Two family converted from one family
320 16 STREET
BROOKLYN · BIN 3026839
💬 Discuss this project
1901Year Built
3Stories
B3Building Class
R5BZoning
1,728 sfGross Floor Area
2Units
Two family converted from one family · 1,600 sf lot · 1.08 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralElectricalMechanicalPlumbing
Roof4p · 1 filing · 14 docs
Floor 21p · 1 filing · 14 docs
Floor 13p · 3 filings · 20 docs
Cellar1p · 2 filings · 20 docs
Basement4p · 1 filing · 14 docs
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
DAVID CUNNINGHAM ARCHITECTURE PLANN702/16/2026
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
BMB BUILDING CONSULTING1403/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
PRO RENO NYC CORPGeneral Contractor504/09/2026
CL ELECTRICAL CORPElectrical103/22/2026
L&U HVAC CORPGeneral Contractor104/09/2026
VMC PLUMBING & HEATING INPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
DCAP PLLC8813602/16/2026
STUDIO NYANDAK ARCHITECTU8378202/16/2026
Building Lifecycle
All (52)Filed (7)Permit Issued (7)Signed Off (4)Inspection (4)Special Inspection (30)
03/20/2026
Signed off — Alteration
B01022978-I1
03/20/2026
Special inspection requirement — Fenestration and door U-factor and product ratings
David Cunningham
03/20/2026
Special inspection requirement — Final
David Cunningham
03/20/2026
Special inspection requirement — Structural Steel - High Strength Bolting
TENZIN NYANDAK
03/20/2026
Special inspection requirement — Structural Stability – Alterations of existing buildings
TENZIN NYANDAK
03/20/2026
Special inspection requirement — Structural Steel - Welding
TENZIN NYANDAK
03/20/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
David Cunningham
03/20/2026
Special inspection requirement — Structural Steel - Details
TENZIN NYANDAK
03/20/2026
Special inspection requirement — Post-installed Anchors
TENZIN NYANDAK
03/20/2026
Special inspection requirement — Energy Code Compliance Inspections
David Cunningham
03/20/2026
Special inspection requirement — Fenestration areas
David Cunningham
03/20/2026
Special inspection requirement — Interior lighting power
David Cunningham
02/26/2026
Signed off — Alteration
Renovation of two-family townhouse, including domestic water, sanitary waste piping work, and replacement of existing gas dryer as per plan in conjunction with Arch. design . No change to use, egress, and occupancy.
B01027582-I1
02/16/2026
Filed — Alteration
B01022978-P1
02/12/2026
Special inspection requirement — Fenestration and door U-factor and product ratings
David Cunningham
02/12/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
David Cunningham
02/12/2026
Special inspection requirement — Post-installed Anchors
TENZIN NYANDAK
02/12/2026
Special inspection requirement — Structural Stability – Alterations of existing buildings
TENZIN NYANDAK
02/12/2026
Special inspection requirement — Structural Steel - Details
TENZIN NYANDAK
02/12/2026
Special inspection requirement — Structural Steel - High Strength Bolting
TENZIN NYANDAK
02/12/2026
Special inspection requirement — Structural Steel - Welding
TENZIN NYANDAK
02/12/2026
Special inspection requirement — Energy Code Compliance Inspections
David Cunningham
02/12/2026
Special inspection requirement — Final
David Cunningham
02/12/2026
Special inspection requirement — Interior lighting power
David Cunningham
02/12/2026
Special inspection requirement — Fenestration areas
David Cunningham
02/04/2026
Signed off — Alteration
Installation of packaged terminal heat pump units on basement floor in conjunction with general construction as per plan. No change to use, egress, or occupancy under this application.
B01206996-I1
02/03/2026
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
02/03/2026
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
01/08/2026
Special inspection requirement — HVAC-R and service water heating equipment
David Cunningham
01/08/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
David Cunningham
01/08/2026
Special inspection requirement — Mechanical Systems
David Cunningham
01/08/2026
Special inspection requirement — Final
David Cunningham
01/08/2026
Special inspection requirement — Energy Code Compliance Inspections
David Cunningham
01/08/2026
Special inspection requirement — HVAC-R and service water heating system controls
David Cunningham
01/08/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
David Cunningham
12/16/2025
Filed — Alteration
Installation of packaged terminal heat pump units on basement floor in conjunction with general construction as per plan. No change to use, egress, or occupancy under this application.
B01206996-P1
12/15/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
David Cunningham
12/12/2025
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
11/14/2025
Signed off — Alteration
B01093463-I1
09/08/2025
Permit issued — Structural
B01022978-I1-GC
09/08/2025
Permit issued — General Construction
B01022978-I1-ST
07/02/2025
Filed — Alteration
Renovation of two-family townhouse, including domestic water, sanitary waste piping work, and replacement of existing gas dryer as per plan in conjunction with Arch. design . No change to use, egress, and occupancy.
B01027582-P1
07/02/2025
Permit issued — Mechanical Systems
B01206996-I1-MS
04/17/2025
Filed — Alteration
Installation of packaged terminal heat pump units on basement floor in conjunction with general construction as per plan. No change to use, egress, or occupancy under this application.
B01206996-I1
02/19/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
01/07/2025
Permit issued — Plumbing
B01027582-I1-PL
10/08/2024
Permit issued — Structural
B01022978-I1-GC
10/08/2024
Permit issued — General Construction
B01022978-I1-ST
10/04/2024
Permit issued — Construction Fence
B01093463-I1-FN
08/14/2024
Filed — Alteration
B01093463-I1
06/25/2024
Filed — Alteration
B01022978-I1
04/25/2024
Filed — Alteration
Renovation of two-family townhouse, including domestic water, sanitary waste piping work, and replacement of existing gas dryer as per plan in conjunction with Arch. design . No change to use, egress, and occupancy.
B01027582-I1
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWStructuralSigned-offPRO RENO NYC CORP09/08/2025
DOB NOWGeneral ConstructionSigned-offPRO RENO NYC CORP09/08/2025
DOB NOWMechanical SystemsSigned-offL&U HVAC CORP07/02/2025
DOB NOWPlumbingSigned-offM. SPINELLI PLB & HTG INC01/07/2025
DOB NOWStructuralSigned-offPRO RENO NYC CORP10/08/2024
DOB NOWGeneral ConstructionSigned-offPRO RENO NYC CORP10/08/2024
DOB NOWConstruction FenceSigned-offPRO RENO NYC CORP10/04/2024
BISOTISSUEDAMERICAN SOLAR PARTNERS,07/21/2017
1 project · most recent 12/25/2025
General Wiring
FiledStatusContractorScope
12/25/2025CompleteCL ELECTRICAL CORPGeneral Wiring
▾Field Inspections (DOB CAP) — 4
DateTypeResultReport
02/03/2026Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
02/03/2026Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
12/12/2025Pass-Final PL - Up to 3 Requested FloorsPassView ↗
02/19/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 38
DateRequirementInspectorRole
03/20/2026Fenestration and door U-factor and product ratingsDavid Cunninghamenergy_progress
03/20/2026FinalDavid Cunninghamprogress
03/20/2026Structural Steel - High Strength BoltingTENZIN NYANDAKspecial
03/20/2026Structural Stability – Alterations of existing buildingsTENZIN NYANDAKspecial
03/20/2026Structural Steel - WeldingTENZIN NYANDAKspecial
03/20/2026Fire-Resistant Penetrations and JointsDavid Cunninghamspecial
03/20/2026Structural Steel - DetailsTENZIN NYANDAKspecial
03/20/2026Post-installed AnchorsTENZIN NYANDAKspecial
03/20/2026Energy Code Compliance InspectionsDavid Cunninghamprogress
03/20/2026Fenestration areasDavid Cunninghamenergy_progress
03/20/2026Interior lighting powerDavid Cunninghamenergy_progress
02/12/2026Fenestration and door U-factor and product ratingsDavid Cunninghamenergy_progress
02/12/2026Fire-Resistant Penetrations and JointsDavid Cunninghamspecial
02/12/2026Post-installed AnchorsTENZIN NYANDAKspecial
02/12/2026Structural Stability – Alterations of existing buildingsTENZIN NYANDAKspecial
02/12/2026Structural Steel - DetailsTENZIN NYANDAKspecial
02/12/2026Structural Steel - High Strength BoltingTENZIN NYANDAKspecial
02/12/2026Structural Steel - WeldingTENZIN NYANDAKspecial
02/12/2026Energy Code Compliance InspectionsDavid Cunninghamprogress
02/12/2026FinalDavid Cunninghamprogress
02/12/2026Interior lighting powerDavid Cunninghamenergy_progress
02/12/2026Fenestration areasDavid Cunninghamenergy_progress
01/08/2026HVAC-R and service water heating equipmentDavid Cunninghamenergy_progress
01/08/2026Fire-Resistant Penetrations and JointsDavid Cunninghamspecial
01/08/2026Mechanical SystemsDavid Cunninghamspecial
Latest 25 of 38.
▾Documents — 76 on file (BIS + DOB NOW)
▸Plans & Drawings7
▸DOB NOWPlans/Sketch7
08/25/2026B01027582-P1Request digital key ↗
08/25/2026B01027582-I1Request digital key ↗
08/24/2026B01022978-P1Request digital key ↗
Showing 3 of 7 on file for this type
▸Applications & Permits5
▸BISPLAN / WORK APPROVAL APPLICATION4
06/26/2017340499428Open ↗
06/20/2017340458196Open ↗
04/25/2017340458196Open ↗
Showing 3 of 4 on file for this type
▸BISWORK PERMIT APPLICATION1
07/21/2017340499428Open ↗
▸Seals & Professional Certifications33
▸DOB NOWProgress Inspector Seal & Signature14
09/02/2026B01022978-P1Open ↗
09/02/2026B01022978-P1Open ↗
09/02/2026B01206996-P1Open ↗
Showing 3 of 14 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature10
09/02/2026B01022978-P1Open ↗
09/02/2026B01022978-P1Open ↗
09/02/2026B01206996-P1Open ↗
Showing 3 of 10 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature7
08/25/2026B01027582-I1Open ↗
08/24/2026B01022978-I1Open ↗
08/19/2026B01206996-I1Open ↗
Showing 3 of 7 on file for this type
▸BISAPPLICANT OWNER SIGNATURE2
06/26/2017340499428Open ↗
04/25/2017340458196Open ↗
▸Trade Schedules & Equipment2
▸BISFIRE PROTECTION PLAN(FPP): FDNY APPROVAL1
04/25/2017340458196Open ↗
▸BISFA - FDNY APPROVAL : FD-FAA1
06/26/2017340499428Open ↗
▸Safety & Tenant Protection2
▸BISTENANT PROTECTION PLAN AND NOTES2
06/26/2017340499428Open ↗
01/13/2017340458196Open ↗
▸Environmental & Asbestos8
▸DOB NOWDEP ACP-5: Asbestos Assessment Report6
08/25/2026B01027582-I1Open ↗
08/24/2026B01022978-I1Open ↗
08/19/2026B01206996-I1Open ↗
Showing 3 of 6 on file for this type
▸BISASBESTOS: CERTIFICATION (DEP ACP5)2
06/26/2017340499428Open ↗
01/13/2017340458196Open ↗
▸Energy Compliance7
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY3
12/15/2017340499428Open ↗
06/26/2017340499428Open ↗
01/13/2017340458196Open ↗
▸BISAS-BUILT ENERGY ANALYSIS1
12/22/2017340499428Open ↗
▸BISSOLAR TAX ABATEMENT APPLICATION1
04/25/2017340458196Open ↗
▸BISPTA4: SOLAR TAX ABATEMENT APPLICATION (PRELIMINARY)1
06/26/2017340499428Open ↗
▸BISPTA4: SOLAR TAX ABATEMENT APPLICATION (FINAL)1
12/15/2017340499428Open ↗
▸Inspections & Test Reports3
▸BISTECHNICAL REPORT: RESPONSIBILITY3
12/15/2017340499428Open ↗
06/26/2017340499428Open ↗
01/13/2017340458196Open ↗
▸Approvals, Objections & Sign-offs2
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST1
12/22/2017340499428Open ↗
▸BISUtility Company PV System Interconnection Acknowledgement Letter1
12/15/2017340499428Open ↗
▸Cost, Insurance & Ownership3
▸BISCOST AFFIDAVIT3
12/15/2017340499428Open ↗
06/26/2017340499428Open ↗
04/25/2017340458196Open ↗
▸Filing & Intake Forms4
▸BISEFILING JOB APPLICATION COVER SHEET2
06/26/2017340499428Open ↗
01/13/2017340458196Open ↗
▸BISADDITIONAL INFORMATION2
07/20/2017340499428Open ↗
04/25/2017340458196Open ↗