (2)Violation (13)Inspection (9)Objection (19)Special Inspection (25)
07/10/2024
Signed off — Alteration
B00151814-I1
06/24/2024
Signed off — Alteration CO
HEREWITH FILE ALTERATION CO IN ORDER TO CHANGE AN EXISTING TWO STORY BUILDING WITH RETAIL ON THE GROUND FLOOR AND DWELLING UNIT ABOVE TO A TWO FAMILY DWELLING. TO SUPERCEDE ALL PREVIOUS BIS APPLICATIONS AND TO OBTAIN A FINAL CERTIFICATE OF OCCUPANCY
B00774610-S1
06/21/2024
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
06/04/2024
Objection resolved — Resolved
05/25/2024
Objection resolved — Addressed
05/25/2024
Objection resolved — Addressed
05/16/2024
Objection raised — Scope
05/16/2024
Objection raised — Zoning
05/16/2024
Objection raised — Zoning
05/16/2024
Objection raised — Scope
05/16/2024
Objection raised — Zoning
05/16/2024
Objection raised — Scope
05/09/2024
Filed — Alteration CO
HEREWITH FILE ALTERATION CO IN ORDER TO CHANGE AN EXISTING TWO STORY BUILDING WITH RETAIL ON THE GROUND FLOOR AND DWELLING UNIT ABOVE TO A TWO FAMILY DWELLING. TO SUPERCEDE ALL PREVIOUS BIS APPLICATIONS AND TO OBTAIN A FINAL CERTIFICATE OF OCCUPANCY
B00774610-P2
03/27/2024
Inspection — Fail-Final CND-Occupancy Inspection
Fail
View inspection ↗
01/17/2024
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
07/14/2023
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
07/14/2023
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
06/17/2023
Permit issued — Plumbing
B00774610-S1-PL
04/11/2023
Objection raised — Scope
04/11/2023
Objection resolved — Addressed
03/27/2023
Objection raised — Admin
03/27/2023
Objection resolved — Addressed
03/27/2023
Objection raised — Inspections
03/27/2023
Objection resolved — Addressed
03/27/2023
Objection raised — Scope
03/27/2023
Objection resolved — Addressed
03/27/2023
Objection raised — Admin
03/27/2023
Objection resolved — Addressed
03/22/2023
Filed — Alteration CO
HEREWITH FILE ALTERATION CO IN ORDER TO CHANGE AN EXISTING TWO STORY BUILDING WITH RETAIL ON THE GROUND FLOOR AND DWELLING UNIT ABOVE TO A TWO FAMILY DWELLING. TO SUPERCEDE ALL PREVIOUS BIS APPLICATIONS AND TO OBTAIN A FINAL CERTIFICATE OF OCCUPANCY
B00774610-S1
03/21/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
Younes Abouyaala
03/21/2023
Special inspection requirement — Energy Code Compliance Inspections
Younes Abouyaala
03/21/2023
Special inspection requirement — Permanent certificate
Younes Abouyaala
03/21/2023
Special inspection requirement — Maintenance information
Younes Abouyaala
03/20/2023
Permit issued — Construction Fence
B00151814-I1-FN
03/08/2023
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
02/10/2023
Violation issued (ECB, closed)
Construction
02/10/2023
Violation issued (ECB, closed)
Construction
02/10/2023
Violation issued (ECB, closed)
Construction
02/10/2023
Violation issued (ECB, closed)
Construction
02/02/2023
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
01/13/2023
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
12/12/2022
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
10/14/2022
Permit issued — General Construction
B00774610-I1-GC-CX
07/20/2022
Filed — Alteration CO
HEREWITH FILE ALTERATION CO IN ORDER TO CHANGE AN EXISTING TWO STORY BUILDING WITH RETAIL ON THE GROUND FLOOR AND DWELLING UNIT ABOVE TO A TWO FAMILY DWELLING. TO SUPERCEDE ALL PREVIOUS BIS APPLICATIONS AND TO OBTAIN A FINAL CERTIFICATE OF OCCUPANCY
B00774610-I1
07/13/2022
Special inspection requirement — Interior lighting power
Younes Abouyaala
07/13/2022
Special inspection requirement — HVAC-R and service water piping design and insulation
Younes Abouyaala
07/13/2022
Special inspection requirement — HVAC-R and service water heating equipment
Younes Abouyaala
07/13/2022
Special inspection requirement — Structural Stability – Alterations of existing buildings
Younes Abouyaala
07/13/2022
Special inspection requirement — Mechanical Systems
Younes Abouyaala
07/13/2022
Special inspection requirement — Exterior Insulation and Finish Systems (EIFS)
Younes Abouyaala
07/13/2022
Special inspection requirement — Fire-Resistant Penetrations and Joints
Younes Abouyaala
07/13/2022
Special inspection requirement — Final
NAVEEN KUMAR
07/13/2022
Special inspection requirement — Energy Code Compliance Inspections
Younes Abouyaala
07/13/2022
Special inspection requirement — Fire-Resistance Rated Construction
Younes Abouyaala
07/13/2022
Special inspection requirement — Air barrier - visual inspection
Younes Abouyaala
07/13/2022
Special inspection requirement — Lighting controls
Younes Abouyaala
07/13/2022
Special inspection requirement — Fenestration and door U-factor and product ratings
Younes Abouyaala
07/13/2022
Special inspection requirement — HVAC-R and service water heating system controls
Younes Abouyaala
07/13/2022
Special inspection requirement — Duct leakage testing, insulation and design
Younes Abouyaala
07/13/2022
Special inspection requirement — Maintenance information
Younes Abouyaala
Latest 60 of 79 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingSigned-offINFINITI ESC PLUMBING COR06/17/2023
DOB NOWConstruction FenceSigned-offSB RENOVATION & MODELING03/20/2023
DOB NOWGeneral ConstructionPermit IssuedSB RENOVATION & MODELING10/14/2022
DOB NOWConstruction FenceSigned-offSB RENOVATION & MODELING08/06/2019
BISOTISSUEDMORELL BUILDERS INC07/02/2019
BISOTISSUEDKBJ CONSTRUCTION CORP04/20/2017
BISMHISSUEDEXCELLENCE IN PLUMBING03/21/1996
BISPLISSUEDEXCELLENCE IN PLUMBING03/21/1996
1 project · most recent 05/09/2024
Heating Systems Ventilation Systems
FiledStatusContractorScopeMake / Model / Capacity
05/09/2024Permit IssuedSB RENOVATION & MODELINGHeating Systems, Ventilation Systems
Cooling
Mitsubishi Electric M4H36W06060615-B 40,000 BTU ×2
Heating
Mitsubishi Electric M4H36W06060615-B 40,000 BTU ×2
Ventilation
Mitsubishi Electric M4H36W06060615-B 38,000 BTU ×2
1 project · most recent 03/08/2021
FiledStatusContractorScope
03/08/2021———
2 projects · most recent 05/09/2024
Water/Sanitary
FiledStatusContractorScope
05/09/2024Signed-offINFINITI ESC PLUMBING CORWater/Sanitary
03/08/2021——Water/Sanitary
2 projects · most recent 11/10/2021
General Wiring
FiledStatusContractorScope
11/10/2021CompleteK.A.B. ELECTRIC CORPGeneral Wiring
03/18/2020CancelledK.A.B. ELECTRIC CORPGeneral Wiring
▾Field Inspections (DOB CAP) — 9
DateTypeResultReport
06/21/2024Pass-Final CND-Occupancy InspectionPassView ↗
03/27/2024Fail-Final CND-Occupancy InspectionFailView ↗
01/17/2024Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
07/14/2023Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
07/14/2023Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
03/08/2023Pass-Final PL - Up to 3 Requested FloorsPassView ↗
02/02/2023Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
01/13/2023Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
12/12/2022Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 25
DateRequirementInspectorRole
03/21/2023Fire-Resistant Penetrations and JointsYounes Abouyaalaspecial
03/21/2023Energy Code Compliance InspectionsYounes Abouyaalaprogress
03/21/2023Permanent certificateYounes Abouyaalaenergy_progress
03/21/2023Maintenance informationYounes Abouyaalaenergy_progress
07/13/2022Interior lighting powerYounes Abouyaalaenergy_progress
07/13/2022HVAC-R and service water piping design and insulationYounes Abouyaalaenergy_progress
07/13/2022HVAC-R and service water heating equipmentYounes Abouyaalaenergy_progress
07/13/2022Structural Stability – Alterations of existing buildingsYounes Abouyaalaspecial
07/13/2022Mechanical SystemsYounes Abouyaalaspecial
07/13/2022Exterior Insulation and Finish Systems (EIFS)Younes Abouyaalaspecial
07/13/2022Fire-Resistant Penetrations and JointsYounes Abouyaalaspecial
07/13/2022FinalNAVEEN KUMARprogress
07/13/2022Energy Code Compliance InspectionsYounes Abouyaalaprogress
07/13/2022Fire-Resistance Rated ConstructionYounes Abouyaalaprogress
07/13/2022Air barrier - visual inspectionYounes Abouyaalaenergy_progress
07/13/2022Lighting controlsYounes Abouyaalaenergy_progress
07/13/2022Fenestration and door U-factor and product ratingsYounes Abouyaalaenergy_progress
07/13/2022HVAC-R and service water heating system controlsYounes Abouyaalaenergy_progress
07/13/2022Duct leakage testing, insulation and designYounes Abouyaalaenergy_progress
07/13/2022Maintenance informationYounes Abouyaalaenergy_progress
07/13/2022Fenestration air leakageYounes Abouyaalaenergy_progress
07/13/2022Permanent certificateYounes Abouyaalaenergy_progress
07/13/2022Fenestration areasYounes Abouyaalaenergy_progress
03/08/2021Fire-Resistant Penetrations and JointsSteven Williamsspecial
03/08/2021Sprinkler SystemsSteven Williamsspecial
▾Documents — 117 on file (BIS + DOB NOW)
▸Plans & Drawings7
▸DOB NOWPlans/Sketch5
09/01/2026B00481914-I1Request digital key ↗
09/01/2026B00481924-I1Request digital key ↗
08/25/2026B00774610-I1Request digital key ↗
Showing 3 of 5 on file for this type
▸DOB NOWPlans/Sketch - Sprinkler1
09/01/2026B00326570-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Construction Fence1
09/02/2026B00151814-I1Request digital key ↗
▸Applications & Permits16
▸BISPLAN / WORK APPROVAL APPLICATION14
07/29/2024340749667Open ↗
07/11/2024300501419Open ↗
07/03/2024321030843Open ↗
Showing 3 of 14 on file for this type
▸BISWORK PERMIT APPLICATION1
05/01/2017321030843Open ↗
▸BISPLAN - WORK & PERMITS - SUPPPORTING DOCUMENTATION1
03/18/2020321931790Open ↗
▸Zoning, Tax Lot & Property Records1
▸DOB NOWHouse Number Verification: TOPO Stamp1
08/13/2026B00774610-I1Open ↗
▸Seals & Professional Certifications30
▸DOB NOWDPL-1: Design Professional Seal & Signature7
09/02/2026B00151814-I1Open ↗
09/01/2026B00481914-I1Open ↗
09/01/2026B00481924-I1Open ↗
Showing 3 of 7 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION6
04/08/2019321931790Open ↗
12/13/2018321005531Open ↗
03/30/2018321005531Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWProgress Inspector Seal & Signature6
09/01/2026B00774610-I1Open ↗
09/01/2026B00774610-I1Open ↗
09/01/2026B00774610-I1Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature5
09/01/2026B00774610-I1Open ↗
09/01/2026B00774610-I1Open ↗
09/01/2026B00481924-I1Open ↗
Showing 3 of 5 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST2
04/08/2019321931790Open ↗
05/01/2017321030843Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT2
04/08/2019321931790Open ↗
05/01/2017321030843Open ↗
▸BISAPPLICANT OWNER SIGNATURE1
08/25/2020340749667Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY1
08/25/2020340749667Open ↗
▸Trade Schedules & Equipment3
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE2
11/27/2019321005531Open ↗
03/30/2018321005531Open ↗
▸BISSCHEDULE B - PLUMBING1
06/15/2010320164567Open ↗
▸Safety & Tenant Protection5
▸BISSTREET TREE CHECKLIST2
08/25/2020340749667Open ↗
03/30/2018321005531Open ↗
▸DOB NOWStreet Tree Checklist2
08/13/2026B00774610-I1Open ↗
08/13/2026B00774610-P2Open ↗
▸BISDEMOLITION SUBMITTAL CERTIFICATION FORM1
09/10/2020340749667Open ↗
▸Environmental & Asbestos10
▸DOB NOWDEP ACP-5: Asbestos Assessment Report6
09/01/2026B00481914-I1Open ↗
09/01/2026B00481924-I1Open ↗
08/25/2026B00774610-I1Open ↗
Showing 3 of 6 on file for this type
▸BISASBESTOS: CERTIFICATION (DEP ACP5)3
03/09/2021340749667Open ↗
04/08/2019321931790Open ↗
03/30/2018321005531Open ↗
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'1
06/15/2010320164567Open ↗
▸Energy Compliance10
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS4
12/13/2018321005531Open ↗
03/30/2018321005531Open ↗
12/11/2017321030843Open ↗
Showing 3 of 4 on file for this type
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY2
12/22/2020321931790Open ↗
08/25/2020340749667Open ↗
▸BISAS-BUILT ENERGY ANALYSIS2
12/22/2020321931790Open ↗
12/11/2017321030843Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY FOR ENERGY CODE PROGRESS INSPECTIONS1
08/25/2020340749667Open ↗
▸DOB NOWEN2: As Built Energy Analysis1
08/13/2026B00774610-I1Open ↗
▸Inspections & Test Reports2
▸BISTECHNICAL REPORT: RESPONSIBILITY2
12/22/2020321931790Open ↗
08/25/2020340749667Open ↗
▸Approvals, Objections & Sign-offs5
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST2
12/22/2020321931790Open ↗
12/11/2017321030843Open ↗
▸BISSCHEDULE A - OCCUPANCY / USE2
03/30/2018321005531Open ↗
08/25/2020340749667Open ↗
▸BISADMINISTRATIVE OBJECTIONS1
05/19/2010320164567Open ↗
▸Cost, Insurance & Ownership9
▸BISCOST AFFIDAVIT9
12/22/2020321931790Open ↗
12/10/2020340749667Open ↗
12/09/2020340749667Open ↗
Showing 3 of 9 on file for this type
▸Filing & Intake Forms14
▸BISADDITIONAL INFORMATION7
03/09/2021340749667Open ↗
12/10/2020340749667Open ↗
12/09/2020340749667Open ↗
Showing 3 of 7 on file for this type
▸BISEFILING COVER SHEET4
04/05/2019321931790Open ↗
03/30/2018321005531Open ↗
04/25/2017321030843Open ↗
Showing 3 of 4 on file for this type
▸BISBOROUGH INTAKE FORM2
03/27/2020321931790Open ↗
12/11/2017321030843Open ↗
▸BISEFILING JOB APPLICATION COVER SHEET1
08/25/2020340749667Open ↗
▸Other Documents5
▸BISPLOT DIAGRAM2
08/25/2020340749667Open ↗
03/30/2018321005531Open ↗
▸DOB NOWProperty Ownership Certification2
08/25/2026B00774610-I1Open ↗
08/15/2026B00774610-P2Open ↗
▸DOB NOWFinal Survey1
08/13/2026B00774610-I1Open ↗