← Back
Office only, 7-19 stories
Ford Foundation Building
320 EAST 43 STREET · Murray Hill-Kips Bay · BIN 1038659
💬 Discuss this project
1967Year Built
11Stories
O3Building Class
C5-2Zoning
299,094 sfGross Floor Area
1Units
LL97 Covered1 Open Violation ▸FISP: SAFE
Office only, 7-19 stories · Owner of record: FORD FOUNDATION · 40,600 sf lot · 7.37 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralElectricalMechanicalFire Protection
Permit Issued — active, not yet Signed-off
Floor 91p · 1 filing · 15 docs
Floor 8
Floor 7
Floor 6
Floor 5
Floor 4
Floor 3
Floor 2
Floor 1Under Construction3 filings · 5 docs
Cellar1 filing
Sub-Cellar1 filing · 5 docs
Site & exterior5 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
FORD FOUNDATION12507/08/2026
DORIA407/08/2026
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
A1 EXPEDITING SERVICE CORP.903/21/2026
EUROCELT EXPEDITING, INC403/21/2026
A1 EXPEDITING SERVICE203/21/2026
WALTER T GORMAN PE203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
STRIANO ELECTRIC CO., INCElectrical403/22/2026
PLATFORM SOLUTIONS, INCGeneral Contractor407/08/2026
BENCHMARK BUILDERS LLCGeneral Contractor307/08/2026
PREFERRED SPKLR AND MECHFire Protection307/08/2026
SAFWAY ATLANTIC, LLCGeneral Contractor203/21/2026
PJP INSTALLERS INCGeneral Contractor203/21/2026
KOENIG IRON WORKS INCGeneral Contractor203/21/2026
SOUND REFRIGERATION & AIRGeneral Contractor107/08/2026
TRU-VAL ELECTRIC CORP.Electrical103/22/2026
DORIA, INCGeneral Contractor107/08/2026
PULLMAN SST INCGeneral Contractor107/08/2026
SOHO CONTRACTING CORPGeneral Contractor104/09/2026
JOSHUA ANDERSONElectrical103/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
LEVIN ENGINEERING PLLC1267105/29/2026
MILROSE CONSULTANTS LLC2003107/24/2025
AK ENGINEERING PC678603/07/2024
WALTER T. GORMAN, P.E., P268104/17/2023
ATLANTIC ENGINEERINGLABOR1381109/04/2019
Building Lifecycle
All (147)Filed (16)Permit Issued (14)Signed Off (12)Facade (FISP) (15)Violation (60)Inspection (8)Special Inspection (22)
07/24/2026
Inspection — Certified Sprinkler-SP-Fixtures-Finish
Certified
View inspection ↗
07/21/2026
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
06/18/2026
Signed off — Alteration
M01238759-I1
06/04/2026
Permit issued — Sprinklers
M01394765-I1-EW-SP
05/29/2026
Filed — Alteration
EXISTING 4" PIPE CONNECTION FOR EXISTING SPRINKLER DRY VALVE TO BE RELOCATED FROM THE SUCTION SIDE OF THE FIRE PUMP TO THE DISCHARGE SIDE WITH NEW 4" CONNECTION AS PER PLANS SHOWNED.
M01394765-I1
04/29/2026
Special inspection requirement — Sprinkler Systems
Dmitry Levin
04/29/2026
Special inspection requirement — Post-installed Anchors
Dmitry Levin
08/04/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
08/04/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
07/28/2025
Permit issued — General Construction
M01238759-I1-GC
07/24/2025
Filed — Alteration
M01238759-I1
12/01/2024
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
06/10/2024
Signed off — Alteration
INSTALLATION OF TEMPORARY SCAFFOLD AS PER PLANS DURING GENERAL CONSTRUCTION WORK. NO CHANGE IN USE, EGRESS OR OCCUPANCY. SCAFFOLD TO COMPLY WITH CHAPTER 33 OF NYC BUILDING CODE OF 2022.
M00910558-I1
06/10/2024
Signed off — Alteration
INSTALLATION OF TEMPORARY PLYWOOD ENCLOSURE AS PER PLANS DURING GENERAL CONSTRUCTION WORK. NO CHANGE IN USE, EGRESS OR OCCUPANCY. ENCLOSURE TO COMPLY WITH CHAPTER 33 OF NYC BUILDING CODE.
M00904590-I1
05/06/2024
Signed off — Alteration
Structural modifications in the atrium/garden as per plans filed herewith. No change in use, egress or occupancy.
M00874609-I1
05/03/2024
Signed off — Alteration
Removal and installation of stone cladding in the atrium/garden as per plans filed herewith. No change in use, egress or occupancy.
M00874565-I1
04/12/2024
Special inspection requirement — Structural Steel - Details
Ari Kamo
04/12/2024
Special inspection requirement — Final
Ari Kamo
04/12/2024
Special inspection requirement — Structural Steel - Welding
Ari Kamo
04/12/2024
Special inspection requirement — Post-installed Anchors
Ari Kamo
03/11/2024
Special inspection requirement — Structural Stability – Alterations of existing buildings
Ari Kamo
03/11/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
Ari Kamo
03/11/2024
Special inspection requirement — Post-installed Anchors
Ari Kamo
03/11/2024
Special inspection requirement — Final
Domingo Diaz
03/07/2024
Filed — Alteration
Structural modifications in the atrium/garden as per plans filed herewith. No change in use, egress or occupancy.
M00874609-P1
03/06/2024
Signed off — Alteration
SCAFFOLD TO ACCESS WORK.NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
M00604042-I1
03/06/2024
Signed off — Alteration
INSTALLATION OF TEMPORARY SUSPENDED SCAFFOLDS AND MATERIAL HOISTS PER PLAN SUBMITTED. WORK SHALL COMPLY WITH 2022 BUILDING CODE CHAPTER 33. NO CHANGE IN USE, EGRESS AND/OR OCCUPANCY WITH THIS APPLICATION.
M00909081-I1
03/06/2024
Filed — Alteration
Removal and installation of stone cladding in the atrium/garden as per plans filed herewith. No change in use, egress or occupancy.
M00874565-P1
01/24/2024
Signed off — Alteration
Replacement of vertical hot water pipe in the atrium/garden as per plans filed herewith. No change in use, egress or occupancy.
M00874593-I1
12/19/2023
Special inspection requirement — Mechanical Systems
Ari Kamo
12/19/2023
Special inspection requirement — Final
Ari Kamo
12/19/2023
Special inspection requirement — HVAC-R and service water piping design and insulation
Ari Kamo
12/18/2023
Filed — Alteration
Replacement of vertical hot water pipe in the atrium/garden as per plans filed herewith. No change in use, egress or occupancy.
M00874593-P1
12/13/2023
Special inspection requirement — Post-installed Anchors
Ari Kamo
12/01/2023
Special inspection requirement — Final
Ari Kamo
12/01/2023
Special inspection requirement — Structural Steel - Welding
Ari Kamo
12/01/2023
Special inspection requirement — Structural Steel - Details
Ari Kamo
08/25/2023
Cycle 9 facade report submitted
08/24/2023
Cycle 9 facade report signed — SAFE
08/15/2023
Cycle 9 facade inspection completed
08/02/2023
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
07/27/2023
Filed — Alteration
INSTALLATION OF TEMPORARY SCAFFOLD AS PER PLANS DURING GENERAL CONSTRUCTION WORK. NO CHANGE IN USE, EGRESS OR OCCUPANCY. SCAFFOLD TO COMPLY WITH CHAPTER 33 OF NYC BUILDING CODE OF 2022.
M00910558-I1
07/27/2023
Permit issued — Supported Scaffold
M00910558-I1-SF
07/25/2023
Filed — Alteration
INSTALLATION OF TEMPORARY SUSPENDED SCAFFOLDS AND MATERIAL HOISTS PER PLAN SUBMITTED. WORK SHALL COMPLY WITH 2022 BUILDING CODE CHAPTER 33. NO CHANGE IN USE, EGRESS AND/OR OCCUPANCY WITH THIS APPLICATION.
M00909081-I1
07/25/2023
Permit issued — Protection and Mechanical Methods
M00909081-I1-PMM
07/19/2023
Permit issued — Mechanical Systems
M00874593-I1-MS
07/18/2023
Signed off — Alteration
Propose to install new piping for combined sprinkler/standpipe project. No change to use, egress or occupancy.
M00847317-I1
07/15/2023
Permit issued — Protection and Mechanical Methods
M00904590-I1-PMM
07/14/2023
Filed — Alteration
INSTALLATION OF TEMPORARY PLYWOOD ENCLOSURE AS PER PLANS DURING GENERAL CONSTRUCTION WORK. NO CHANGE IN USE, EGRESS OR OCCUPANCY. ENCLOSURE TO COMPLY WITH CHAPTER 33 OF NYC BUILDING CODE.
M00904590-I1
07/05/2023
Permit issued — Structural
M00874609-I1-ST
06/22/2023
Filed — Alteration
Structural modifications in the atrium/garden as per plans filed herewith. No change in use, egress or occupancy.
M00874609-I1
06/15/2023
Permit issued — General Construction
M00874565-I1-GC
06/15/2023
Inspection — Certified Sprinkler-SP-Fixtures-Finish
Certified
View inspection ↗
06/15/2023
Inspection — Certified StandPipe-SD-Fixtures-Finish-SD
Certified
View inspection ↗
06/14/2023
Filed — Alteration
Replacement of vertical hot water pipe in the atrium/garden as per plans filed herewith. No change in use, egress or occupancy.
M00874593-I1
06/13/2023
Filed — Alteration
Removal and installation of stone cladding in the atrium/garden as per plans filed herewith. No change in use, egress or occupancy.
M00874565-I1
06/08/2023
Signed off — Alteration
M00754136-I1
06/07/2023
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
06/07/2023
Inspection — Certified StandPipe-SD-Piping-Hydrostatic Test
Certified
View inspection ↗
05/02/2023
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
Latest 60 of 147 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSprinklersPermit IssuedPREFERRED SPKLR AND MECH06/04/2026
DOB NOWGeneral ConstructionSigned-offSOHO CONTRACTING CORP07/28/2025
DOB NOWSupported ScaffoldSigned-offPLATFORM SOLUTIONS, INC07/27/2023
DOB NOWProtection and Mechanical MethodsSigned-offDORIA, INC07/25/2023
DOB NOWMechanical SystemsSigned-offSOUND REFRIGERATION & AIR07/19/2023
DOB NOWProtection and Mechanical MethodsSigned-offPLATFORM SOLUTIONS, INC07/15/2023
DOB NOWStructuralSigned-offBENCHMARK BUILDERS LLC07/05/2023
DOB NOWGeneral ConstructionSigned-offBENCHMARK BUILDERS LLC06/15/2023
DOB NOWStandpipeSigned-offPREFERRED SPKLR AND MECH04/19/2023
DOB NOWSprinklersSigned-offPREFERRED SPKLR AND MECH04/19/2023
DOB NOWGeneral ConstructionSigned-offPULLMAN SST INC07/12/2022
DOB NOWSupported ScaffoldSigned-offPJP INSTALLERS INC10/07/2021
DOB NOWStructuralSigned-offKOENIG IRON WORKS INC11/06/2019
DOB NOWSupported ScaffoldSigned-offSAFWAY ATLANTIC, LLC01/03/2019
BISOTISSUEDWESTERN WATERPROOFING COM10/21/2019
BISEQISSUEDSAFWAY ATLANTIC, LLC04/11/2019
BISOTISSUEDHENEGAN CONSTRUCTION CO.,09/05/2018
BISOTISSUEDHENEGAN CONSTRUCTION CO.,08/07/2018
BISMHISSUEDHENEGAN CONSTRUCTION CO.,08/07/2018
BISOTISSUEDHENEGAN CONSTRUCTION CO.,08/07/2018
BISOTISSUEDHENEGAN CONSTRUCTION CO.,08/07/2018
BISOTISSUEDHENEGAN CONSTRUCTION CO.,08/07/2018
BISMHISSUEDHENEGAN CONSTRUCTION CO.,08/07/2018
BISOTISSUEDHENEGAN CONSTRUCTION CO.,08/07/2018
BISOTISSUEDHENEGAN CONSTRUCTION CO.,08/07/2018
BISOTISSUEDHENEGAN CONSTRUCTION CO.,08/07/2018
BISOTISSUEDHENEGAN CONSTRUCTION CO.,08/07/2018
BISMHISSUEDHENEGAN CONSTRUCTION CO.,08/07/2018
BISOTISSUEDHENEGAN CONSTRUCTION CO.,08/07/2018
BIS—ISSUEDHENEGAN CONSTRUCTION CO.,08/07/2018
BISMHISSUEDHENEGAN CONSTRUCTION CO.,08/07/2018
BISFPISSUEDFIREMASTERS07/31/2018
BISPLISSUEDPREFERRED MECHANICAL INC07/02/2018
BISEQISSUEDSAFWAY ATLANTIC, LLC07/02/2018
BISEQISSUEDSAFWAY ATLANTIC, LLC07/02/2018
BISFPISSUEDFIREMASTERS06/04/2018
BISOTISSUEDHENEGAN CONSTRUCTION CO.,05/31/2018
BISEQISSUEDSAFWAY ATLANTIC, LLC05/23/2018
BISOTISSUEDHENEGAN CONSTRUCTION CO.,05/15/2018
BISFSISSUEDDOUGLAS SIMMONS05/08/2018
+ 24 more permits on file
1 project · most recent 05/29/2026
FiledStatusContractorScope
05/29/2026Permit IssuedPREFERRED SPKLR AND MECH—
11 projects · most recent 03/01/2024
HVAC Wiring General Wiring
FiledStatusContractorScope
03/01/2024CompleteSTRIANO ELECTRIC CO., INC—
07/19/2023Permit IssuedSTANCO SYSTEM ELEC'L CONT—
11/29/2021Permit IssuedTRU-VAL ELECTRIC CORP.HVAC Wiring
06/12/2020CompleteSTRIANO ELECTRIC CO., INC2 meters, 1 new_meters
12/19/2019CompleteSTRIANO ELECTRIC CO., INCGeneral Wiring
08/28/2019CompleteSTRIANO ELECTRIC CO., INC—
08/12/2019CompleteSTRIANO ELECTRIC CO., INC—
08/08/2019CompleteSTRIANO ELECTRIC CO., INC—
08/05/2019CompleteSTRIANO ELECTRIC CO., INC—
03/01/2019CompleteSTRIANO ELECTRIC CO., INC1 meters
10/17/2018CompleteALL CITY ELECTRICAL INC—
▾Field Inspections (DOB CAP) — 8
DateTypeResultReport
07/24/2026Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
07/21/2026Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
08/04/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
08/04/2025Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
06/15/2023Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
06/15/2023Certified StandPipe-SD-Fixtures-Finish-SDCertifiedView ↗
06/07/2023Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
06/07/2023Certified StandPipe-SD-Piping-Hydrostatic TestCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 22
DateRequirementInspectorRole
04/29/2026Sprinkler SystemsDmitry Levinspecial
04/29/2026Post-installed AnchorsDmitry Levinspecial
04/12/2024Structural Steel - DetailsAri Kamospecial
04/12/2024FinalAri Kamoprogress
04/12/2024Structural Steel - WeldingAri Kamospecial
04/12/2024Post-installed AnchorsAri Kamospecial
03/11/2024Structural Stability – Alterations of existing buildingsAri Kamospecial
03/11/2024Fire-Resistant Penetrations and JointsAri Kamospecial
03/11/2024Post-installed AnchorsAri Kamospecial
03/11/2024FinalDomingo Diazprogress
12/19/2023Mechanical SystemsAri Kamospecial
12/19/2023FinalAri Kamoprogress
12/19/2023HVAC-R and service water piping design and insulationAri Kamoenergy_progress
12/13/2023Post-installed AnchorsAri Kamospecial
12/01/2023FinalAri Kamoprogress
12/01/2023Structural Steel - WeldingAri Kamospecial
12/01/2023Structural Steel - DetailsAri Kamospecial
04/11/2023Post-installed AnchorsWalter Gormanspecial
04/11/2023Fire-Resistant Penetrations and JointsWalter Gormanspecial
03/21/2023Standpipe SystemsWalter Gormanspecial
03/21/2023Sprinkler SystemsWalter Gormanspecial
12/28/2018FinalTANYA CHARLESWORTHprogress
▾Documents — 1,189 on file (BIS + DOB NOW)
▸Plans & Drawings16
▸DOB NOWPlans/Sketch14
09/03/2026M00604042-I1Request digital key ↗
09/02/2026M00754136-I1Request digital key ↗
08/31/2026M00847317-I1Request digital key ↗
Showing 3 of 14 on file for this type
▸DOB NOWPlans/Sketch - Structural1
09/05/2026M00195846-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Supported Scaffold1
09/05/2026M00114210-I1Request digital key ↗
▸Applications & Permits214
▸BISPLAN / WORK APPROVAL APPLICATION120
12/30/2020122813848Open ↗
12/03/2019122813848Open ↗
10/02/2019123024379Open ↗
Showing 3 of 120 on file for this type
▸BISWORK PERMIT APPLICATION60
10/22/2019123800244Open ↗
09/16/2019123800244Open ↗
Showing 2 of 60 on file for this type
▸BISPLACE OF ASSEMBLY23
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 23 on file for this type
▸DOB NOWLPC Approval/Permit9
08/13/2026M00874609-I1Open ↗
08/13/2026M00754136-I1Open ↗
08/13/2026M00195846-I1Open ↗
Showing 3 of 9 on file for this type
▸BISPLACE OF ASSEMBLY (PA) SIGNOFF1
03/02/2021122813848Open ↗
▸BISCERTIFICATE OF OCCUPANCY: APPLICATION1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Seals & Professional Certifications290
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION175
03/25/2020123800244Open ↗
03/25/2020123800244Open ↗
03/25/2020123800244Open ↗
Showing 3 of 175 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT38
08/15/2019123800244Open ↗
Showing 1 of 38 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST33
08/15/2019123800244Open ↗
Showing 1 of 33 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature16
09/05/2026M00114210-I1Open ↗
08/30/2026M00874593-P1Open ↗
08/30/2026M00874593-I1Open ↗
Showing 3 of 16 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature9
09/29/2026M01394765-I1Open ↗
09/01/2026M00874593-I1Open ↗
08/29/2026M00874565-I1Open ↗
Showing 3 of 9 on file for this type
▸DOB NOWProgress Inspector Seal & Signature6
09/01/2026M00874593-I1Open ↗
09/01/2026M00874593-I1Open ↗
08/29/2026M00874565-I1Open ↗
Showing 3 of 6 on file for this type
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY5
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 5 on file for this type
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION5
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 5 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸Trade Schedules & Equipment62
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE26
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 26 on file for this type
▸BISEQUIPMENT USE PERMITS13
11/22/2019122886813Open ↗
11/22/2019122886813Open ↗
11/22/2019122886813Open ↗
Showing 3 of 13 on file for this type
▸BISFA - FDNY APPROVAL : FD-FAA8
06/26/2020123024379Open ↗
01/24/2020123828331Open ↗
01/24/2020123828340Open ↗
Showing 3 of 8 on file for this type
▸BISEQUIPMENT USE APPLICATION/PERMIT6
11/22/2019122886813Open ↗
11/22/2019122886813Open ↗
11/22/2019122886813Open ↗
Showing 3 of 6 on file for this type
▸BISSCHEDULE B - PLUMBING3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸BISSELF-CERT PLUMBING NOTICE3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸BISSCHEDULE C - HEATING & COMBUSTION EQUIPMENT2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISFIRE PROTECTION PLAN(FPP): FDNY APPROVAL1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Safety & Tenant Protection7
▸BISSTREET TREE CHECKLIST3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸BISTENANT PROTECTION PLAN AND NOTES2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISST-1 Street Tree Checklist1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISDEMOLITION SUBMITTAL CERTIFICATION FORM1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Environmental & Asbestos74
▸BISASBESTOS: COMPLETION OR CLOSEOUT (ACP20/21/5)31
06/29/2020123024379Open ↗
10/28/2019122880267Open ↗
10/28/2019122880267Open ↗
Showing 3 of 31 on file for this type
▸BISASBESTOS: CERTIFICATION (DEP ACP5)25
10/28/2019122880267Open ↗
10/28/2019122880267Open ↗
10/28/2019122880267Open ↗
Showing 3 of 25 on file for this type
▸DOB NOWDEP ACP-5: Asbestos Assessment Report11
08/30/2026M00874593-P1Open ↗
08/30/2026M00874593-I1Open ↗
08/30/2026M00874609-I1Open ↗
Showing 3 of 11 on file for this type
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'6
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 6 on file for this type
▸BISASBESTOS EXEMPTION CERTIFICATION LETTER1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Energy Compliance26
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS19
11/01/2019122886813Open ↗
11/01/2019122886813Open ↗
08/28/2019122637842Open ↗
Showing 3 of 19 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS6
11/25/2019122945322Open ↗
11/01/2019122886813Open ↗
08/28/2019122637842Open ↗
Showing 3 of 6 on file for this type
▸BISTR8: Energy Code Progress Inspections1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Inspections & Test Reports25
▸BISINSPECTION REPORT - SUPPORTING DOCUMENTATION8
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 8 on file for this type
▸BISTECHNICAL REPORT: CONCRETE/TEST CYLINDER7
11/30/2020122886813Open ↗
11/01/2019122886813Open ↗
10/15/2019123057388Open ↗
Showing 3 of 7 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY6
05/07/2020123800244Open ↗
05/07/2020123800244Open ↗
Showing 2 of 6 on file for this type
▸BISTECHNICAL REPORT: CONCRETE DESIGN MIX2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISTECHNICAL REPORT: PILE DRIVING1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISHYDRAULIC FLOW CALCULATIONS1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Approvals, Objections & Sign-offs135
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST65
03/02/2021122813848Open ↗
12/01/2020122813848Open ↗
06/29/2020123024379Open ↗
Showing 3 of 65 on file for this type
▸BISLANDMARKS APPROVAL28
11/01/2019122886813Open ↗
10/17/2019122880267Open ↗
10/15/2019123057388Open ↗
Showing 3 of 28 on file for this type
▸DOB NOWFee Exempt Supporting Document - DOF ACRIS report or BIB letter14
09/05/2026M00114210-I1Open ↗
08/22/2026M01238759-I1Open ↗
08/17/2026M01394765-I1Open ↗
Showing 3 of 14 on file for this type
▸BISSCHEDULE A - OCCUPANCY / USE9
12/03/2019122813848Open ↗
Showing 1 of 9 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION8
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 8 on file for this type
▸BISADMINISTRATIVE OBJECTIONS8
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 8 on file for this type
▸BISLANDMARKS SIGNOFF2
03/02/2021122813848Open ↗
06/29/2020123024379Open ↗
▸BISSUPERSEDING LETTER1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Cost, Insurance & Ownership72
▸BISCOST AFFIDAVIT70
05/07/2020123800244Open ↗
03/25/2020123800244Open ↗
01/24/2020123828331Open ↗
Showing 3 of 70 on file for this type
▸BISCOST AFFIDAVIT (FINAL): PW32
03/02/2021122813848Open ↗
06/29/2020123024379Open ↗
▸Filing & Intake Forms205
▸BISBOROUGH INTAKE FORM86
03/25/2020123800244Open ↗
01/24/2020123828331Open ↗
01/24/2020123828340Open ↗
Showing 3 of 86 on file for this type
▸BISADDITIONAL INFORMATION67
01/08/2021122813848Open ↗
02/26/2020121237740Open ↗
09/10/2019121237740Open ↗
Showing 3 of 67 on file for this type
▸BISEFILING COVER SHEET47
08/15/2019123800244Open ↗
Showing 1 of 47 on file for this type
▸BISEFILING JOB APPLICATION COVER SHEET5
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 5 on file for this type
▸Other Documents53
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION40
11/01/2019122886813Open ↗
11/01/2019122886813Open ↗
11/01/2019122886813Open ↗
Showing 3 of 40 on file for this type
▸BISSupporting Document: Fee Exempt4
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 4 on file for this type
▸BISSupporting Document: Fee Deferment3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸BISTax Abatement Miscellaneous3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸BISPHOTOLUMINESCENT EXIT PATH MARKINGS2
11/01/2019122886813Open ↗
10/15/2019123057388Open ↗
▸DOB NOWProof of Historic Building1