| Filed | Status | Contractor | Scope | Make / Model / Capacity |
|---|---|---|---|---|
| 08/31/2026 | Permit Issued | DONNELLY MECHANICAL CORP | Air Conditioning Systems | Cooling |
| 07/13/2026 | Permit Issued | DB ACE INC | Others, Ventilation Systems | |
| 05/18/2026 | Signed-off | MECHANICAL EAST CO.,INC | Heating and Air Conditioning Systems | Heat / Cool Mitsubishi Electric PUY-A24NHA7 24,000 BTU · Split System ×1 |
| 04/20/2020 | — | — | Associated Ducts and Piping | — |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 08/20/2026 | — | — | 15 heads |
| 07/13/2026 | Permit Issued | AVON PLBG & HTG INC | — |
| 04/22/2026 | Signed-off | ALLSTATE SPRINKLER LLC | — |
| 12/23/2025 | Signed-off | BEDROCK MECHANICAL INC | 6 heads |
| 11/10/2025 | Signed-off | A + SPRINKLER CORP | Sprinkler System |
| 07/08/2020 | — | — | 2 heads |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 08/20/2026 | — | — | — |
| 07/13/2026 | Permit Issued | AVON PLBG & HTG INC | Water/Sanitary |
| 04/22/2026 | Signed-off | J. CAIAZZO PLBG & HTG COR | Water/Sanitary |
| 12/23/2025 | Signed-off | A&A PLUMBING CORP | Water/Sanitary |
| 11/10/2025 | Signed-off | A&A PLUMBING CORP | Water/Sanitary |
| 07/08/2020 | Signed-off | PIPESTYLISTS, INC | Water/Sanitary |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 09/11/2026 | Permit Issued | MRD ELEC'L SERVICES, INC | General Wiring |
| 08/13/2026 | Permit Issued | Y.S ELECTRIC | General Wiring, Lighting |
| 06/09/2026 | Permit Issued | WESTSIDE ELECTRIC INC | 1 meters, 1 new_meters |
| 04/14/2026 | Permit Issued | A2K ELECTRIC CORP | General Wiring |
| 01/21/2026 | Permit Issued | EVS ELECTRIC CORP | General Wiring |
| 12/23/2025 | Permit Issued | TITAN ELEC'L & ELEV CONTR | — |
| 11/13/2025 | Permit Issued | NYCOM ELECTRICAL CORP | — |
| 08/15/2025 | Permit Issued | M.C. ELECTRICAL NY INC | General Wiring |
| 07/15/2025 | Permit Issued | RONAN ELECTRICAL LLC | General Wiring |
| 05/03/2023 | Complete | ILLUMINOUS ELECTRIC CORP. | General Wiring |
| 02/15/2023 | Permit Issued | OMD ELECTRICAL CORP | 1 meters, 1 new_meters |
| 08/20/2021 | Permit Issued | EMANON ELECTRIC INC. | General Wiring |
| 09/28/2020 | Complete | Y ELECTRIC INC | General Wiring |
| 03/13/2020 | Complete | L J ELEC'L SERV. INC. | General Wiring |
| 04/09/2019 | Permit Issued | BERNARDI ELECTRIC INC. | General Wiring |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 05/05/2026 | Signed-off | FALCON ENTERPRISES INC | Steel, Wood |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 07/13/2026 | Permit Issued | DB ACE INC | Fence |
| 05/15/2024 | Permit Issued | PLATINUM SERVICES NY LLC | Scaffold |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 04/22/2025 | Permit Issued | TRIBUTE RESTORATION INC | Suspended Scaffold (SC) |
| 01/08/2025 | Permit Issued | DOMUM, LLC | Suspended Scaffold (SC) |
| Owner | Filings | Most Recent |
|---|---|---|
| C O RESOLUTION REAL ESTATE | 150 | 09/14/2026 |
| PLATINUM SERVICES NY | 16 | 07/08/2026 |
| EVO REAL ESTATE GROUP | 15 | 07/08/2026 |
| WINOKER REALTY | 35 | 03/22/2026 |
| WINDKER REALTY | 1 | 03/22/2026 |
| W WINOKER REALTY CORP | 8 | 03/22/2026 |
| WINSTEN REALTY CORP. | 1 | 03/22/2026 |
| 462 W WINOKER REALTY CORP | 1 | 03/22/2026 |
| KLEIN LLC/ TOYS R US | 1 | 03/22/2026 |
| WINKER REALTY | 1 | 03/22/2026 |
| Firm | Filings | Most Recent |
|---|---|---|
| NEWTEC ENGINEERING | 1 | 08/31/2026 |
| COLLADO ENGINEERING | 1 | 08/20/2026 |
| YOUN DESIGN CORP. | 4 | 08/02/2026 |
| JONGSEO KIM ARCHITECT PC | 2 | 07/13/2026 |
| GENSLER | 4 | 06/23/2026 |
| HKC ENGINEERING P.C. | 3 | 06/10/2026 |
| GC ENG & ASSOCIATES, PC | 2 | 05/18/2026 |
| Z & T ENGINEERING, P.C. | 4 | 05/05/2026 |
| FISKAA ENGINEERING | 3 | 04/22/2026 |
| GRM CONSULTANTS LLC | 3 | 03/10/2026 |
| YAO W GUO ARCHITECT, PC | 4 | 01/26/2026 |
| TPG ARCHITECTURE, LLP | 3 | 12/29/2025 |
| CFS ENGINEERING, DPC | 9 | 12/23/2025 |
| MG ENGINEERING D.P.C. | 4 | 11/12/2025 |
| THE EIPEL ENGINEERING GROUP, D.P.C. | 1 | 05/15/2025 |
| HALSEY MCCORMACK HELMER INC | 1 | 05/09/2025 |
| ASHRAF CORP | 4 | 05/15/2024 |
| PS ENGINEERS, INC. | 1 | 02/19/2024 |
| FL&M ENGINEERING DESIGN &INSPECTION | 1 | 10/18/2023 |
| BAZINI ENGINEERING, P.C. | 1 | 08/28/2023 |
| JOHN F. GIUSEFFI, ARCHITECT, PC | 2 | 12/01/2022 |
| OFFICE OF JAMES RUDERMAN | 2 | 08/26/2021 |
| TWIG CONSULTING ENGINEERS PC | 5 | 08/18/2021 |
| LEON SKVIRSKY PE | 1 | 08/27/2020 |
| FONTAN ARCHITECTURE PLLC | 2 | 07/08/2020 |
| Representative | Filings | Most Recent |
|---|---|---|
| METROPOLIS GROUP INC | 24 | 03/21/2026 |
| WILLIAM VITACCO ASSOCIATES | 14 | 03/21/2026 |
| A1 EXPEDITING SERVICE CORP. | 20 | 03/21/2026 |
| CONCEPT DESIGN GROUP | 3 | 03/21/2026 |
| PAUL FUSCO CONSULTING | 10 | 03/21/2026 |
| LOUIS STRIAR | 6 | 03/21/2026 |
| PS ENGINEERS | 8 | 03/21/2026 |
| PLATINUM SERVICES NY | 6 | 03/21/2026 |
| W J PROFESSIONAL EXPEDITING COMPANY | 2 | 03/21/2026 |
| WILLIAM VITTACO ASSOCIATES | 2 | 03/21/2026 |
| Firm | Trade | Roles | Most Recent |
|---|---|---|---|
| REMI INTERIORS INC | General Contractor | 10 | 04/09/2026 |
| PLATINUM SERVICES NY LLC | General Contractor | 10 | 07/08/2026 |
| CROSSTOWN CONTRACTOR INC | General Contractor | 9 | 03/21/2026 |
| A.W. & S. CONSTRUCTION CO | General Contractor | 7 | 06/28/2026 |
| CONSTRUCTION MANAGEMENT & | General Contractor | 5 | 07/08/2026 |
| TRIBUTE RESTORATION INC | General Contractor | 5 | 07/08/2026 |
| A/C ELEC. OF NEW YORK INC | Electrical | 4 | 03/22/2026 |
| DB ACE INC | General Contractor | 3 | 07/15/2026 |
| MAUCERI SIGN | Scaffold | 2 | 07/08/2026 |
| TRU-ART SIGN | Scaffold | 2 | 07/08/2026 |
| PRACTICAL PLBG & HTG INC | Fire Protection | 2 | 07/08/2026 |
| A&A PLUMBING CORP | Plumbing | 2 | 07/08/2026 |
| MC GOWAN BUILDERS INC | General Contractor | 2 | 04/09/2026 |
| ALLSTATE SPRINKLER LLC | Fire Protection | 1 | 07/08/2026 |
| A + SPRINKLER CORP | Fire Protection | 1 | 07/08/2026 |
| AVON PLBG & HTG INC | Fire Protection | 1 | 08/10/2026 |
| BEDROCK MECHANICAL INC | Fire Protection | 1 | 07/08/2026 |
| NYC FIRE SPRINKLER CORP | Fire Protection | 1 | 07/08/2026 |
| UNLIMITED PLG SOLUTIONS | Fire Protection | 1 | 07/08/2026 |
| DONNELLY MECHANICAL CORP | General Contractor | 1 | 09/07/2026 |
| FALCON ENTERPRISES | General Contractor | 1 | 07/08/2026 |
| MECHANICAL EAST CO.,INC | General Contractor | 1 | 07/08/2026 |
| TRU-ART SIGN CO.INC | General Contractor | 1 | 04/09/2026 |
| AVON PLBG & HTG INC | Plumbing | 1 | 07/10/2026 |
| J. CAIAZZO PLBG & HTG COR | Plumbing | 1 | 07/08/2026 |
| Agency | License # | Filings | Most Recent |
|---|---|---|---|
| OBAID MIAN | 849 | 1 | 08/31/2026 |
| MILROSE CONSULTANTS LLC | 2003 | 6 | 06/23/2026 |
| CHONG ENGINEERING P.C. | 7411 | 4 | 06/10/2026 |
| GC ENG & ASSOCIATES PC | 1796 | 3 | 05/18/2026 |
| Z & T ENGINEERING, P.C. | 591 | 4 | 05/05/2026 |
| SKYLINE ENGINEERING, PLLC | 267 | 1 | 01/21/2026 |
| SHAHRISH SHUVO ENGINEERIN | 8524 | 4 | 12/29/2025 |
| EP INSPECTIONS AND COMMIS | 7079 | 5 | 11/12/2025 |
| PSI AGENCY INC. | 254 | 8 | 11/10/2025 |
| FRANCISCO D. PEREZ PE | 3306 | 3 | 01/08/2025 |
| Source | Work Type | Status | Applicant | Issued |
|---|---|---|---|---|
| DOB NOW | Mechanical Systems | Permit Issued | DONNELLY MECHANICAL CORP | 09/01/2026 |
| DOB NOW | Construction Fence | Permit Issued | DB ACE INC | 07/14/2026 |
| DOB NOW | Sprinklers | Permit Issued | AVON PLBG & HTG INC | 07/09/2026 |
| DOB NOW | Plumbing | Permit Issued | AVON PLBG & HTG INC | 07/09/2026 |
| DOB NOW | General Construction | Permit Issued | DB ACE INC | 07/01/2026 |
| DOB NOW | Mechanical Systems | Permit Issued | DB ACE INC | 07/01/2026 |
| DOB NOW | Structural | Signed-off | FALCON ENTERPRISES INC | 05/26/2026 |
| DOB NOW | Mechanical Systems | Signed-off | MECHANICAL EAST CO.,INC | 04/22/2026 |
| DOB NOW | Foundation | Signed-off | REMI INTERIORS INC | 04/07/2026 |
| DOB NOW | General Construction | Signed-off | TRU-ART SIGN CO.INC | 03/24/2026 |
| DOB NOW | Sign | Signed-off | TRU-ART SIGN CO. INC | 03/13/2026 |
| DOB NOW | Sign | Signed-off | TRU-ART SIGN CO. INC | 03/13/2026 |
| DOB NOW | Mechanical Systems | Signed-off | A.W. & S. CONSTRUCTION CO | 01/08/2026 |
| DOB NOW | General Construction | Signed-off | A.W. & S. CONSTRUCTION CO | 01/08/2026 |
| DOB NOW | Sprinklers | Signed-off | BEDROCK MECHANICAL INC | 12/31/2025 |
| DOB NOW | Plumbing | Signed-off | A&A PLUMBING CORP | 12/31/2025 |
| DOB NOW | General Construction | Permit Issued | REMI INTERIORS INC | 11/06/2025 |
| DOB NOW | Structural | Signed-off | REMI INTERIORS INC | 10/21/2025 |
| DOB NOW | Suspended Scaffold | Permit Issued | TRIBUTE RESTORATION INC | 10/02/2025 |
| DOB NOW | Suspended Scaffold | Permit Issued | JEPOL CONSTRUCTION INC | 09/22/2025 |
| DOB NOW | Plumbing | Signed-off | ALLSTATE SPRINKLER LLC | 07/01/2025 |
| DOB NOW | General Construction | Signed-off | TRIBUTE RESTORATION INC | 06/30/2025 |
| DOB NOW | Mechanical Systems | Signed-off | A.W. & S. CONSTRUCTION CO | 06/25/2025 |
| DOB NOW | General Construction | Signed-off | A.W. & S. CONSTRUCTION CO | 06/25/2025 |
| DOB NOW | Plumbing | Signed-off | J. CAIAZZO PLBG & HTG COR | 06/20/2025 |
| DOB NOW | General Construction | Signed-off | CONSTRUCTION MANAGEMENT & | 06/17/2025 |
| DOB NOW | Mechanical Systems | Signed-off | CONSTRUCTION MANAGEMENT & | 06/17/2025 |
| DOB NOW | Structural | Signed-off | CONSTRUCTION MANAGEMENT & | 06/13/2025 |
| DOB NOW | Plumbing | Signed-off | NYC FIRE SPRINKLER CORP | 06/03/2025 |
| DOB NOW | Plumbing | Signed-off | M&T PLBG AND HTG CO., INC | 05/30/2025 |
| DOB NOW | Sidewalk Shed | Signed-off | PLATINUM SERVICES NY LLC | 05/19/2025 |
| DOB NOW | General Construction | Signed-off | MC GOWAN BUILDERS INC | 05/14/2025 |
| DOB NOW | Mechanical Systems | Signed-off | MC GOWAN BUILDERS INC | 05/14/2025 |
| DOB NOW | Suspended Scaffold | Permit Issued | TRIBUTE RESTORATION INC | 04/25/2025 |
| DOB NOW | Structural | Signed-off | REMI INTERIORS INC | 03/25/2025 |
| DOB NOW | General Construction | Signed-off | REMI INTERIORS INC | 03/25/2025 |
| DOB NOW | General Construction | Signed-off | REMI INTERIORS INC | 03/20/2025 |
| DOB NOW | Supported Scaffold | Signed-off | TRIBUTE RESTORATION INC | 03/06/2025 |
| DOB NOW | Suspended Scaffold | Permit Issued | TRIBUTE RESTORATION INC | 03/06/2025 |
| DOB NOW | Sprinklers | Signed-off | A + SPRINKLER CORP | 01/30/2025 |
| Date | Type | Result | Report |
|---|---|---|---|
| 08/10/2026 | Certified Remove/Cap - work done in accordance with code | Certified | View ↗ |
| 08/06/2026 | Certified Water and Sanitary-WS-Sanitary Piping-Roughing | Certified | View ↗ |
| 08/06/2026 | Certified Water and Sanitary-WS-Sanitary Piping-Underground | Certified | View ↗ |
| 07/23/2026 | Certified Water and Sanitary-WS-Sanitary Piping-Roughing | Certified | View ↗ |
| 07/06/2026 | Pass-Final CND-Occupancy Inspection | Pass | View ↗ |
| 06/03/2026 | Pass-Final CND-Occupancy Inspection | Pass | View ↗ |
| 05/29/2026 | Pass-Final PL - Underground | Pass | View ↗ |
| 05/27/2026 | Fail-Final CND-Occupancy Inspection | Fail | View ↗ |
| 04/29/2026 | Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test | Certified | View ↗ |
| 03/24/2026 | Certified Remove/Cap - work done in accordance with code | Certified | View ↗ |
| 03/04/2026 | Certified Water and Sanitary-WS-Fixtures-Finish | Certified | View ↗ |
| 03/02/2026 | Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test | Certified | View ↗ |
| 12/02/2025 | Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test | Certified | View ↗ |
| 11/26/2025 | Certified Sprinkler-SP-Fixtures-Finish | Certified | View ↗ |
| 11/20/2025 | Certified Remove/Cap - work done in accordance with code | Certified | View ↗ |
| 11/20/2025 | Certified Water and Sanitary-WS-Fixtures-Finish | Certified | View ↗ |
| 10/07/2025 | Certified Remove/Cap - work done in accordance with code | Certified | View ↗ |
| 10/03/2025 | Certified Sprinkler-SP-Fixtures-Finish | Certified | View ↗ |
| 09/29/2025 | Certified Remove/Cap - work done in accordance with code | Certified | View ↗ |
| 09/29/2025 | Certified Water and Sanitary-WS-Fixtures-Finish | Certified | View ↗ |
| 09/25/2025 | Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test | Certified | View ↗ |
| 09/19/2025 | Certified Water and Sanitary-WS-Sanitary Piping-Roughing | Certified | View ↗ |
| 09/05/2025 | Pass-Final PL - Up to 3 Requested Floors | Pass | View ↗ |
| 09/02/2025 | Certified Water and Sanitary-WS-Sanitary Piping-Roughing | Certified | View ↗ |
| 08/15/2025 | Certified Water and Sanitary-WS-Sanitary Piping-Roughing | Certified | View ↗ |
| Date | Requirement | Inspector | Role |
|---|---|---|---|
| 08/17/2026 | HVAC-R and service water heating equipment | Obaid Mian | energy_progress |
| 08/17/2026 | Final | Obaid Mian | progress |
| 08/17/2026 | Mechanical Systems | Obaid Mian | special |
| 08/17/2026 | HVAC-R and service water heating system controls | Obaid Mian | energy_progress |
| 08/17/2026 | Maintenance information | Obaid Mian | energy_progress |
| 08/17/2026 | HVAC-R and service water piping design and insulation | Obaid Mian | energy_progress |
| 07/28/2026 | Sprinkler Systems | — | special |
| 06/15/2026 | Fire-Resistant Penetrations and Joints | Christopher Drutjons | special |
| 06/15/2026 | Fire-Resistance Rated Construction | Christopher Drutjons | progress |
| 06/15/2026 | Final | Thomas Lanzelotti | progress |
| 06/09/2026 | Final | Tae Chong | progress |
| 06/02/2026 | Fenestration air leakage | Tae Chong | energy_progress |
| 06/02/2026 | Interior lighting power | Tae Chong | energy_progress |
| 06/02/2026 | Fenestration areas | Tae Chong | energy_progress |
| 06/02/2026 | Fenestration and door U-factor and product ratings | Tae Chong | energy_progress |
| 06/02/2026 | Lighting controls | Tae Chong | energy_progress |
| 06/02/2026 | Sprinkler Systems | Tae Chong | special |
| 06/02/2026 | Fire-Resistant Penetrations and Joints | Tae Chong | special |
| 06/02/2026 | Fire-Resistant Penetrations and Joints | Tae Chong | special |
| 06/02/2026 | Energy Code Compliance Inspections | Tae Chong | progress |
| 06/02/2026 | HVAC-R and service water piping design and insulation | Tae Chong | energy_progress |
| 06/02/2026 | HVAC-R and service water heating system controls | Tae Chong | energy_progress |
| 06/02/2026 | Maintenance information | Tae Chong | energy_progress |
| 06/02/2026 | HVAC-R and service water heating equipment | Tae Chong | energy_progress |
| 06/02/2026 | Energy Code Compliance Inspections | Tae Chong | progress |