1959Year Built
6Stories
D4Building Class
R8Zoning
30,000 sfGross Floor Area
51Units
LL97 CoveredRent Stabilized2 Open Violations ▸FISP: SWARMP
Elevator cooperative · Owner of record: 320 EAST 35TH STREET · 7,453 sf lot · 4.03 FAR built · Flood zone X
Locations of Work
ArchitectureElectricalPlumbingEquipmentGeneral
Roof1p · 1 filing
Bulkhead1p · 1 filing · 4 docs
Cellar3p · 1 filing · 9 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
GURNOOR CONSTRUCTION404/09/2026
LAKHI GENERAL CONTRACTOR, INC604/09/2026
HKS CONSTRUCTION CORP503/22/2026
320 EAST 35TH STREET303/22/2026
REAL DEPENDABLE CONSTR CO303/22/2026
320 EAST 35 ST103/22/2026
CHARTER COMMUNICATIONS103/22/2026
PRIDE PROPERTY MANAGEMENT203/21/2026
320 EAST 35TH OWNERS803/21/2026
C O PRIDE PROPERTY MAN203/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
GTA ARCHITECTURE, PLLC202/24/2026
RIMKUS308/11/2025
MERRITT ENGINEERING CONSULTANTS, DPC103/25/2025
HAIDER ENGINEERING, P.E.106/17/2019
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
WSCONSULTANT & EXPEDITING SERVICES403/21/2026
S AND J ENGINEERS PLLC403/21/2026
MERRITT ENGINEERING CONSULTANT DPC203/21/2026
SNR EXPEDITING DESIGN203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
GURNOOR CONSTRUCTION CORPGeneral Contractor304/09/2026
HKS CONSTRUCTION CORPGeneral Contractor303/21/2026
ROBERT CHIMENTIElectrical103/22/2026
CHATEL CONSTRUCTION CORPGeneral Contractor104/09/2026
LAKHI GENERAL CONTRACTORGeneral Contractor104/09/2026
ARCO PLBG AND HTG INCPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
DEAN MENDEZ ARCHITECT, P.8621103/25/2025
MERRITT ENGINEERING CONSU460103/25/2025
Building Lifecycle
All (76)Filed (9)Permit Issued (7)Signed Off (4)Facade (FISP) (15)Violation (25)Inspection (4)Objection (4)Special Inspection (8)
07/28/2026
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
07/17/2026
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
07/15/2026
Signed off — Alteration
Interior renovation of existing unit LB which includes remove and replace non- bearing partitions, minor carpentry and mill work and plumbing work filed as per plans. No change in use egress or occupancy
M01350498-I1
07/09/2026
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
05/22/2026
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
04/29/2026
Permit issued — Plumbing
M01350498-S1-PL
03/20/2026
Permit issued — General Construction
M01350498-I1-GC
03/06/2026
Objection resolved — Addressed
03/05/2026
Cycle 10 facade report submitted
03/05/2026
Cycle 10 facade report signed — SAFE
03/05/2026
Objection raised — Scope
02/25/2026
Signed off — Alteration
INSTALLATION OF TEMPORARY ROOF PROTECTION AS PER DRAWINGS DURING FACADE RESTORATION, FILED ROOF PROTECTION SHALL COMPLY WITH CH #33 OF THE NYC BC. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
M01268690-I1
02/24/2026
Filed — Alteration
Interior renovation of existing unit LB which includes remove and replace non- bearing partitions, minor carpentry and mill work and plumbing work filed as per plans. No change in use egress or occupancy
M01350498-I1
02/24/2026
Filed — Alteration
Interior renovation of existing unit LB which includes remove and replace non- bearing partitions, minor carpentry and mill work and plumbing work filed as per plans. No change in use egress or occupancy
M01350498-S1
02/04/2026
Cycle 10 facade inspection completed
01/23/2026
Special inspection requirement — Energy Code Compliance Inspections
George Argiris
01/23/2026
Special inspection requirement — Lighting in dwelling units
George Argiris
01/22/2026
Special inspection requirement — Final
George Argiris
01/20/2026
Signed off — Alteration
PROPOSED INSTALLATION OF HEAVY DUTY SIDEWALK SHED AS PER PLANS. LIVE LOAD 300 LBS PER SQUARE FEET. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE. NO CHANGE IN USE, OCCUPANCY, OR EGRESS UNDER THIS APPLICATION.
M01222983-I1
01/14/2026
Signed off — Alteration
FACADE RESTORATION INCLUDING, BRICK REPLACEMENT, WINDOW SILL REPLACMENT, AC SLEEVE REPLACEMENT, CONCRETE PATCHING, STUCCO REPLACEMENT & FIRE ESCAPE MAINTENANCE REPAIRS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
M01196849-I1
10/10/2025
Objection resolved — Addressed
10/03/2025
Objection raised — Other
10/01/2025
Filed — Alteration
Suspended scaffold in order to perform exterior facade repairs and close-up inspections. Sidewalk shed filed under separate application. No change in use, occupancy or egress under this application.
M01222996-P1
08/12/2025
Permit issued — Protection and Mechanical Methods
M01268690-I1-PMM
08/11/2025
Filed — Alteration
INSTALLATION OF TEMPORARY ROOF PROTECTION AS PER DRAWINGS DURING FACADE RESTORATION, FILED ROOF PROTECTION SHALL COMPLY WITH CH #33 OF THE NYC BC. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
M01268690-I1
07/30/2025
Filed — Alteration
PROPOSED INSTALLATION OF HEAVY DUTY SIDEWALK SHED AS PER PLANS. LIVE LOAD 300 LBS PER SQUARE FEET. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE. NO CHANGE IN USE, OCCUPANCY, OR EGRESS UNDER THIS APPLICATION.
M01222983-P1
05/22/2025
Permit issued — General Construction
M01196849-I1-GC
05/14/2025
Permit issued — Suspended Scaffold
M01222996-I1-SC
05/09/2025
Filed — Alteration
PROPOSED INSTALLATION OF HEAVY DUTY SIDEWALK SHED AS PER PLANS. LIVE LOAD 300 LBS PER SQUARE FEET. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE. NO CHANGE IN USE, OCCUPANCY, OR EGRESS UNDER THIS APPLICATION.
M01222983-I1
05/09/2025
Permit issued — Sidewalk Shed
M01222983-I1-SH
05/08/2025
Filed — Alteration
Suspended scaffold in order to perform exterior facade repairs and close-up inspections. Sidewalk shed filed under separate application. No change in use, occupancy or egress under this application.
M01222996-I1
03/25/2025
Filed — Alteration
FACADE RESTORATION INCLUDING, BRICK REPLACEMENT, WINDOW SILL REPLACMENT, AC SLEEVE REPLACEMENT, CONCRETE PATCHING, STUCCO REPLACEMENT & FIRE ESCAPE MAINTENANCE REPAIRS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
M01196849-I1
03/18/2025
Special inspection requirement — Final
Christopher Krepcio
03/18/2025
Special inspection requirement — Energy Code Compliance Inspections
Christopher Krepcio
03/18/2025
Special inspection requirement — Air barrier - visual inspection
Christopher Krepcio
03/18/2025
Special inspection requirement — Masonry
Christopher Krepcio
03/18/2025
Special inspection requirement — Tenant Protection Plan Compliance
Dean Mendez
02/15/2023
Cycle 9 facade report submitted
02/13/2023
Cycle 9 facade report signed — SWARMP
02/10/2023
Cycle 9 facade inspection completed
04/01/2021
Violation issued (HPD, closed)
A
07/21/2020
Violation issued (ECB, closed)
Construction
01/22/2020
Violation issued (ECB, closed)
Cranes and Derricks
01/22/2020
Violation issued (ECB, closed)
Construction
01/22/2020
Violation issued (ECB, closed)
Construction
10/25/2019
Violation issued (HPD, closed)
I
09/06/2019
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
06/18/2019
Permit issued — Sidewalk Shed
M00179634-I1-SH
06/17/2019
Filed — Alteration
PROPOSED INSTALLATION OF HEAVY DUTY SIDEWALK SHED AS PER PLANS. LIVE LOAD 300 LBS PER SQUARE FEET. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE. NO CHANGE IN USE, OCCUPANCY, OR EGRESS UNDER THIS APPLICATION.
M00179634-I1
04/15/2019
Violation issued (ECB, closed)
Elevators
03/11/2019
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
03/21/2017
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
01/03/2017
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
08/18/2016
Cycle 8 facade report submitted
08/15/2016
Cycle 8 facade report signed — SWARMP
06/27/2016
Cycle 8 facade inspection completed
02/09/2015
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
02/03/2014
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
03/01/2013
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
01/26/2013
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
Latest 60 of 76 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingSigned-offARCO PLBG AND HTG INC04/29/2026
DOB NOWGeneral ConstructionSigned-offCHATEL CONSTRUCTION CORP03/20/2026
DOB NOWProtection and Mechanical MethodsSigned-offGURNOOR CONSTRUCTION08/12/2025
DOB NOWGeneral ConstructionSigned-offGURNOOR CONSTRUCTION05/22/2025
DOB NOWSuspended ScaffoldPermit IssuedLAKHI GENERAL CONTR INC05/14/2025
DOB NOWSidewalk ShedSigned-offLAKHI GENERAL CONTRACTOR05/09/2025
DOB NOWSidewalk ShedPermit IssuedHKS CONSTRUCTION CORP06/18/2019
BISOTISSUEDTMG CONSTRUCTION CORP08/12/2020
BISOTISSUEDTMG CONSTRUCTION CORP11/15/2019
BISOTISSUEDKAPLAN INTERIOR MILLWORK04/02/2018
BISPLISSUEDREEM PLBG & HTG CORP11/28/2017
BISOTISSUEDKAPLAN INTERIOR MILLWORK11/24/2017
BISEQISSUEDL & Z RESTORATION CORP12/24/2013
BISEQISSUEDL & Z RESTORATION CORP10/25/2013
BISOTISSUEDWOLF REST. INC.12/14/2004
BISEQRE-ISSUEDWOLF INSTALLATIONS12/06/2004
BISOTISSUEDWOLF REST. INC.09/27/2004
BISOTISSUEDRICHARDMORTMAN04/15/2004
BISPLISSUEDNAT'L MECH. SVCS PLBG LLC04/15/2004
BISBLISSUEDRICHARD MORTMAN03/25/2004
BISOTISSUEDSTEVE BELSITO & SONS INC06/21/1994
BISEQISSUEDGOLD SCAFFOLDING INC07/28/1993
1 project · most recent 02/24/2026
Gas Water/Sanitary
FiledStatusContractorScope
02/24/2026Signed-offARCO PLBG AND HTG INCGas, Water/Sanitary
7 projects · most recent 06/09/2026
General Wiring
FiledStatusContractorScope
06/09/2026CompleteTITANIUM ELECTRICAL CORP—
04/20/2026Permit Issued2AK LIGHT ELECTRIC CORPGeneral Wiring
02/24/2021Permit IssuedROBERT CHIMENTI36 meters, 1 new_meters
12/06/2019CompleteFSM ELECTRICAL CORPORATIOGeneral Wiring
10/18/2019Permit IssuedWCK ELECTRIC CORP.—
06/17/2019Permit IssuedRICHARD NEU—
02/02/2018CompleteKRIS ELECTRICAL SOLUTIONS—
1 project · most recent 06/17/2019
Sidewalk Shed
FiledStatusContractorScope
06/17/2019Permit IssuedHKS CONSTRUCTION CORPSidewalk Shed
1 project · most recent 02/24/2026
Tenant Protection Plan 72 Hour
FiledStatusContractorScope
02/24/2026Signed-offARCO PLBG AND HTG INCTenant Protection Plan 72 Hour
1 project · most recent 10/01/2025
Suspended Scaffold (SC)
FiledStatusContractorScope
10/01/2025Permit IssuedLAKHI GENERAL CONTR INCSuspended Scaffold (SC)
▾Field Inspections (DOB CAP) — 4
DateTypeResultReport
07/28/2026Pass-Final PL - Up to 3 Requested FloorsPassView ↗
07/17/2026Pass-Final PL - Up to 3 Requested FloorsPassView ↗
07/09/2026Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
05/22/2026Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 8
DateRequirementInspectorRole
01/23/2026Energy Code Compliance InspectionsGeorge Argirisprogress
01/23/2026Lighting in dwelling unitsGeorge Argirisenergy_progress
01/22/2026FinalGeorge Argirisprogress
03/18/2025FinalChristopher Krepcioprogress
03/18/2025Energy Code Compliance InspectionsChristopher Krepcioprogress
03/18/2025Air barrier - visual inspectionChristopher Krepcioenergy_progress
03/18/2025MasonryChristopher Krepciospecial
03/18/2025Tenant Protection Plan ComplianceDean Mendezspecial
▾Documents — 96 on file (BIS + DOB NOW)
▸Plans & Drawings7
▸DOB NOWPlans/Sketch6
08/23/2026M01222996-I1Request digital key ↗
08/23/2026M01222996-P1Request digital key ↗
08/23/2026M01222983-P1Request digital key ↗
Showing 3 of 6 on file for this type
▸DOB NOWPlans/Sketch - Sidewalk Shed1
09/05/2026M00179634-I1Request digital key ↗
▸Applications & Permits17
▸BISPLAN / WORK APPROVAL APPLICATION10
11/14/2019123697801Open ↗
07/03/2019123395487Open ↗
06/27/2019123395487Open ↗
Showing 3 of 10 on file for this type
▸BISWORK PERMIT APPLICATION7
11/18/2019123697801Open ↗
07/09/2019123395487Open ↗
04/09/2018122670644Open ↗
Showing 3 of 7 on file for this type
▸Seals & Professional Certifications26
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION5
11/15/2019123697801Open ↗
11/13/2019123697801Open ↗
02/07/2019122670644Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature5
08/13/2026M01350498-S1Open ↗
08/13/2026M01222983-P1Open ↗
08/13/2026M01350498-I1Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWProgress Inspector Seal & Signature5
09/29/2026M01196849-I1Open ↗
09/29/2026M01196849-I1Open ↗
08/28/2026M01350498-I1Open ↗
Showing 3 of 5 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT4
02/07/2019122670644Open ↗
07/23/2018123395487Open ↗
08/14/2017122670644Open ↗
Showing 3 of 4 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST3
07/11/2019122670644Open ↗
07/23/2018123395487Open ↗
08/14/2017122670644Open ↗
▸DOB NOWSpecial Inspector Seal & Signature2
09/29/2026M01196849-I1Open ↗
09/29/2026M01196849-I1Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY1
10/25/2013140128350Open ↗
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION1
10/25/2013140128350Open ↗
▸Trade Schedules & Equipment1
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE1
08/14/2017122670644Open ↗
▸Safety & Tenant Protection3
▸BISTenant Protection Plan and Notes3
11/13/2019123697801Open ↗
07/23/2018123395487Open ↗
08/14/2017122670644Open ↗
▸Environmental & Asbestos5
▸BISASBESTOS: CERTIFICATION (DEP ACP5)3
11/13/2019123697801Open ↗
07/23/2018123395487Open ↗
08/14/2017122670644Open ↗
▸DOB NOWDEP ACP-5: Asbestos Assessment Report2
08/13/2026M01350498-S1Open ↗
08/13/2026M01350498-I1Open ↗
▸Energy Compliance7
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS4
11/15/2019123697801Open ↗
11/13/2019123697801Open ↗
07/23/2018123395487Open ↗
Showing 3 of 4 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS (EN2)2
01/19/2023123395487Open ↗
09/09/2020123697801Open ↗
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY1
09/09/2020123697801Open ↗
▸Inspections & Test Reports3
▸BISTECHNICAL REPORT: RESPONSIBILITY2
09/09/2020123697801Open ↗
10/25/2013140128350Open ↗
▸BISMASONRY1
01/19/2023123395487Open ↗
▸Approvals, Objections & Sign-offs6
▸BISLETTERS - SUPPORTING DOCUMENTATION3
11/08/2019123697801Open ↗
11/08/2019123697801Open ↗
10/25/2013140128350Open ↗
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST1
09/09/2020123697801Open ↗
▸BISFINAL1
01/19/2023123395487Open ↗
▸BISSHED LETTER1
12/31/2013140128350Open ↗
▸Cost, Insurance & Ownership4
▸BISCOST AFFIDAVIT3
11/13/2019123697801Open ↗
07/23/2018123395487Open ↗
08/14/2017122670644Open ↗
▸BISCOST AFFIDAVIT (FINAL): PW31
09/09/2020123697801Open ↗
▸Filing & Intake Forms10
▸BISBOROUGH INTAKE FORM3
06/27/2019123395487Open ↗
08/09/2018122670644Open ↗
08/08/2018122670644Open ↗
▸BISEFILING COVER SHEET3
11/13/2019123697801Open ↗
07/23/2018123395487Open ↗
08/14/2017122670644Open ↗
▸BISADDITIONAL INFORMATION3
09/09/2020123697801Open ↗
08/05/2019122670644Open ↗
11/04/2013140128350Open ↗
▸BISEFILING JOB APPLICATION COVER SHEET1
10/25/2013140128350Open ↗
▸Other Documents7
▸DOB NOWCalculations2
08/13/2026M01222996-P1Open ↗
08/13/2026M01222996-I1Open ↗
▸DOB NOWManufacturer's Specifications2
08/13/2026M01222996-I1Open ↗
08/13/2026M01222996-P1Open ↗
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION1
08/08/2018122670644Open ↗
▸BISDHCR DOCUMENT1
07/11/2019122670644Open ↗
▸DOB NOWBSA Meeting Minutes/BSA Resolution1
08/13/2026M00179634-I1Open ↗