← Back
BuildNYC
Office only, 2-6 stories
Mt Sinai Adolescent Health Center
320 EAST 94TH STREET · BIN 1050296
💬 Discuss this project
1968Year Built
5Stories
O2Building Class
C8-4Zoning
56,700 sfGross Floor Area
3Units
LL97 Covered0 Active ViolationsFDNY Report ↗
Office only, 2-6 stories · Owner of record: Mount Sinai School Etc · 12,588 sf lot · 4.5 FAR built · Flood zone X500
Locations of Work
ArchitectureStructuralElectricalMechanicalPlumbingEquipmentGeneral
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Permit Issued — active, not yet Signed-off
RoofMount Sinal Medical Center, Mount Sinai Hospital16p · 2 filings · 20 docs
Floor 6Mount Sinal Medical Center2p · 1 filing · 4 docs
Floor 5Mount Sinal Medical Center, Mount Sinai HospitalUnder Construction10p · 3 filings · 15 docs
Floor 4Mount Sinal Medical Center, Mount Sinai HospitalUnder Construction10p · 3 filings · 10 docs
Floor 3Mount Sinal Medical Center, Mount Sinai HospitalUnder Construction10p · 2 filings · 10 docs
Floor 2Mount Sinal Medical Center, Mount Sinai HospitalUnder Construction10p · 2 filings · 10 docs
Floor 1Mount Sinai HospitalUnder Construction8p · 1 filing · 6 docs
CellarMount Sinai Hospital24p · 5 filings · 20 docs
Site & exteriorMount Sinai HospitalUnder Construction14p · 3 filings · 15 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
Mount Sinai Hospital4107/08/2026
Icahn School of Medicine803/21/2026
Mount Sinai School Etc103/22/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
GKG Architect110/14/2026
Arianna Braun Architects109/28/2026
Michael Walsh102/05/2026
The Vsa Group101/20/2026
Richard Puswald PE412/17/2025
Tohfaz Uddin PE107/18/2024
Mario Mendoza Blanco812/02/2022
Loring Consulting Engineers206/15/2021
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
AE Design Solution1003/21/2026
Environmental Engineering Solutions1003/21/2026
Rigging Consultants203/21/2026
VSA103/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Eagle Scaffolding ServicesScaffold504/09/2026
National Mechanical Services PlumbingPlumbing307/08/2026
On-Trac Construction AssociatesGeneral Contractor303/21/2026
LhotseGeneral Contractor104/09/2026
Mho's ElectricElectrical103/22/2026
Ariston ChimneyGeneral Contractor107/08/2026
Magic MechanicalPlumbing107/08/2026
J T & T Air Conditioningspecialty_contractor107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
PCS Engineering3745102/05/2026
The Vsa Group1767101/20/2026
Alan Margolin & Associates4231012/02/2022
Building Lifecycle
All (158)Filed (19)Permit Issued (13)Signed Off (9)Violation (52)Inspection (9)Objection (26)Special Inspection (30)
10/14/2026
Filed — Alteration
MOUNT SINAI - STAR CENTER EARLY DEMO FLOOR 4TH FLOOR - INTERIOR DEMO ASSOCIATED WITH GENERAL CONSTRUCTION PLANS FILED HERWITH. NO CHNAGE IN USE, EGRESS OR OCCUPANCY.
M01459038-I1
09/28/2026
Filed — Alteration
SP Soft DEMO as per plans filed herewith. No change in use, egress or occupancy under our ALT2 application.
M01429949-I1
09/14/2026
Special inspection requirement — Final
09/03/2026
Signed off — Alteration
Main Roof and setback roofs replacement and facade repairs No change in egress, use and occupancy.
M01255881-I1
07/13/2026
Special inspection requirement — Final
JONAR MADRIAGA
06/16/2026
Signed off — Alteration
M01354227-I1
05/12/2026
Inspection — Pass-Final PL - Underground
Pass
View inspection ↗
05/01/2026
Inspection — Pass-Final PL - Underground
Pass
View inspection ↗
02/05/2026
Filed — Alteration
M01354227-I1
02/05/2026
Permit issued — Suspended Scaffold
M01354227-I1-SC
01/22/2026
Permit issued — General Construction
M01255881-I1-GC
01/20/2026
Filed — Alteration
Main Roof and setback roofs replacement and facade repairs No change in egress, use and occupancy.
M01255881-I1
12/17/2025
Filed — Alteration
INSTALLATION OF TEMPORARY BETAMAX HOIST AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
M01315751-P1
12/15/2025
Filed — Alteration
INSTALLATION OF TEMPORARY PIPE SCAFFOLD AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
M01315753-P1
11/19/2025
Permit issued — Protection and Mechanical Methods
M01315751-I1-PMM
11/18/2025
Permit issued — Supported Scaffold
M01315753-I1-SF
11/17/2025
Filed — Alteration
INSTALLATION OF TEMPORARY BETAMAX HOIST AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
M01315751-I1
11/17/2025
Filed — Alteration
INSTALLATION OF TEMPORARY PIPE SCAFFOLD AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
M01315753-I1
07/16/2025
Permit issued — Sidewalk Shed
M01075436-I1-SH
09/18/2024
Violation issued (FDNY_ORDER, closed)
09/18/2024
Violation issued (FDNY_ORDER, closed)
07/18/2024
Filed — Alteration
M01075436-I1
07/18/2024
Permit issued — Sidewalk Shed
M01075436-I1-SH
10/02/2023
Signed off — Alteration
Installation of a linear trench system and the construction of a sump pit located in the mechanical room at the cellar floor of an existing 5 story commercial building.
M00738113-I1
06/12/2023
Permit issued — General Construction
M00738113-I1-GC
05/02/2023
Signed off — Alteration
Renovation work in medical center cellar mechanical boiler room with new equipment, piping for flood mitigation purposes. No change in use, occupancy or egress.
M00738123-I1
05/02/2023
Signed off — Alteration
Replacement of existing boiler and hot water heater with three (3) new condensing boilers and two (2) indirect water heaters with associated devices.
M00634877-I1
05/02/2023
Signed off — Alteration
Replacement of existing boiler and hot water heater with three (3) new condensing boilers and two (2) indirect water heaters with associated devices.
M00634877-S1
04/21/2023
Signed off — Alteration
INSTALLATION OF NEW CHIMNEY LINER, INCLUDING ALL THE MECHANICAL WORK REQUIRED, AND DELIVERY OF EQUIPMENT.
M00662247-I1
04/21/2023
Signed off — Alteration
Replacement of existing boiler and hot water heater with three (3) new condensing boilers and two (2) domestic hot water heaters with associated devices.
M00634879-I1
04/07/2023
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
04/07/2023
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
12/27/2022
Inspection — Pass-Final Boiler Equipment Inspection
Pass
View inspection ↗
12/19/2022
Permit issued — Boiler Equipment
M00634877-S1-BE
12/09/2022
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
12/09/2022
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
12/02/2022
Filed — Alteration
Replacement of existing boiler and hot water heater with three (3) new condensing boilers and two (2) domestic hot water heaters with associated devices.
M00634879-P2
11/22/2022
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
11/11/2022
Filed — Alteration
Replacement of existing boiler and hot water heater with three (3) new condensing boilers and two (2) domestic hot water heaters with associated devices.
M00634879-P1
11/04/2022
Special inspection requirement — Fire-Resistant Penetrations and Joints
Young Suh
10/26/2022
Filed — Alteration
Replacement of existing boiler and hot water heater with three (3) new condensing boilers and two (2) indirect water heaters with associated devices.
M00634877-S1
10/21/2022
Special inspection requirement — Fire-Resistant Penetrations and Joints
Young Suh
10/21/2022
Special inspection requirement — Heating Systems
Young Suh
10/21/2022
Special inspection requirement — HVAC-R and service water heating equipment
Young Suh
10/21/2022
Special inspection requirement — HVAC-R and service water heating system controls
Young Suh
10/21/2022
Special inspection requirement — HVAC-R and service water piping design and insulation
Young Suh
10/21/2022
Special inspection requirement — Maintenance information
Young Suh
10/20/2022
Inspection — Pass-Final Boiler Equipment Inspection
Pass
View inspection ↗
08/02/2022
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
06/03/2022
Permit issued — Plumbing
M00738123-I1-PL
05/31/2022
Filed — Alteration
Installation of a linear trench system and the construction of a sump pit located in the mechanical room at the cellar floor of an existing 5 story commercial building.
M00738113-I1
05/31/2022
Filed — Alteration
Renovation work in medical center cellar mechanical boiler room with new equipment, piping for flood mitigation purposes. No change in use, occupancy or egress.
M00738123-I1
05/13/2022
Special inspection requirement — Fire-Resistant Penetrations and Joints
Young Suh
04/27/2022
Permit issued — General Construction
M00662247-I1-GC
03/16/2022
Permit issued — Plumbing
M00634879-I1-PL
02/22/2022
Permit issued — Boiler Equipment
M00634877-I1-BE
02/18/2022
Objection raised — Scope
02/18/2022
Objection resolved — Addressed
02/02/2022
Objection raised — Inspections
02/02/2022
Objection resolved — Addressed
Latest 60 of 158 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSuspended ScaffoldSigned-offLhotse02/05/2026
DOB NOWGeneral ConstructionSigned-offLhotse01/22/2026
DOB NOWProtection and Mechanical MethodsPermit IssuedEagle Scaffolding Services11/19/2025
DOB NOWSupported ScaffoldPermit IssuedEagle Scaffolding Services11/18/2025
DOB NOWSidewalk ShedPermit IssuedEagle Scaffolding Services07/16/2025
DOB NOWSidewalk ShedPermit IssuedEagle Scaffolding Services07/18/2024
DOB NOWGeneral ConstructionSigned-offOn-Trac Construction Associates06/12/2023
DOB NOWBoiler EquipmentSigned-offNational Mechanical Services Plumbing12/19/2022
DOB NOWPlumbingSigned-offMagic Mechanical06/03/2022
DOB NOWGeneral ConstructionSigned-offAriston Chimney04/27/2022
DOB NOWPlumbingSigned-offNational Mechanical Services Plumbing03/16/2022
DOB NOWBoiler EquipmentSigned-offNational Mechanical Services Plumbing02/22/2022
DOB NOWMechanical SystemsSigned-offJTT Air Conditioning09/22/2020
BISOTISSUEDOlympic Torch Contracting02/01/2024
BISMHISSUEDOlympic Torch Contracting02/01/2024
BISOTISSUEDOlympic Torch Contracting03/26/2018
BISMHISSUEDOlympic Torch Contracting03/26/2018
BISPLISSUEDCardoza Plumbing11/17/2015
BISPLISSUEDCardoza Plumbing10/22/2014
BISSPISSUEDJ. Caiazzo Plumbing & Heating10/19/2011
BISSPISSUEDVulpis & Vulpis Plumbing04/06/2010
BISMHISSUEDKatselnik & Katselnik Group07/22/2009
BISSPISSUEDTristate Plumbing Services04/10/1998
BISOTISSUEDPM Contracting Co08/07/1997
BISEQISSUEDRockledge Scaffold08/04/1995
BISPLISSUEDCharles Casa and Sons04/19/1995
BISOTISSUEDHerbert Construction Co04/12/1995
BISEQISSUEDRegional Scaffold & Hoisting Co01/11/1995
BISSPISSUEDPace Plumbing11/17/1994
BISPLISSUEDPace Plumbing10/20/1994
BISMHISSUEDNivin Construction09/28/1994
BISOTISSUEDNivin Construction09/23/1994
BISOTISSUEDHerbert Construction Co09/21/1994
BISEQISSUEDHerbert Construction Co09/21/1994
BISMHISSUEDHerbert Construction Co09/21/1994
BISOTISSUEDHerbert Construction Co09/21/1994
1 project · most recent 09/28/2026
Heating and Air Conditioning Systems Ventilation Systems
FiledStatusContractorScopeMake / Model / Capacity
09/28/2026——Heating and Air Conditioning Systems, Ventilation Systems
Heat / Cool
Greenheck CUBE-360XP-50 5,000 CFM · Exhaust Fan ×1
g-140-VG 800 CFM · Exhaust Fan ×1
Nortek MANNOTH Ahu ×1
Ventilation
Greenheck CUBE-100HP-5 550 CFM · Exhaust Fan ×1
1 project · most recent 09/28/2026
Sprinkler System
FiledStatusContractorScope
09/28/2026——Sprinkler System
1 project · most recent 09/28/2026
Water/Sanitary
FiledStatusContractorScope
09/28/2026——Water/Sanitary
3 projects · most recent 07/03/2024
General Wiring
FiledStatusContractorScope
07/03/2024CompleteCorporate Electric Group—
10/27/2021CompleteMho's ElectricGeneral Wiring
10/24/2018Permit IssuedDifazio Electric NYGeneral Wiring
▾Field Inspections (DOB CAP) — 9
DateTypeResultReport
05/12/2026Pass-Final PL - UndergroundPassView ↗
05/01/2026Pass-Final PL - UndergroundPassView ↗
04/07/2023Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
04/07/2023Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
12/27/2022Pass-Final Boiler Equipment InspectionPassView ↗
12/09/2022Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
12/09/2022Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
11/22/2022Pass-Final PL - Up to 3 Requested FloorsPassView ↗
10/20/2022Pass-Final Boiler Equipment InspectionPassView ↗
▾Special Inspection Requirements (DOB NOW) — 30
DateRequirementInspectorRole
09/14/2026Final—progress
07/13/2026FinalJONAR MADRIAGAprogress
11/04/2022Fire-Resistant Penetrations and JointsYoung Suhspecial
10/21/2022Fire-Resistant Penetrations and JointsYoung Suhspecial
10/21/2022Heating SystemsYoung Suhspecial
10/21/2022HVAC-R and service water heating equipmentYoung Suhenergy_progress
10/21/2022HVAC-R and service water heating system controlsYoung Suhenergy_progress
10/21/2022HVAC-R and service water piping design and insulationYoung Suhenergy_progress
10/21/2022Maintenance informationYoung Suhenergy_progress
05/13/2022Fire-Resistant Penetrations and JointsYoung Suhspecial
01/13/2022Maintenance informationYoung Suhenergy_progress
01/13/2022HVAC-R and service water piping design and insulationYoung Suhenergy_progress
01/13/2022HVAC-R and service water heating system controlsYoung Suhenergy_progress
01/13/2022Fire-Resistant Penetrations and JointsYoung Suhspecial
01/13/2022Heating SystemsYoung Suhspecial
01/13/2022HVAC-R and service water heating equipmentYoung Suhenergy_progress
06/17/2021Mechanical SystemsYoung Suhspecial
06/17/2021FinalYoung Suhprogress
06/17/2021HVAC insulation and sealing Young Suhenergy_progress
06/17/2021HVAC and service water heating equipment Young Suhenergy_progress
06/17/2021Maintenance informationYoung Suhenergy_progress
06/17/2021HVAC and service water heating system controls Young Suhenergy_progress
06/17/2021Energy Code Compliance InspectionsYoung Suhprogress
05/28/2021Energy Code Compliance InspectionsYoung Suhprogress
05/28/2021FinalYoung Suhprogress
Latest 25 of 30.
▾Tenants in the building
TenantSpaceFloorsRenovation projects
Mount Sinal Medical CenterMedical / HealthcareFloors 2–6, Roof
Project M01459038 Alteration · Approved · 10/14/2026
Project M01255881 Alteration · LOC Issued · 01/20/2026
Names are taken automatically from the text of each project’s filed documents (title blocks and cover sheets) and screened to exclude owners, landlords and designers. They may be incomplete or wrong; check the filing.
▾Documents — 218 on file (BIS + DOB NOW)
▸Plans & Drawings23
▸DOB NOWPlans/Sketch21
10/20/2026M01459038-I1Request digital key ↗
10/15/2026M01459038-I1Request digital key ↗
10/04/2026M01429949-I1Request digital key ↗
Showing 3 of 21 on file for this type
▸DOB NOWPlans/Sketch - Mechanical Systems2
09/04/2026M00352261-I1Request digital key ↗
08/15/2026M00352261-P1Request digital key ↗
▸Applications & Permits32
▸BISPLAN / WORK APPROVAL APPLICATION22
02/28/2024123022068Open ↗
02/22/2024123022068Open ↗
02/01/2024123022068Open ↗
Showing 3 of 22 on file for this type
▸BISWORK PERMIT APPLICATION10
02/01/2024123022068Open ↗
02/01/2024123022068Open ↗
03/26/2018123022068Open ↗
Showing 3 of 10 on file for this type
▸Seals & Professional Certifications60
▸DOB NOWDPL-1: Design Professional Seal & Signature19
10/15/2026M01459038-I1Open ↗
10/04/2026M01429949-I1Open ↗
09/04/2026M00352261-P1Open ↗
Showing 3 of 19 on file for this type
▸DOB NOWProgress Inspector Seal & Signature15
10/05/2026M01429949-I1Open ↗
09/23/2026M00634877-S1Open ↗
09/23/2026M00634877-I1Open ↗
Showing 3 of 15 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION13
03/26/2018123022068Open ↗
03/26/2018123022068Open ↗
04/20/2017123022059Open ↗
Showing 3 of 13 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature6
09/23/2026M00634877-S1Open ↗
09/23/2026M00634877-I1Open ↗
08/26/2026M00634879-P1Open ↗
Showing 3 of 6 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST4
02/22/2024123022068Open ↗
02/06/2024123022068Open ↗
03/17/2017123022068Open ↗
Showing 3 of 4 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT3
03/17/2017123022068Open ↗
03/17/2017123022068Open ↗
03/16/2017123022059Open ↗
▸Trade Schedules & Equipment10
▸BISSCHEDULE B - PLUMBING7
02/01/2012120048812Open ↗
01/27/2012120048812Open ↗
04/26/2011120670657Open ↗
Showing 3 of 7 on file for this type
▸BISSELF-CERT PLUMBING NOTICE2
02/04/2011120048812Open ↗
11/20/2009120048812Open ↗
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE1
03/16/2017123022059Open ↗
▸Environmental & Asbestos20
▸DOB NOWDEP ACP-5: Asbestos Assessment Report11
10/15/2026M01459038-I1Open ↗
10/04/2026M01429949-S1Open ↗
10/04/2026M01429949-S3Open ↗
Showing 3 of 11 on file for this type
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'4
04/26/2011120670657Open ↗
09/18/2009120158257Open ↗
06/15/2009120072063Open ↗
Showing 3 of 4 on file for this type
▸BISASBESTOS: CERTIFICATION (DEP ACP5)3
03/17/2017123022068Open ↗
03/16/2017123022059Open ↗
03/13/2017123016841Open ↗
▸DOB NOWDEP ACP-20/ACP-21: Asbestos Project Conditional Completion Form/Asbestos Project Completion Form1
08/19/2026M01255881-I1Open ↗
▸DOB NOWOER: Notice to Proceed1
08/13/2026M01091433-I1Open ↗
▸Energy Compliance6
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS2
04/03/2017123022068Open ↗
03/15/2016122153427Open ↗
▸DOB NOWPreliminary Commissioning Report Certification2
09/02/2026M00634877-I1Open ↗
09/02/2026M00634877-S1Open ↗
▸BISAS-BUILT ENERGY ANALYSIS (EN2)1
04/09/2024123022068Open ↗
▸DOB NOWEN2: As Built Energy Analysis1
09/02/2026M00634877-I1Open ↗
▸Inspections & Test Reports4
▸BISTECHNICAL REPORT: RESPONSIBILITY4
04/10/2024123022068Open ↗
04/10/2024123022068Open ↗
04/10/2024123022068Open ↗
Showing 3 of 4 on file for this type
▸Approvals, Objections & Sign-offs28
▸DOB NOWFee Exempt Supporting Document - DOF ACRIS report or BIB letter22
10/20/2026M01459038-I1Open ↗
10/15/2026M01459038-I1Open ↗
10/04/2026M01429949-I1Open ↗
Showing 3 of 22 on file for this type
▸BISADMINISTRATIVE OBJECTIONS4
04/26/2011120670657Open ↗
09/18/2009120158257Open ↗
06/15/2009120072063Open ↗
Showing 3 of 4 on file for this type
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST2
09/18/2023100904531Open ↗
03/15/2016122153427Open ↗
▸Cost, Insurance & Ownership10
▸BISCOST AFFIDAVIT9
03/17/2017123022068Open ↗
03/17/2017123022068Open ↗
03/16/2017123022059Open ↗
Showing 3 of 9 on file for this type
▸BISCOST AFFIDAVIT (FINAL): PW31
04/09/2024123022068Open ↗
▸Filing & Intake Forms16
▸BISEFILING COVER SHEET8
03/17/2017123022068Open ↗
03/17/2017123022068Open ↗
03/16/2017123022059Open ↗
Showing 3 of 8 on file for this type
▸BISADDITIONAL INFORMATION6
02/09/2012120048812Open ↗
10/28/2010120048812Open ↗
08/26/2010120048812Open ↗
Showing 3 of 6 on file for this type
▸BISBOROUGH INTAKE FORM2
02/01/2024123022068Open ↗
02/01/2024123022068Open ↗
▸Other Documents9
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION4
03/13/2017123016841Open ↗
03/13/2017123022059Open ↗
03/10/2017123022068Open ↗
Showing 3 of 4 on file for this type
▸BISMICROFILM/SCAN: INITIAL1
10/04/2024101106660Open ↗
▸BISSupporting Document: Fee Deferment1
03/15/2016122153427Open ↗
▸BISSupporting Document: Fee Exempt1
01/11/2024123022068Open ↗
▸DOB NOWCalculations1
08/13/2026M01354227-I1Open ↗
▸DOB NOWManufacturer's Specifications1
08/13/2026M01354227-I1Open ↗