← Back
BuildNYC
Church, synagogue, chapel
Pentecostal Assembly Church
320 47TH STREET · Name © OpenStreetMap contributors · BIN 3012160
💬 Discuss this project
1905Year Built
1Stories
M1Building Class
R6BZoning
9,050 sfGross Floor Area
0Units
0 Active Violations 1 old, status unconfirmed ▸FDNY Report ↗
Church, synagogue, chapel · 8,013 sf lot · 1.13 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanicalEquipment
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
RoofPentecostal Assembly Church5p · 1 filing · 17 docs
Site & exteriorPentecostal Assembly Church9p · 3 filings · 7 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
Pentecostal Assembly607/08/2026
Iglesia Asamblea Church203/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Zenith Home Inspections110/02/2025
Always Fast Services209/24/2025
Peter Nyiam308/20/2025
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Franklyn Estrella Architect603/21/2026
Keystone Contracting203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Park Contracting GroupScaffold207/08/2026
Keystone ContractingGeneral Contractor107/08/2026
Next Solutions CityGeneral Contractor107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Mohammad Ahead - Professi9286110/02/2025
IP Concrete Testing and I6252211/02/2022
Building Lifecycle
All (29)Filed (6)Permit Issued (4)Signed Off (4)Violation (5)Special Inspection (10)
01/15/2026
Signed off — Alteration
B01292216-I1
01/15/2026
Signed off — Alteration
INSTALLATION OF TEMPORARY HEAVY DUTY SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF 2022 THE NYC BUILDING CODE. LIVE LOAD 300PSF.
B01273076-I1
12/03/2025
Signed off — Alteration
REPLACE THE EXISTING STUCCO AT FRONT FACADE APPROXIMATELY=350 SF
B01295836-I1
10/06/2025
Permit issued — General Construction
B01295836-I1-GC
10/02/2025
Filed — Alteration
REPLACE THE EXISTING STUCCO AT FRONT FACADE APPROXIMATELY=350 SF
B01295836-I1
09/24/2025
Filed — Alteration
B01292216-I1
09/24/2025
Permit issued — Supported Scaffold
B01292216-I1-SF
08/20/2025
Filed — Alteration
B01270123-I1
08/19/2025
Permit issued — Sidewalk Shed
B01273076-I1-SH
08/18/2025
Filed — Alteration
INSTALLATION OF TEMPORARY HEAVY DUTY SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF 2022 THE NYC BUILDING CODE. LIVE LOAD 300PSF.
B01273076-I1
08/11/2025
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
08/11/2025
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
08/11/2025
Violation issued (ECB, closed)
Construction
01/19/2023
Signed off — Alteration
APPLICATION FILED TO REPLACE EXISTING HVAC UNITS INSTALLED UNDER JOB NUMBER 301483446 AS PER PLANS FILED HERE WITH.
B08010251-I1
11/02/2022
Filed — Alteration
APPLICATION FILED TO REPLACE EXISTING HVAC UNITS INSTALLED UNDER JOB NUMBER 301483446 AS PER PLANS FILED HERE WITH.
B08010251-P2
11/02/2022
Special inspection requirement — Mechanical Systems
INDARDEO PARBHUNATH
11/02/2022
Special inspection requirement — Fire-Resistant Penetrations and Joints
INDARDEO PARBHUNATH
11/02/2022
Special inspection requirement — Energy Code Compliance Inspections
FRANKLYN ESTRELLA
11/02/2022
Special inspection requirement — Final
NAVEEN KUMAR
11/02/2022
Special inspection requirement — Duct leakage testing, insulation and design
FRANKLYN ESTRELLA
11/01/2022
Special inspection requirement — Fire-Resistant Penetrations and Joints
INDARDEO PARBHUNATH
11/01/2022
Special inspection requirement — Mechanical Systems
INDARDEO PARBHUNATH
11/01/2022
Special inspection requirement — Energy Code Compliance Inspections
FRANKLYN ESTRELLA
11/01/2022
Special inspection requirement — Final
NAVEEN KUMAR
11/01/2022
Special inspection requirement — Duct leakage testing, insulation and design
FRANKLYN ESTRELLA
10/14/2022
Permit issued — Mechanical Systems
B08010251-I1-MS
09/29/2022
Filed — Alteration
APPLICATION FILED TO REPLACE EXISTING HVAC UNITS INSTALLED UNDER JOB NUMBER 301483446 AS PER PLANS FILED HERE WITH.
B08010251-I1
04/05/2019
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
10/08/2010
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionSigned-offKeystone Contracting10/06/2025
DOB NOWSupported ScaffoldSigned-offPark Contracting Group09/24/2025
DOB NOWSidewalk ShedSigned-offPark Contracting Group08/19/2025
DOB NOWMechanical SystemsSigned-offNext Solutions City10/14/2022
BISMHISSUEDPeter Steven Quanci & Associates02/19/2003
BISFPISSUEDMaster Fire Systems12/28/2001
BISMHISSUEDNew Empire Constuction12/20/2001
1 project · most recent 08/20/2025
FiledStatusContractorScope
08/20/2025CompleteRichard Neu—
▾Special Inspection Requirements (DOB NOW) — 10
DateRequirementInspectorRole
11/02/2022Mechanical SystemsINDARDEO PARBHUNATHspecial
11/02/2022Fire-Resistant Penetrations and JointsINDARDEO PARBHUNATHspecial
11/02/2022Energy Code Compliance InspectionsFRANKLYN ESTRELLAprogress
11/02/2022FinalNAVEEN KUMARprogress
11/02/2022Duct leakage testing, insulation and designFRANKLYN ESTRELLAenergy_progress
11/01/2022Fire-Resistant Penetrations and JointsINDARDEO PARBHUNATHspecial
11/01/2022Mechanical SystemsINDARDEO PARBHUNATHspecial
11/01/2022Energy Code Compliance InspectionsFRANKLYN ESTRELLAprogress
11/01/2022FinalNAVEEN KUMARprogress
11/01/2022Duct leakage testing, insulation and designFRANKLYN ESTRELLAenergy_progress
▾Tenants in the building
TenantSpaceFloorsRenovation projects
Pentecostal Assembly ChurchReligiousEntire building
Project B01295836 Alteration · LOC Issued · 10/02/2025
Project B01292216 Alteration · LOC Issued · 09/24/2025
Project B01270123 Alteration · Filing Withdrawn · 08/20/2025
Project B01273076 Alteration · LOC Issued · 08/18/2025
Project B08010251 Alteration · LOC Issued · 09/29/2022
Names are taken automatically from the text of each project’s filed documents (title blocks and cover sheets) and screened to exclude owners, landlords and designers. They may be incomplete or wrong; check the filing.
▾Documents — 32 on file (BIS + DOB NOW)
▸Plans & Drawings6
▸DOB NOWPlans/Sketch6
08/28/2026B08010251-P2Request digital key ↗
08/28/2026B08010251-I1Request digital key ↗
08/20/2026B01273076-I1Request digital key ↗
Showing 3 of 6 on file for this type
▸Seals & Professional Certifications16
▸DOB NOWProgress Inspector Seal & Signature6
08/23/2026B08010251-I1Open ↗
08/23/2026B08010251-I1Open ↗
08/23/2026B08010251-I1Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature6
08/28/2026B08010251-P2Open ↗
08/28/2026B08010251-I1Open ↗
08/20/2026B01270123-I1Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature4
08/23/2026B08010251-I1Open ↗
08/23/2026B08010251-I1Open ↗
08/22/2026B08010251-P2Open ↗
Showing 3 of 4 on file for this type
▸Environmental & Asbestos3
▸DOB NOWDEP ACP-5: Asbestos Assessment Report3
08/28/2026B08010251-P2Open ↗
08/28/2026B08010251-I1Open ↗
08/13/2026B01295836-I1Open ↗
▸Energy Compliance1
▸DOB NOWPreliminary Commissioning Report Certification1
08/28/2026B08010251-I1Open ↗
▸Approvals, Objections & Sign-offs6
▸DOB NOWFee Exempt Supporting Document - DOF ACRIS report or BIB letter6
08/28/2026B08010251-I1Open ↗
08/28/2026B08010251-P2Open ↗
08/20/2026B01270123-I1Open ↗
Showing 3 of 6 on file for this type