← Back
Unlicensed parking lot
32 SKILLMAN STREET
BROOKLYN · BIN 3429992
💬 Discuss this project
0Year Built
—Stories
G7Building Class
M1-2/R6AZoning
0 sfGross Floor Area
0Units
0 Open ViolationsFDNY Report ↗
Unlicensed parking lot · Owner of record: LOT 15 LLC · 5,758 sf lot · 0 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralElectricalMechanicalPlumbingFire Protection
Permit Issued — active, not yet Signed-off
RoofUnder Construction83p · 5 filings · 20 docs
Floor 9Under Construction60p · 4 filings · 20 docs
Floor 8Under Construction60p · 4 filings · 20 docs
Floor 7Under Construction59p · 4 filings · 20 docs
Floor 6Under Construction58p · 4 filings · 20 docs
Floor 5Under Construction79p · 4 filings · 20 docs
Floor 4Under Construction78p · 4 filings · 20 docs
Floor 3Under Construction78p · 4 filings · 20 docs
Floor 2Under Construction79p · 4 filings · 20 docs
Floor 1Under Construction56p · 4 filings · 20 docs
CellarUnder Construction67p · 2 filings · 20 docs
1 job · most recent 11/14/2025
Air Conditioning Systems Heating Systems Ventilation Systems
FiledStatusContractorScopeMake / Model / Capacity
11/14/2025Permit IssuedRIVERSIDE DEVELOPERS USAAir Conditioning Systems, Heating Systems, Ventilation Systems
Cooling
Mitsubishi Electric MXZ-SM36NAM2-U1 36,000 BTU · Heat Pump Outdoor ×40
MXZ-3C24NA3-U1 22,000 BTU · Heat Pump Outdoor ×7
MXZ-2C20NA3-U1 18,000 BTU · Heat Pump Outdoor ×6
PUZ-A12NKA7 12,000 BTU · Heat Pump Outdoor ×2
MXZ-SM60NAM2-U1 60,000 BTU · Heat Pump Outdoor ×1
PUZ-A36NKA7 36,000 BTU · Heat Pump Outdoor ×1
Trane 4WCC4024A1000A 24,600 BTU · Heat Pump Outdoor ×1
Heating
Mitsubishi Electric MXZ-SM36NAM2-U1 41,000 BTU · Heat Pump Outdoor ×40
MXZ-3C24NA3-U1 25,000 BTU · Heat Pump Outdoor ×7
MXZ-2C20NA3-U1 22,000 BTU · Heat Pump Outdoor ×6
PUZ-A12NKA7 14,000 BTU · Heat Pump Outdoor ×2
MXZ-SM60NAM2-U1 66,000 BTU · Heat Pump Outdoor ×1
PUZ-A36NKA7 38,000 BTU · Heat Pump Outdoor ×1
Trane 4WCC4024A1000A 22,000 BTU · Heat Pump Outdoor ×1
Ventilation
Greenheck CUE-090-VG 450 CFM · Exhaust Fan ×3
AX-31-160-0416 1,285 CFM · Exhaust Fan ×2
G-080-VG 275 CFM · Exhaust Fan ×2
G-090-VG 450 CFM · Exhaust Fan ×2
1 job · most recent 11/14/2025
Sprinkler System
FiledStatusContractorScope
11/14/2025Permit IssuedTRISTATE FIRE SPRINK INCSprinkler System
2 jobs · most recent 11/14/2025
Storm Water/Sanitary Gas
FiledStatusContractorScope
11/14/2025Permit IssuedMMI PLUMBING & HEATING INGas, Storm, Water/Sanitary
11/14/2024Permit IssuedMMI PLUMBING & HEATING INStorm, Water/Sanitary
6 jobs · most recent 08/31/2026
General Wiring
FiledStatusContractorScope
08/31/2026Permit IssuedDENALI ELECTRIC CORP—
12/18/2025Permit IssuedHIGH STANDARD ELECTRICGeneral Wiring
08/27/2025Permit IssuedHIGH STANDARD ELECTRIC—
08/13/2025Permit IssuedSOLAS ELECTRICAL CORP—
08/07/2025Permit IssuedSOLAS ELECTRICAL CORP—
07/08/2025Permit IssuedHIGH STANDARD ELECTRIC55 meters, 55 new_meters
1 job · most recent 11/14/2025
Concrete Masonry
FiledStatusContractorScope
11/14/2025Permit IssuedTRISTATE FIRE SPRINK INCConcrete, Masonry
1 job · most recent 11/14/2025
Earthwork
FiledStatusContractorScope
11/14/2025Permit IssuedTRISTATE FIRE SPRINK INCEarthwork
Building Lifecycle
All (130)Filed (17)Permit Issued (29)Signed Off (2)Violation (3)Inspection (11)Objection (38)Special Inspection (30)
09/09/2026
Permit issued — Protection and Mechanical Methods
B01285963-I1-PMM
09/01/2026
Permit issued — Sprinklers
B01139625-S4-EW-SD
09/01/2026
Permit issued — Sprinklers
B01139625-S4-EW-SP
09/01/2026
Permit issued — Standpipe
B01139625-S7-EW-SD
08/10/2026
Signed off — New Building
TEMPORARY STANDPIPE SYSTEM FILED IN CONJUNCTION WITH NB JOB NUMBER B01139625-I1.
B01139625-S9
08/04/2026
Permit issued — Protection and Mechanical Methods
B01266242-I1-PMM
08/04/2026
Permit issued — Supported Scaffold
B01266226-I1-SF
08/04/2026
Permit issued — Protection and Mechanical Methods
B01266240-I1-PMM
08/03/2026
Permit issued — Sidewalk Shed
B01266225-I1-SH
07/23/2026
Inspection — Fail-Final PL - Up to 3 Requested Floors
Fail
View inspection ↗
07/21/2026
Permit issued — Plumbing
B01139625-S3-PL
07/21/2026
Permit issued — Plumbing
B01139649-I1-PL
07/20/2026
Inspection — Pass-Final PL - Up to 9 Requested Floors
Pass
View inspection ↗
07/13/2026
Signed off — New Building
TEMPORARY STANDPIPE SYSTEM FILED IN CONJUNCTION WITH NB JOB NUMBER B01139625-I1.
B01139625-Z1
07/08/2026
Inspection — Pass-Final PL - Up to 9 Requested Floors
Pass
View inspection ↗
06/02/2026
Permit issued — General Construction
B01139625-I1-GC
05/22/2026
Permit issued — Plumbing
B01139625-S3-PL
05/19/2026
Permit issued — Plumbing
B01139649-I1-PL
05/15/2026
Permit issued — Mechanical Systems
B01139625-S2-MS
03/31/2026
Inspection — Certified StandPipe - SD - Alarm Sys 64/09 - Finish
Certified
View inspection ↗
03/31/2026
Inspection — Certified StandPipe - SD - Hydrostatic 63/09 Test (Initial 75 Feet)
Certified
View inspection ↗
03/19/2026
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
02/22/2026
Violation issued (ECB, closed)
Unknown
02/22/2026
Violation issued (ECB, closed)
Construction
02/13/2026
Inspection — Certified Storm Drainage-ST-Piping-Roughing
Certified
View inspection ↗
12/30/2025
Permit issued — Earth Work
B01139625-S8-FO-EA
12/30/2025
Permit issued — Foundation
B01139625-S9-FO
12/30/2025
Permit issued — General Construction
B01139625-I1-GC
12/30/2025
Permit issued — Support of Excavation
B01139625-Z1-SE
12/30/2025
Permit issued — Structural
B01139625-S1-ST
12/12/2025
Objection resolved — Addressed
12/12/2025
Objection resolved — Addressed
12/10/2025
Objection raised — Structural
12/10/2025
Objection raised — Admin
12/04/2025
Objection resolved — Addressed
12/04/2025
Objection resolved — Addressed
12/04/2025
Objection resolved — Addressed
12/04/2025
Objection resolved — Addressed
12/04/2025
Objection resolved — Addressed
12/04/2025
Objection resolved — Addressed
12/04/2025
Objection resolved — Addressed
12/04/2025
Objection resolved — Addressed
12/04/2025
Objection resolved — Addressed
12/04/2025
Objection resolved — Addressed
12/04/2025
Objection resolved — Addressed
12/04/2025
Objection resolved — Addressed
12/02/2025
Objection raised — Structural
12/02/2025
Objection raised — Structural
12/02/2025
Objection raised — Structural
12/02/2025
Objection raised — Structural
11/25/2025
Objection raised — Structural
11/25/2025
Objection raised — Structural
11/25/2025
Objection raised — Structural
11/25/2025
Objection raised — Structural
11/25/2025
Objection raised — Structural
11/25/2025
Objection raised — Structural
11/25/2025
Objection raised — Structural
11/25/2025
Objection raised — Structural
11/14/2025
Filed — New Building
TEMPORARY STANDPIPE SYSTEM FILED IN CONJUNCTION WITH NB JOB NUMBER B01139625-I1.
B01139625-S9
11/14/2025
Filed — New Building
TEMPORARY STANDPIPE SYSTEM FILED IN CONJUNCTION WITH NB JOB NUMBER B01139625-I1.
B01139625-Z1
Latest 60 of 130 events.
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
OWNERS REP1809/10/2026
RIVERSIDE DEVELOPERS3009/07/2026
RIVERSIDE DEVELOPERS USA303/22/2026
LOT 15 LLC103/22/2026
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
AE DESIGN SOLUTION1203/21/2026
BAC Developers Group1203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
CORE SCAFFOLD SYSTEMS INC.General Contractor1309/10/2026
TRISTATE FIRE SPRINK INCFire Protection609/07/2026
RIVERSIDE DEVELOPERS USAGeneral Contractor607/08/2026
MMI PLUMBING & HEATING INC.Plumbing407/22/2026
HIGH STANDARD ELECTRICElectrical103/22/2026
B&B MECH PLBG & HTG LLCPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
TECNICO SPECIAL INSPECTIO5939911/14/2025
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWProtection and Mechanical MethodsPermit IssuedCORE SCAFFOLD SYSTEMS INC.09/09/2026
DOB NOWSprinklersPermit IssuedTRISTATE FIRE SPRINK INC09/01/2026
DOB NOWSprinklersPermit IssuedTRISTATE FIRE SPRINK INC09/01/2026
DOB NOWStandpipePermit IssuedTRISTATE FIRE SPRINK INC09/01/2026
DOB NOWProtection and Mechanical MethodsPermit IssuedCORE SCAFFOLD SYSTEMS INC.08/04/2026
DOB NOWSupported ScaffoldPermit IssuedCORE SCAFFOLD SYSTEMS INC.08/04/2026
DOB NOWProtection and Mechanical MethodsPermit IssuedCORE SCAFFOLD SYSTEMS INC.08/04/2026
DOB NOWSidewalk ShedPermit IssuedCORE SCAFFOLD SYSTEMS INC.08/03/2026
DOB NOWPlumbingPermit IssuedMMI PLUMBING & HEATING INC.07/21/2026
DOB NOWPlumbingPermit IssuedMMI PLUMBING & HEATING INC.07/21/2026
DOB NOWGeneral ConstructionPermit IssuedM&G PLUMBING AND HEATING06/02/2026
DOB NOWPlumbingPermit IssuedMMI PLUMBING & HEATING INC.05/22/2026
DOB NOWPlumbingPermit IssuedMMI PLUMBING & HEATING INC.05/19/2026
DOB NOWMechanical SystemsPermit IssuedRIVERSIDE DEVELOPERS USA05/15/2026
DOB NOWEarth WorkPermit IssuedRIVERSIDE DEVELOPERS USA12/30/2025
DOB NOWFoundationSigned-offRIVERSIDE DEVELOPERS USA12/30/2025
DOB NOWGeneral ConstructionPermit IssuedRIVERSIDE DEVELOPERS USA12/30/2025
DOB NOWSupport of ExcavationSigned-offRIVERSIDE DEVELOPERS USA12/30/2025
DOB NOWStructuralSigned-offRIVERSIDE DEVELOPERS USA12/30/2025
DOB NOWProtection and Mechanical MethodsPermit IssuedCORE SCAFFOLD SYSTEMS INC11/05/2025
DOB NOWProtection and Mechanical MethodsPermit IssuedCORE SCAFFOLD SYSTEMS INC09/15/2025
DOB NOWSprinklersPermit IssuedTRISTATE FIRE SPRINK INC09/08/2025
DOB NOWStandpipePermit IssuedTRISTATE FIRE SPRINK INC09/03/2025
DOB NOWStandpipePermit IssuedTRISTATE FIRE SPRINK INC09/03/2025
DOB NOWSupported ScaffoldPermit IssuedCORE SCAFFOLD SYSTEMS INC08/05/2025
DOB NOWProtection and Mechanical MethodsPermit IssuedCORE SCAFFOLD SYSTEMS INC08/05/2025
DOB NOWSidewalk ShedPermit IssuedCORE SCAFFOLD SYSTEMS INC08/05/2025
DOB NOWProtection and Mechanical MethodsPermit IssuedCORE SCAFFOLD SYSTEMS INC08/05/2025
DOB NOWPlumbingPermit IssuedTARGET PIPING NY LLC11/13/2024
▾Field Inspections (DOB CAP) — 11
DateTypeResultReport
07/23/2026Fail-Final PL - Up to 3 Requested FloorsFailView ↗
07/20/2026Pass-Final PL - Up to 9 Requested FloorsPassView ↗
07/08/2026Pass-Final PL - Up to 9 Requested FloorsPassView ↗
03/31/2026Certified StandPipe - SD - Alarm Sys 64/09 - FinishCertifiedView ↗
03/31/2026Certified StandPipe - SD - Hydrostatic 63/09 Test (Initial 75 Feet)CertifiedView ↗
03/19/2026Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
02/13/2026Certified Storm Drainage-ST-Piping-RoughingCertifiedView ↗
12/05/2024Pass-Final PL - Up to 3 Requested FloorsPassView ↗
11/21/2024Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
11/21/2024Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
05/10/2023Pass-Final PL - Up to 3 Requested FloorsPassView ↗
▾Special Inspection Requirements (DOB NOW) — 98
DateRequirementInspectorRole
11/12/2025Footing and FoundationJose Lockhartprogress
11/12/2025Post-installed AnchorsJose Lockhartspecial
11/12/2025Subgrade InspectionsJose Lockhartspecial
11/12/2025Subsurface Conditions – Fill Placement & In-Place DensityJose Lockhartspecial
11/12/2025Subsurface Investigations (Borings/Test Pits)Walter Kaeckspecial
11/12/2025FinalJose Lockhartprogress
11/12/2025Footing and FoundationJose Lockhartprogress
11/12/2025Concrete - Cast-In-PlaceJose Lockhartspecial
11/12/2025Excavations - Sheeting, Shoring, and BracingJose Lockhartspecial
11/12/2025Structural Steel - WeldingJose Lockhartspecial
11/12/2025Structural Steel - DetailsJose Lockhartspecial
11/12/2025Concrete - Cast-In-PlaceJose Lockhartspecial
11/12/2025Post-installed AnchorsJose Lockhartspecial
11/12/2025Structural Stability – Alterations of existing buildingsJose Lockhartspecial
11/12/2025Subgrade InspectionsJose Lockhartspecial
11/12/2025Subsurface Conditions – Fill Placement & In-Place DensityJose Lockhartspecial
11/12/2025UnderpinningJose Lockhartspecial
11/12/2025Subsurface Investigations (Borings/Test Pits)Walter Kaeckspecial
11/12/2025FinalJose Lockhartprogress
08/07/2025Standpipe SystemsJose Lockhartspecial
07/01/2025Fire-Resistant Penetrations and JointsJose Lockhartspecial
07/01/2025Energy Code Compliance InspectionsJose Lockhartprogress
07/01/2025HVAC-R and service water heating system controlsJose Lockhartenergy_progress
07/01/2025HVAC-R and service water piping design and insulationJose Lockhartenergy_progress
07/01/2025HVAC-R and service water heating equipmentJose Lockhartenergy_progress
Latest 25 of 98.
▾Documents — 85 on file (BIS + DOB NOW)
▸Plans & Drawings18
▸DOB NOWPlans/Sketch18
08/23/2026B01139649-I1Request digital key ↗
08/23/2026B01139649-P1Request digital key ↗
08/22/2026B01139625-P1Request digital key ↗
Showing 3 of 18 on file for this type
▸Applications & Permits1
▸DOB NOWHPD - Permit Notice1
08/13/2026B01139625-I1Open ↗
▸Zoning, Tax Lot & Property Records6
▸DOB NOWZD1: DOB Zoning Diagram2
08/13/2026B01139625-P1Open ↗
08/13/2026B01139625-I1Open ↗
▸DOB NOWHouse Number Verification: TOPO Stamp2
08/13/2026B01139625-P1Open ↗
08/13/2026B01139625-I1Open ↗
▸DOB NOWZoning Exhibit form (1-5)2
08/13/2026B01139625-P1Open ↗
08/13/2026B01139625-I1Open ↗
▸Seals & Professional Certifications41
▸DOB NOWDPL-1: Design Professional Seal & Signature18
08/23/2026B01139649-I1Open ↗
08/22/2026B01139625-Z1Open ↗
08/22/2026B01139625-S9Open ↗
Showing 3 of 18 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature13
09/23/2026B01139625-S7Open ↗
09/02/2026B01139625-S3Open ↗
09/02/2026B01139625-S3Open ↗
Showing 3 of 13 on file for this type
▸DOB NOWProgress Inspector Seal & Signature10
09/02/2026B01139625-S3Open ↗
09/02/2026B01139625-S3Open ↗
09/02/2026B01139625-S8Open ↗
Showing 3 of 10 on file for this type
▸Trade Schedules & Equipment3
▸DOB NOWDEP: Sewer Certification (Sanitary/Storm)2
08/13/2026B01139625-P1Open ↗
08/13/2026B01139625-I1Open ↗
▸DOB NOWStandpipe Alarms Drawings1
08/13/2026B01139625-I1—
▸Safety & Tenant Protection3
▸DOB NOWStreet Tree Checklist2
08/13/2026B01139625-P1Open ↗
08/13/2026B01139625-I1Open ↗
▸DOB NOWParks Department Acknowledgment Letter for Street Trees Plan1
08/13/2026B01139625-I1Open ↗
▸Inspections & Test Reports4
▸DOB NOWSOIL REPORT2
08/13/2026B01139625-S9Open ↗
08/13/2026B01139625-S8Open ↗
▸DOB NOWTR4 Test Report and Plot Diagram2
08/13/2026B01139625-S8Open ↗
08/13/2026B01139625-S9Open ↗
▸Other Documents9
▸DOB NOWSite Survey: Initial2
08/13/2026B01139625-I1Open ↗
08/13/2026B01139625-P1Open ↗
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone2
08/13/2026B01139625-I1Open ↗
08/13/2026B01139625-P1Open ↗
▸DOB NOWAdjoining Owners Notification2
08/13/2026B01139625-S8Open ↗
08/13/2026B01139625-Z1Open ↗
▸DOB NOWProperty Ownership Certification2
08/22/2026B01139625-P1Open ↗
08/22/2026B01139625-I1Open ↗
▸DOB NOWEvaluation of Adjacent Building Report (BC 1817.3)1
08/13/2026B01139625-S9Open ↗