Condo, residential unit in elevator building
320 EAST 54 STREET
MANHATTAN · East Midtown-Turtle Bay · BIN 1039848
💬 Discuss this project
1959Year Built
12Stories
R4Building Class
R8BZoning
61,630 sfGross Floor Area
90Units
LL97 CoveredRent Stabilized32 Open Violations 31 unresolved · 1 paperwork only ▸FISP: SWARMP
Condo, residential unit in elevator building · Owner of record: 320 EAST 54TH ST CONDO · 9,673 sf lot · 6.37 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralElectricalMechanicalPlumbingEquipmentGeneral
Permit Issued — active, not yet Signed-off
Roof5p · 2 filings · 9 docs
Bulkhead1p · 1 filing · 7 docs
Floor 111p · 1 filing · 7 docs
Floor 10
Floor 9
Floor 8
Floor 7Under Construction19p · 1 filing · 20 docs
Floor 6
Floor 5
Floor 4
Floor 3
Floor 2
Floor 1
Site & exterior15p · 3 filings · 13 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
320 EAST 54TH ST CONDO903/22/2026
320 E 54ST CONDO/ COOPER103/22/2026
EQUITY MGMT. GROUP INC203/22/2026
OWNER OF PREMISES503/22/2026
OWNER OF 318 E.54 ST.203/22/2026
TERRIS REALTY503/22/2026
320 E, 54 STREET CONDO, C/O503/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
NOT APPLICABLE708/01/2026
PAUL PERDEK, PROF. ENG. PLLC310/10/2022
PARADIGM ARCHITECTURE106/06/2022
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
AE DESIGN SOLUTION603/21/2026
MUNICIPAL BUILDING CONSULTANTS103/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
EMPIRE NY INSTALLATIONS INCGeneral Contractor807/08/2026
DEMARI SERVICES INCGeneral Contractor307/08/2026
UPPER RESTORATION INCGeneral Contractor204/09/2026
OMD ELECTRICAL CORPElectrical103/22/2026
AVELLINO, LOUISElectrical103/21/2026
JOHN FITZGERALD PLBG &HTGPlumbing107/08/2026
AXCEL ELECTRIC CO., INC.Electrical103/22/2026
DICKSON, CHARDElectrical103/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
PARADIGM ARCHITECTURE5931106/06/2022
Building Lifecycle
All (104)Filed (11)Permit Issued (9)Signed Off (1)Facade (FISP) (12)Violation (60)Inspection (3)Special Inspection (8)
08/01/2026
Filed — Alteration
Renovation of existing apartments 7F and 7G. Remove and construct partitions and flooring. Remove and install plumbing fixtures as per plans. No change to use, egress or occupancy.
M01294027-P5
07/31/2026
Filed — Alteration
Renovation of existing apartments 7F and 7G. Remove and construct partitions and flooring. Remove and install plumbing fixtures as per plans. No change to use, egress or occupancy.
M01294027-P4
07/31/2026
Special inspection requirement — Final
Peter O'Loghlen
07/10/2026
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
07/02/2026
Inspection — Fail-Final PL - Up to 3 Requested Floors
Fail
View inspection ↗
06/29/2026
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
06/16/2026
Filed — Alteration
Renovation of existing apartments 7F and 7G. Remove and construct partitions and flooring. Remove and install plumbing fixtures as per plans. No change to use, egress or occupancy.
M01294027-P3
03/27/2026
Permit issued — General Construction
M01294027-I1-GC
03/26/2026
Permit issued — Plumbing
M01294027-S1-PL
03/23/2026
Filed — Alteration
Renovation of existing apartments 7F and 7G. Remove and construct partitions and flooring. Remove and install plumbing fixtures as per plans. No change to use, egress or occupancy.
M01294027-P2
03/18/2026
Permit issued — General Construction
M01294027-I1-GC
03/15/2026
Filed — Alteration
Renovation of existing apartments 7F and 7G. Remove and construct partitions and flooring. Remove and install plumbing fixtures as per plans. No change to use, egress or occupancy.
M01294027-P1
03/13/2026
Special inspection requirement — Final
Peter O'Loghlen
10/17/2025
Filed — Alteration
Renovation of existing apartments 7F and 7G. Remove and construct partitions and flooring. Remove and install plumbing fixtures as per plans. No change to use, egress or occupancy.
M01294027-S1
10/17/2025
Filed — Alteration
Renovation of existing apartments 7F and 7G. Remove and construct partitions and flooring. Remove and install plumbing fixtures as per plans. No change to use, egress or occupancy.
M01294027-I1
11/09/2023
Signed off — Alteration
EXTERIOR RESTORATION AS PER PLANS FILED HEREWITH. NO CHANGE TO USE, EGRESS OR OCCUPANCY.
M00743885-I1
09/11/2023
Permit issued — General Construction
M00743885-I1-GC
07/19/2023
Permit issued — Supported Scaffold
M00766320-I1-SF
07/19/2023
Permit issued — Sidewalk Shed
M00766297-I1-SH
10/10/2022
Filed — Alteration
INSTALLATION OF TEMPORARY SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
M00766297-P1
09/07/2022
Permit issued — General Construction
M00743885-I1-GC
07/21/2022
Filed — Alteration
INSTALLATION OF TEMPORARY PIPE SCAFFOLD AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
M00766320-I1
07/21/2022
Permit issued — Supported Scaffold
M00766320-I1-SF
07/12/2022
Filed — Alteration
INSTALLATION OF TEMPORARY SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
M00766297-I1
07/12/2022
Permit issued — Sidewalk Shed
M00766297-I1-SH
06/06/2022
Filed — Alteration
EXTERIOR RESTORATION AS PER PLANS FILED HEREWITH. NO CHANGE TO USE, EGRESS OR OCCUPANCY.
M00743885-I1
05/27/2022
Special inspection requirement — Post-installed Anchors
Anthony Addesso
05/27/2022
Special inspection requirement — Masonry
Anthony Addesso
05/23/2022
Special inspection requirement — Structural Stability – Alterations of existing buildings
Anthony Addesso
05/23/2022
Special inspection requirement — Energy Code Compliance Inspections
Anthony Addesso
05/23/2022
Special inspection requirement — Final
Anthony Addesso
05/23/2022
Special inspection requirement — Air barrier - visual inspection
Anthony Addesso
03/01/2021
Cycle 9 facade report submitted
02/28/2021
Cycle 9 facade report signed — SWARMP
01/21/2021
Cycle 9 facade inspection completed
02/16/2017
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
12/05/2016
Cycle 8 facade report submitted
11/02/2016
Cycle 8 facade report signed — SAFE
11/01/2016
Cycle 8 facade inspection completed
04/12/2016
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
04/12/2016
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
05/30/2014
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
05/30/2014
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
04/16/2014
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
04/16/2014
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
02/27/2013
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
02/27/2013
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
08/22/2012
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
05/23/2012
Violation issued (ECB, closed)
Elevators
04/03/2012
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
04/03/2012
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
02/17/2012
Cycle 7 facade report submitted
02/09/2012
Cycle 7 facade report signed — SAFE
01/25/2012
Cycle 7 facade inspection completed
07/21/2011
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
07/21/2011
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
08/25/2010
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
12/31/2009
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
09/29/2009
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
07/19/2007
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
Latest 60 of 104 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionPermit IssuedUPPER RESTORATION INC03/27/2026
DOB NOWPlumbingPermit IssuedJOHN FITZGERALD PLBG &HTG03/26/2026
DOB NOWGeneral ConstructionPermit IssuedUPPER RESTORATION INC03/18/2026
DOB NOWGeneral ConstructionSigned-offDEMARI SERVICES INC09/11/2023
DOB NOWSupported ScaffoldPermit IssuedEMPIRE NY INSTALLATIONS I07/19/2023
DOB NOWSidewalk ShedPermit IssuedEMPIRE NY INSTALLATIONS I07/19/2023
DOB NOWGeneral ConstructionSigned-offDEMARI SERVICES INC09/07/2022
DOB NOWSupported ScaffoldPermit IssuedEMPIRE NY INSTALLATIONS I07/21/2022
DOB NOWSidewalk ShedPermit IssuedEMPIRE NY INSTALLATIONS I07/12/2022
BISMHISSUEDAIRTRONICS AIR COND CORP04/20/2016
BISPLISSUEDSUPERIOR PLUMBING & HEATING11/04/2015
BISOTISSUEDLEGEND 3 CONSTRUCTION COR09/18/2015
BISOTISSUEDTOTAL STRUCTURAL CONCEPTS INC06/17/2015
BISOTISSUEDLEGEND 3 CONSTRUCTION COR10/14/2014
BISPLISSUEDFLYTIGER P & H LTD09/13/2013
BISPLISSUEDLLOYD G DRUMMOND PLBG&GEN08/28/2013
BISOTISSUEDTBRO'S RENOVATION INC08/26/2013
BISPLISSUEDJ. BARONE & CO INC05/03/2012
BISEQISSUEDEVEREST SCAFFOLDING INC07/25/2011
BISOTISSUEDJADE RESTORATION CORP05/09/2011
BISPLISSUEDJ. BARONE & CO INC04/21/2011
BISOTISSUEDOCA INTERIORS INC03/31/2011
BISFBISSUEDABILENE, INC09/29/2009
BISPLISSUEDULTIMATE PLBG AND HTG COR10/16/2008
BISOTISSUEDJPI CONTRACTING DBA09/30/2008
BISPLISSUEDORBIT PLBG & HTG INC03/09/2005
BISMHISSUEDGOLDEN TOUCH CORP02/07/2005
BISOTISSUEDGOLDEN TOUCH CORP01/25/2005
BISPLISSUEDDURNEY MECHANICAL03/29/2000
BISOTISSUEDCITI-PRO INTERIORS03/23/2000
BISOTISSUEDUPGRADE CONTR. CO. INC02/08/1999
BISEQISSUEDSPRING SCAFFOLDING INC10/07/1998
BISOTISSUEDUPGRADE CONTR. CO. INC09/29/1998
BIS—ISSUEDGEORGE SCHWARTZ ARCH10/24/1995
BISPLISSUEDBIG APPLE PLBG CORP09/06/1995
BISOTISSUEDBIG APPLE PLBG CORP09/06/1995
BISMHISSUEDJ SAN INC02/16/1994
BISPLISSUEDHOURIGEN & VOIGHT PLG AND HTG08/19/1992
BISOTISSUEDBROOK CONSTRUCTION CORP.08/05/1992
BISOTISSUEDBROOK CONSTRUCTION CORP.08/05/1992
+ 2 more permits on file
1 project · most recent 08/01/2026
Gas Water/Sanitary
FiledStatusContractorScope
08/01/2026Permit IssuedJOHN FITZGERALD PLBG &HTGGas, Water/Sanitary
7 projects · most recent 03/16/2026
General Wiring
FiledStatusContractorScope
03/16/2026Permit IssuedWORD OF LIGHT ELECT LLCGeneral Wiring
03/02/2026CancelledGRAMAR ELECTRIC LLCGeneral Wiring
04/03/2023Permit IssuedOMD ELECTRICAL CORP1 meters, 1 new_meters
06/27/2022Permit IssuedMEGA ELEC'L CONTR'G, INC—
01/21/2021CompleteAXCEL ELECTRIC CO., INC.—
01/13/2021CompleteAXCEL ELECTRIC CO., INC.—
01/13/2021CompleteAXCEL ELECTRIC CO., INC.—
2 projects · most recent 10/10/2022
Sidewalk Shed Scaffold
FiledStatusContractorScope
10/10/2022Permit IssuedEMPIRE NY INSTALLATIONS ISidewalk Shed
07/21/2022Permit IssuedEMPIRE NY INSTALLATIONS IScaffold
▾Field Inspections (DOB CAP) — 3
DateTypeResultReport
07/10/2026Pass-Final PL - Up to 3 Requested FloorsPassView ↗
07/02/2026Fail-Final PL - Up to 3 Requested FloorsFailView ↗
06/29/2026Pass-Final PL - Up to 3 Requested FloorsPassView ↗
▾Special Inspection Requirements (DOB NOW) — 8
DateRequirementInspectorRole
07/31/2026FinalPeter O'Loghlenprogress
03/13/2026FinalPeter O'Loghlenprogress
05/27/2022Post-installed AnchorsAnthony Addessospecial
05/27/2022MasonryAnthony Addessospecial
05/23/2022Structural Stability – Alterations of existing buildingsAnthony Addessospecial
05/23/2022Energy Code Compliance InspectionsAnthony Addessoprogress
05/23/2022FinalAnthony Addessoprogress
05/23/2022Air barrier - visual inspectionAnthony Addessoenergy_progress
▾Documents — 192 on file (BIS + DOB NOW)
▸Plans & Drawings11
▸DOB NOWPlans/Sketch11
09/02/2026M00743885-I1Request digital key ↗
09/02/2026M00766320-I1Request digital key ↗
09/01/2026M00766297-I1Request digital key ↗
Showing 3 of 11 on file for this type
▸Applications & Permits31
▸BISWORK PERMIT APPLICATION17
04/19/2016140475830Open ↗
11/17/2015122163513Open ↗
10/01/2015122163513Open ↗
Showing 3 of 17 on file for this type
▸BISPLAN / WORK APPROVAL APPLICATION14
12/28/2022120629061Open ↗
12/28/2022120629061Open ↗
07/12/2017122176475Open ↗
Showing 3 of 14 on file for this type
▸Seals & Professional Certifications41
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION16
07/28/2017122176475Open ↗
07/20/2017122176475Open ↗
11/25/2016122163513Open ↗
Showing 3 of 16 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature11
09/02/2026M00766320-I1Open ↗
08/21/2026M01294027-P2Open ↗
08/21/2026M01294027-I1Open ↗
Showing 3 of 11 on file for this type
▸DOB NOWProgress Inspector Seal & Signature4
09/06/2026M01294027-P1Open ↗
08/31/2026M00743885-I1Open ↗
08/31/2026M00743885-I1Open ↗
Showing 3 of 4 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM3
08/22/2013121754547Open ↗
07/28/2011120766411Open ↗
09/29/2009120167568Open ↗
▸BISPROFESSIONAL CERTIFIED CHECKLIST3
08/22/2013121754547Open ↗
07/28/2011120766411Open ↗
09/29/2009120167568Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT1
04/19/2016140475830Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY1
04/19/2016140475830Open ↗
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION1
04/19/2016140475830Open ↗
▸DOB NOWSpecial Inspector Seal & Signature1
08/31/2026M00743885-I1Open ↗
▸Trade Schedules & Equipment21
▸BISSELF-CERT PLUMBING NOTICE8
01/06/2016122163513Open ↗
11/21/2013121754547Open ↗
06/05/2012120629061Open ↗
Showing 3 of 8 on file for this type
▸BISSCHEDULE B - PLUMBING5
11/26/2014122163513Open ↗
08/22/2013121754547Open ↗
03/29/2011120629061Open ↗
Showing 3 of 5 on file for this type
▸BISSCHEDULE C - HEATING & COMBUSTION EQUIPMENT3
04/22/2010120167568Open ↗
10/23/2009120167568Open ↗
09/29/2009120167568Open ↗
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE3
08/24/2016122163513Open ↗
12/17/2014122109896Open ↗
10/30/2014122176475Open ↗
▸BISEQUIPMENT USE PERMITS1
07/14/2016140475830Open ↗
▸BISEQUIPMENT USE APPLICATION/PERMIT1
07/01/2016140475830Open ↗
▸Environmental & Asbestos18
▸DOB NOWDEP ACP-5: Asbestos Assessment Report8
08/21/2026M01294027-P2Open ↗
08/21/2026M01294027-I1Open ↗
08/21/2026M01294027-P5Open ↗
Showing 3 of 8 on file for this type
▸BISASBESTOS: CERTIFICATION (DEP ACP5)4
04/19/2016140475830Open ↗
12/17/2014122109896Open ↗
11/26/2014122163513Open ↗
Showing 3 of 4 on file for this type
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'3
06/25/2008110213260Open ↗
06/25/2008110213260Open ↗
03/16/2011120629061Open ↗
▸BISASBESTOS INSPECTION REPORT2
09/29/2009120167568Open ↗
09/29/2009120167568Open ↗
▸BISDEP ASBESTOS PROJECT COMPLETION FORM1
06/25/2015122176475Open ↗
▸Energy Compliance20
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS8
07/28/2017122176475Open ↗
07/20/2017122176475Open ↗
11/25/2016122163513Open ↗
Showing 3 of 8 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS6
01/24/2023120629061Open ↗
07/28/2017122176475Open ↗
07/20/2017122176475Open ↗
Showing 3 of 6 on file for this type
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY2
01/24/2023120629061Open ↗
04/19/2016140475830Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY FOR ENERGY CODE PROGRESS INSPECTIONS1
04/19/2016140475830Open ↗
▸BISNYCECC ANALYSIS1
04/19/2016140475830Open ↗
▸BISTECHNICAL REPORT: ENERGY1
03/29/2011120629061Open ↗
▸DOB NOWEN2: As Built Energy Analysis1
08/13/2026M00743885-I1Open ↗
▸Inspections & Test Reports2
▸BISTECHNICAL REPORT: RESPONSIBILITY2
01/24/2023120629061Open ↗
04/19/2016140475830Open ↗
▸Approvals, Objections & Sign-offs17
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST9
01/27/2023120629061Open ↗
07/28/2017122176475Open ↗
07/24/2017122176475Open ↗
Showing 3 of 9 on file for this type
▸BISADMINISTRATIVE OBJECTIONS5
12/17/2014122109896Open ↗
07/28/2011120766411Open ↗
03/16/2011120629061Open ↗
Showing 3 of 5 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION3
10/16/2014122109896Open ↗
09/20/2013121754547Open ↗
01/30/2012120661603Open ↗
▸Cost, Insurance & Ownership16
▸BISCOST AFFIDAVIT16
01/24/2023120629061Open ↗
07/28/2017122176475Open ↗
07/20/2017122176475Open ↗
Showing 3 of 16 on file for this type
▸Filing & Intake Forms14
▸BISEFILING COVER SHEET7
12/17/2014122109896Open ↗
11/26/2014122163513Open ↗
10/30/2014122176475Open ↗
Showing 3 of 7 on file for this type
▸BISADDITIONAL INFORMATION6
07/05/2017122176475Open ↗
09/01/2016122163513Open ↗
12/19/2013121754547Open ↗
Showing 3 of 6 on file for this type
▸BISEFILING JOB APPLICATION COVER SHEET1
04/19/2016140475830Open ↗
▸Other Documents1
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION1
06/08/2010120167568Open ↗