← Back
Two family frame
320 BAY RIDGE PARKWAY
BROOKLYN · BIN 3148716
💬 Discuss this project
1910Year Built
3Stories
B2Building Class
R5BZoning
2,592 sfGross Floor Area
2Units
Two family frame · Owner of record: WONDER 320 LLC · 1,863 sf lot · 1.39 FAR built · Flood zone X
Locations of Work
ArchitectureMechanical
Floor 22p · 1 filing · 20 docs
Floor 12p · 1 filing · 20 docs
Cellar3p · 1 filing · 20 docs
Basement6p · 1 filing · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
T C DESIGN1504/09/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
02/12/2025$1.3M—— → —$502/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
NIC 88 CORP612/29/2025
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
NY BUILDING ASSOCIATES INGeneral Contractor104/09/2026
SAFEPIPE PLUMBING INCPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
NIC DESIGN INC9758612/29/2025
Building Lifecycle
All (45)Filed (6)Permit Issued (2)Signed Off (2)Inspection (5)Special Inspection (30)
02/19/2026
Signed off — Alteration
REMOVE & CAP OF EXISTING GAS & PLUMBING FIXTURE. INSTALLATION & REPLACEMENT OF NEW BOILER, H.W.H., GAS & PLUMBING FIXTURES IN EXISTING 2 STORY BUILDING. PLUMBING WORKS AS PER PLAN. NO CHANGE IN EGRESS, USE, OR OCCUPANCY.
B01186038-I1
02/19/2026
Signed off — Alteration
REMOVE & CAP OF EXISTING GAS & PLUMBING FIXTURE. INSTALLATION & REPLACEMENT OF NEW BOILER, H.W.H., GAS & PLUMBING FIXTURES IN EXISTING 2 STORY BUILDING. PLUMBING WORKS AS PER PLAN. NO CHANGE IN EGRESS, USE, OR OCCUPANCY.
B01186038-S1
12/30/2025
Special inspection requirement — Mechanical Systems
Eric Sun
12/30/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Eric Sun
12/30/2025
Special inspection requirement — Final
Eric Sun
12/30/2025
Special inspection requirement — Fire-Resistance Rated Construction
Eric Sun
12/30/2025
Special inspection requirement — Energy Code Compliance Inspections
Eric Sun
12/30/2025
Special inspection requirement — Insulation placement and R values
Eric Sun
12/30/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
Eric Sun
12/30/2025
Special inspection requirement — HVAC-R and service water heating equipment
Eric Sun
12/30/2025
Special inspection requirement — HVAC-R and service water heating system controls
Eric Sun
12/30/2025
Special inspection requirement — Fenestration and door U-factor and product ratings
Eric Sun
12/30/2025
Special inspection requirement — Fenestration areas
Eric Sun
12/30/2025
Special inspection requirement — Fenestration air leakage
Eric Sun
12/30/2025
Special inspection requirement — Interior lighting power
Eric Sun
12/30/2025
Special inspection requirement — Air barrier - visual inspection
Eric Sun
12/29/2025
Filed — Alteration
REMOVE & CAP OF EXISTING GAS & PLUMBING FIXTURE. INSTALLATION & REPLACEMENT OF NEW BOILER, H.W.H., GAS & PLUMBING FIXTURES IN EXISTING 2 STORY BUILDING. PLUMBING WORKS AS PER PLAN. NO CHANGE IN EGRESS, USE, OR OCCUPANCY.
B01186038-P4
12/29/2025
Special inspection requirement — Fenestration areas
Eric Sun
12/29/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Eric Sun
12/29/2025
Special inspection requirement — Mechanical Systems
Eric Sun
12/29/2025
Special inspection requirement — Chimneys and vents
12/29/2025
Special inspection requirement — Energy Code Compliance Inspections
Eric Sun
12/29/2025
Special inspection requirement — Final
Eric Sun
12/29/2025
Special inspection requirement — Fire-Resistance Rated Construction
Eric Sun
12/29/2025
Special inspection requirement — Air barrier - visual inspection
Eric Sun
12/29/2025
Special inspection requirement — Fenestration and door U-factor and product ratings
Eric Sun
12/29/2025
Special inspection requirement — HVAC-R and service water heating equipment
Eric Sun
12/29/2025
Special inspection requirement — Fenestration air leakage
Eric Sun
12/29/2025
Special inspection requirement — HVAC-R and service water heating system controls
Eric Sun
12/29/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
Eric Sun
12/29/2025
Special inspection requirement — Interior lighting power
Eric Sun
12/29/2025
Special inspection requirement — Insulation placement and R values
Eric Sun
12/24/2025
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
12/09/2025
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
12/04/2025
Filed — Alteration
REMOVE & CAP OF EXISTING GAS & PLUMBING FIXTURE. INSTALLATION & REPLACEMENT OF NEW BOILER, H.W.H., GAS & PLUMBING FIXTURES IN EXISTING 2 STORY BUILDING. PLUMBING WORKS AS PER PLAN. NO CHANGE IN EGRESS, USE, OR OCCUPANCY.
B01186038-P3
08/08/2025
Filed — Alteration
REMOVE & CAP OF EXISTING GAS & PLUMBING FIXTURE. INSTALLATION & REPLACEMENT OF NEW BOILER, H.W.H., GAS & PLUMBING FIXTURES IN EXISTING 2 STORY BUILDING. PLUMBING WORKS AS PER PLAN. NO CHANGE IN EGRESS, USE, OR OCCUPANCY.
B01186038-P2
08/08/2025
Filed — Alteration
REMOVE & CAP OF EXISTING GAS & PLUMBING FIXTURE. INSTALLATION & REPLACEMENT OF NEW BOILER, H.W.H., GAS & PLUMBING FIXTURES IN EXISTING 2 STORY BUILDING. PLUMBING WORKS AS PER PLAN. NO CHANGE IN EGRESS, USE, OR OCCUPANCY.
B01186038-P1
08/08/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Eric Sun
06/27/2025
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
06/27/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
06/05/2025
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
03/06/2025
Permit issued — General Construction
B01186038-I1-GC-CX
03/04/2025
Permit issued — Plumbing
B01186038-S1-PL
02/28/2025
Filed — Alteration
REMOVE & CAP OF EXISTING GAS & PLUMBING FIXTURE. INSTALLATION & REPLACEMENT OF NEW BOILER, H.W.H., GAS & PLUMBING FIXTURES IN EXISTING 2 STORY BUILDING. PLUMBING WORKS AS PER PLAN. NO CHANGE IN EGRESS, USE, OR OCCUPANCY.
B01186038-I1
02/28/2025
Filed — Alteration
REMOVE & CAP OF EXISTING GAS & PLUMBING FIXTURE. INSTALLATION & REPLACEMENT OF NEW BOILER, H.W.H., GAS & PLUMBING FIXTURES IN EXISTING 2 STORY BUILDING. PLUMBING WORKS AS PER PLAN. NO CHANGE IN EGRESS, USE, OR OCCUPANCY.
B01186038-S1
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionSigned-offNY BUILDING ASSOCIATES IN03/06/2025
DOB NOWPlumbingSigned-offBELLEROSE PLBG & HTG03/04/2025
1 project · most recent 04/21/2025
General Wiring
FiledStatusContractorScope
04/21/2025CompleteKJK ELECTRIC INCGeneral Wiring
▾Field Inspections (DOB CAP) — 5
DateTypeResultReport
12/24/2025Pass-Final PL - Up to 3 Requested FloorsPassView ↗
12/09/2025Pass-Final PL - Up to 3 Requested FloorsPassView ↗
06/27/2025Certified Gas-Gas-Piping-RoughingCertifiedView ↗
06/27/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
06/05/2025Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 45
DateRequirementInspectorRole
12/30/2025Mechanical SystemsEric Sunspecial
12/30/2025Fire-Resistant Penetrations and JointsEric Sunspecial
12/30/2025FinalEric Sunprogress
12/30/2025Fire-Resistance Rated ConstructionEric Sunprogress
12/30/2025Energy Code Compliance InspectionsEric Sunprogress
12/30/2025Insulation placement and R valuesEric Sunenergy_progress
12/30/2025HVAC-R and service water piping design and insulationEric Sunenergy_progress
12/30/2025HVAC-R and service water heating equipmentEric Sunenergy_progress
12/30/2025HVAC-R and service water heating system controlsEric Sunenergy_progress
12/30/2025Fenestration and door U-factor and product ratingsEric Sunenergy_progress
12/30/2025Fenestration areasEric Sunenergy_progress
12/30/2025Fenestration air leakageEric Sunenergy_progress
12/30/2025Interior lighting powerEric Sunenergy_progress
12/30/2025Air barrier - visual inspectionEric Sunenergy_progress
12/29/2025Fenestration areasEric Sunenergy_progress
12/29/2025Fire-Resistant Penetrations and JointsEric Sunspecial
12/29/2025Mechanical SystemsEric Sunspecial
12/29/2025Chimneys and vents—special
12/29/2025Energy Code Compliance InspectionsEric Sunprogress
12/29/2025FinalEric Sunprogress
12/29/2025Fire-Resistance Rated ConstructionEric Sunprogress
12/29/2025Air barrier - visual inspectionEric Sunenergy_progress
12/29/2025Fenestration and door U-factor and product ratingsEric Sunenergy_progress
12/29/2025HVAC-R and service water heating equipmentEric Sunenergy_progress
12/29/2025Fenestration air leakageEric Sunenergy_progress
Latest 25 of 45.
▾Documents — 29 on file (BIS + DOB NOW)
▸Plans & Drawings6
▸DOB NOWPlans/Sketch6
08/21/2026B01186038-P2Request digital key ↗
08/21/2026B01186038-P1Request digital key ↗
08/21/2026B01186038-S1Request digital key ↗
Showing 3 of 6 on file for this type
▸Seals & Professional Certifications17
▸DOB NOWProgress Inspector Seal & Signature7
09/25/2026B01186038-P2Open ↗
09/25/2026B01186038-P2Open ↗
08/29/2026B01186038-P4Open ↗
Showing 3 of 7 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature6
08/21/2026B01186038-P1Open ↗
08/21/2026B01186038-S1Open ↗
08/21/2026B01186038-I1Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature4
09/25/2026B01186038-P2Open ↗
08/29/2026B01186038-P4Open ↗
08/28/2026B01186038-P1Open ↗
Showing 3 of 4 on file for this type
▸Environmental & Asbestos6
▸DOB NOWDEP ACP-5: Asbestos Assessment Report6
08/21/2026B01186038-P1Open ↗
08/21/2026B01186038-S1Open ↗
08/21/2026B01186038-I1Open ↗
Showing 3 of 6 on file for this type