← Back
Public elementary, junior or senior high
Life Sciences Secondary School
320 EAST 96 STREET · Upper East Side-Yorkville · BIN 1050338
💬 Discuss this project
1920Year Built
4Stories
W1Building Class
R8Zoning
83,962 sfGross Floor Area
1Units
LL97 Covered5 Open Violations 1 unresolved · 4 paperwork only ▸
Public elementary, junior or senior high · Owner of record: NYC DEPARTMENT OF EDUCATION · 30,212 sf lot · 2.78 FAR built · Flood zone X500
Locations of Work
ArchitectureMechanical
Permit Issued — active, not yet Signed-off
RoofUnder Construction17p · 1 filing · 20 docs
Floor 4Under Construction15p · 1 filing · 20 docs
Floor 3Under Construction14p · 1 filing · 20 docs
Floor 2Under Construction15p · 1 filing · 20 docs
Floor 1Under Construction17p · 1 filing · 20 docs
CellarUnder Construction16p · 1 filing · 20 docs
Site & exteriorUnder Construction5p · 1 filing · 7 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
NYCSCA4409/07/2026
NY SCHOOL CONSTRUCTION AUTHORITY703/21/2026
NEW YORK SCHOOL CONSTRUCTION603/21/2026
SCHOOL CONSTRUCTION AUTH303/21/2026
SCA203/22/2026
NYC DEPARTMENT OF EDUCATION103/22/2026
NYC103/21/2026
DEPARTMENT OF EDUCATION DSF103/21/2026
NYC SCHOOL CONSTRUCTION AUTHORIT103/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
HRM ENGINEERING SERVICES, PC908/25/2026
DSENY ENGINEERING SERVICES, PC111/15/2023
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
GG ENGINEERING303/21/2026
DSENY ENGINEERING SERVICES203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
ZOI CONTRACTING INCGeneral Contractor2409/07/2026
BROWN, JERMAINEElectrical103/21/2026
HAS, MEHMETElectrical103/21/2026
APRILAKIS, EVANGELINAElectrical103/21/2026
KATZEN, BARRYElectrical103/21/2026
LUCA ANTONELLI CONTRACTINElectrical103/21/2026
JEFFREY MILADElectrical103/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
KS ENGINEERS, P.C.7715908/25/2026
Building Lifecycle
All (119)Filed (10)Permit Issued (14)Violation (60)Inspection (3)Objection (2)Special Inspection (30)
09/03/2026
Permit issued — Mechanical Systems
M08030268-I1-MS
08/25/2026
Filed — Alteration
1. REPAIR BOILER ROOM FLOOR AND PROVIDE NEW FINISH FLOORING. REPOINT INTERIOR MASONRY WALL. PATCH PLASTER AT CEILING. 2.PATCH AND REPAIR EXIST. PLASTER CEILING ON FIRST FLOOR. 3. REMOVE WINDOW PANE AT EXISTING BATHROOM ON 1ST FLOOR THROUGH 4TH FLOOR
M08030268-A1
08/20/2026
Permit issued — General Construction
M08030268-S1-GC
05/22/2026
Special inspection requirement — Final
Mohamed Shahid
05/22/2026
Special inspection requirement — Mechanical Systems
Mohamed Shahid
05/22/2026
Special inspection requirement — Flood Zone Compliance (attach FEMA elevation/dry floodproofing certificate where applicable)
Mohamed Shahid
05/22/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
Mohamed Shahid
04/17/2026
Special inspection requirement — Final
Mohamed Shahid
04/17/2026
Special inspection requirement — Flood Zone Compliance (attach FEMA elevation/dry floodproofing certificate where applicable)
04/17/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
Mohamed Shahid
04/17/2026
Special inspection requirement — Mechanical Systems
Mohamed Shahid
04/14/2026
Filed — Alteration
1. REPAIR BOILER ROOM FLOOR AND PROVIDE NEW FINISH FLOORING. REPOINT INTERIOR MASONRY WALL. PATCH PLASTER AT CEILING. 2.PATCH AND REPAIR EXIST. PLASTER CEILING ON FIRST FLOOR. 3. REMOVE WINDOW PANE AT EXISTING BATHROOM ON 1ST FLOOR THROUGH 4TH FLOOR
M08030268-P8
03/18/2026
Violation issued (ECB, open)
Construction
03/18/2026
Violation issued (ECB, open)
Construction
03/18/2026
Violation issued (ECB, open)
Construction
03/18/2026
Violation issued (ECB, open)
Construction
03/17/2026
Special inspection requirement — Final
Mohamed Shahid
03/17/2026
Special inspection requirement — Mechanical Systems
Mohamed Shahid
03/17/2026
Special inspection requirement — Flood Zone Compliance (attach FEMA elevation/dry floodproofing certificate where applicable)
03/17/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
Mohamed Shahid
03/11/2026
Filed — Alteration
1. REPAIR BOILER ROOM FLOOR AND PROVIDE NEW FINISH FLOORING. REPOINT INTERIOR MASONRY WALL. PATCH PLASTER AT CEILING. 2.PATCH AND REPAIR EXIST. PLASTER CEILING ON FIRST FLOOR. 3. REMOVE WINDOW PANE AT EXISTING BATHROOM ON 1ST FLOOR THROUGH 4TH FLOOR
M08030268-P7
03/02/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
Mohamed Shahid
03/02/2026
Special inspection requirement — Flood Zone Compliance (attach FEMA elevation/dry floodproofing certificate where applicable)
03/02/2026
Special inspection requirement — Mechanical Systems
Mohamed Shahid
03/02/2026
Special inspection requirement — Final
Mohamed Shahid
01/20/2026
Permit issued — Mechanical Systems
M08030268-I1-MS
01/20/2026
Permit issued — General Construction
M08030268-S1-GC
01/20/2026
Permit issued — Construction Fence
M00961702-I1-FN
12/22/2025
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
12/19/2025
Permit issued — General Construction
M08030268-S1-GC
12/19/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Mohamed Shahid
12/19/2025
Special inspection requirement — Fire-Resistance Rated Construction
Mohamed Shahid
12/19/2025
Special inspection requirement — Flood Zone Compliance (attach FEMA elevation/dry floodproofing certificate where applicable)
Mohamed Shahid
12/19/2025
Special inspection requirement — Masonry
Mohamed Shahid
12/16/2025
Filed — Alteration
1. REPAIR BOILER ROOM FLOOR AND PROVIDE NEW FINISH FLOORING. REPOINT INTERIOR MASONRY WALL. PATCH PLASTER AT CEILING. 2.PATCH AND REPAIR EXIST. PLASTER CEILING ON FIRST FLOOR. 3. REMOVE WINDOW PANE AT EXISTING BATHROOM ON 1ST FLOOR THROUGH 4TH FLOOR
M08030268-P6
12/16/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Mohamed Shahid
12/16/2025
Special inspection requirement — Fire-Resistance Rated Construction
Mohamed Shahid
12/16/2025
Special inspection requirement — Masonry
Mohamed Shahid
12/16/2025
Special inspection requirement — Flood Zone Compliance (attach FEMA elevation/dry floodproofing certificate where applicable)
Mohamed Shahid
12/11/2025
Permit issued — Mechanical Systems
M08030268-I1-MS
12/11/2025
Permit issued — Construction Fence
M00961702-I1-FN
11/20/2025
Filed — Alteration
1. REPAIR BOILER ROOM FLOOR AND PROVIDE NEW FINISH FLOORING. REPOINT INTERIOR MASONRY WALL. PATCH PLASTER AT CEILING. 2.PATCH AND REPAIR EXIST. PLASTER CEILING ON FIRST FLOOR. 3. REMOVE WINDOW PANE AT EXISTING BATHROOM ON 1ST FLOOR THROUGH 4TH FLOOR
M08030268-P5
11/19/2025
Special inspection requirement — Masonry
Mohamed Shahid
11/19/2025
Special inspection requirement — Fire-Resistance Rated Construction
Mohamed Shahid
11/19/2025
Special inspection requirement — Lowest Floor Elevation
11/19/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Mohamed Shahid
11/19/2025
Special inspection requirement — Flood Zone Compliance (attach FEMA elevation/dry floodproofing certificate where applicable)
Mohamed Shahid
10/02/2025
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
10/02/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
05/01/2025
Violation issued (ECB, closed)
Construction
05/01/2025
Violation issued (ECB, closed)
Construction
04/07/2025
Filed — Alteration
1. REPAIR BOILER ROOM FLOOR AND PROVIDE NEW FINISH FLOORING. REPOINT INTERIOR MASONRY WALL. PATCH PLASTER AT CEILING. 2.PATCH AND REPAIR EXIST. PLASTER CEILING ON FIRST FLOOR. 3. REMOVE WINDOW PANE AT EXISTING BATHROOM ON 1ST FLOOR THROUGH 4TH FLOOR
M08030268-P4
04/02/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Mohamed Shahid
03/28/2025
Violation issued (ECB, closed)
Construction
03/11/2025
Filed — Alteration
1. REPAIR BOILER ROOM FLOOR AND PROVIDE NEW FINISH FLOORING. REPOINT INTERIOR MASONRY WALL. PATCH PLASTER AT CEILING. 2.PATCH AND REPAIR EXIST. PLASTER CEILING ON FIRST FLOOR. 3. REMOVE WINDOW PANE AT EXISTING BATHROOM ON 1ST FLOOR THROUGH 4TH FLOOR
M08030268-P3
12/13/2024
Permit issued — Mechanical Systems
M08030268-I1-MS
12/13/2024
Permit issued — General Construction
M08030268-S1-GC
12/13/2024
Permit issued — Construction Fence
M00961702-I1-FN
04/11/2024
Violation issued (ECB, closed)
Construction
12/14/2023
Permit issued — Mechanical Systems
M08030268-I1-MS
Latest 60 of 119 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWMechanical SystemsPermit IssuedZOI CONTRACTING INC09/03/2026
DOB NOWGeneral ConstructionPermit IssuedZOI CONTRACTING INC08/20/2026
DOB NOWMechanical SystemsPermit IssuedZOI CONTRACTING INC01/20/2026
DOB NOWGeneral ConstructionPermit IssuedZOI CONTRACTING INC01/20/2026
DOB NOWConstruction FencePermit IssuedZOI CONTRACTING INC01/20/2026
DOB NOWGeneral ConstructionPermit IssuedZOI CONTRACTING INC12/19/2025
DOB NOWMechanical SystemsPermit IssuedZOI CONTRACTING INC12/11/2025
DOB NOWConstruction FencePermit IssuedZOI CONTRACTING INC12/11/2025
DOB NOWMechanical SystemsPermit IssuedZOI CONTRACTING INC12/13/2024
DOB NOWGeneral ConstructionPermit IssuedZOI CONTRACTING INC12/13/2024
DOB NOWConstruction FencePermit IssuedZOI CONTRACTING INC12/13/2024
DOB NOWMechanical SystemsPermit IssuedZOI CONTRACTING INC12/14/2023
DOB NOWGeneral ConstructionPermit IssuedZOI CONTRACTING INC12/14/2023
DOB NOWConstruction FencePermit IssuedZOI CONTRACTING INC12/12/2023
BISOTISSUEDLITEHOUSE BUILDERS INC07/09/2021
BISEQISSUEDYORK SCAFFOLD EQUIPMENT CORP.01/15/2021
BISEQISSUEDLITEHOUSE BUILDERS INC12/18/2020
BISEQISSUEDLITEHOUSE BUILDERS INC12/18/2020
BISOTISSUEDLITEHOUSE BUILDERS INC07/10/2020
BISPLISSUEDGENUINE PLBG & HTG LLC06/12/2020
BISEQISSUEDYORK SCAFFOLD EQUIPMENT CORP.01/14/2020
BISEQISSUEDLITEHOUSE BUILDERS INC12/09/2019
BISEQISSUEDLITEHOUSE BUILDERS INC12/09/2019
BISOTISSUEDLITEHOUSE BUILDERS INC07/12/2019
BISEQISSUEDLITEHOUSE BUILDERS INC12/18/2018
BISEQISSUEDLITEHOUSE BUILDERS INC12/11/2018
BISEQISSUEDLITEHOUSE BUILDERS INC12/10/2018
BISEQISSUEDYORK SCAFFOLD EQUIPMENT CORP.11/01/2018
BISEQISSUEDYORK SCAFFOLD EQUIPMENT CORP.11/21/2017
BISEQISSUEDYORK SCAFFOLD EQUIPMENT CORP.09/15/2016
BISEQISSUEDYORK SCAFFOLD EQUIPMENT CORP.04/28/2016
BISMHISSUEDCHAPMAN & EVANS CONTRACT02/12/2016
BISEQISSUEDYORK SCAFFOLD EQUIPMENT CORP.09/01/2015
BISMHISSUEDCHAPMAN & EVANS CONTRACT11/18/2014
BISMHISSUEDCHAPMAN & EVANS CONTRACT09/26/2014
BISOTISSUEDMINELLI CONSTRUCTION CO I12/05/2013
BISOTISSUEDMINELLI CONSTRUCTION CO I12/05/2013
BISOTISSUEDMINELLI CONSTRUCTION CO I01/11/2013
BISPLISSUEDVARSITY PLBG AND HTG INC12/12/2012
BISOTISSUEDMINELLI CONSTRUCTION CO I12/12/2012
+ 24 more permits on file
1 project · most recent 08/25/2026
Heating Systems Ventilation Systems
FiledStatusContractorScopeMake / Model / Capacity
08/25/2026Permit IssuedZOI CONTRACTING INCHeating Systems, Ventilation Systems
Heating
Trane CSAA030UA 969,520 BTU · Ahu ×3
CSAA040UA 1,207,290 BTU · Ahu ×3
CSAA030UAM00 969,520 BTU · Ahu ×1
CSAA040UAM00 1,207,290 BTU · Ahu ×1
Ventilation
Greenheck SP-A390-VG 280 CFM · Exhaust Fan ×28
SP-A50-90-VG 70 CFM · Exhaust Fan ×21
CUE-140-A-10-1-22-X 2,550 CFM · Exhaust Fan ×16
CUE-160-A-20-1-22-X 3,500 CFM · Exhaust Fan ×12
CUE-090-VG-1-19-X 330 CFM · Exhaust Fan ×4
CUE-120-A-7-1-19-X 1,350 CFM · Exhaust Fan ×4
CUE-130-A-7-1-19-X 1,800 CFM · Exhaust Fan ×4
SP-A510-VG 420 CFM · Exhaust Fan ×4
USF-16-3-B7-00-02-02 2,250 CFM · Exhaust Fan ×4
SP-AP-0511W-1 70 CFM · Exhaust Fan ×7
Trane CSAA030UA 11,580 CFM · Ahu ×3
CSAA040UA 14,400 CFM · Ahu ×3
CSAA030UAM00 11,580 CFM · Ahu ×1
CSAA040UAM00 14,400 CFM · Ahu ×1
5 projects · most recent 01/16/2024
General Wiring Lighting
FiledStatusContractorScope
01/16/2024Permit IssuedINTAKE ELECT CONT CORPGeneral Wiring
10/25/2023Permit IssuedMILAD CONTRACTING CORP.General Wiring, Lighting
07/27/2021CompleteMAC FHIONNGHAILE & SONSGeneral Wiring
09/23/2020Permit IssuedLIU ELECTRIC, LLCGeneral Wiring
08/23/2018CompleteLASER ELEC'L CONSTR'G INC—
▾Field Inspections (DOB CAP) — 3
DateTypeResultReport
12/22/2025Pass-Final PL - Up to 3 Requested FloorsPassView ↗
10/02/2025Certified Gas-Gas-Piping-RoughingCertifiedView ↗
10/02/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 34
DateRequirementInspectorRole
05/22/2026FinalMohamed Shahidprogress
05/22/2026Mechanical SystemsMohamed Shahidspecial
05/22/2026Flood Zone Compliance (attach FEMA elevation/dry floodproofing certificate where applicable)Mohamed Shahidspecial
05/22/2026Fire-Resistant Penetrations and JointsMohamed Shahidspecial
04/17/2026FinalMohamed Shahidprogress
04/17/2026Flood Zone Compliance (attach FEMA elevation/dry floodproofing certificate where applicable)—special
04/17/2026Fire-Resistant Penetrations and JointsMohamed Shahidspecial
04/17/2026Mechanical SystemsMohamed Shahidspecial
03/17/2026FinalMohamed Shahidprogress
03/17/2026Mechanical SystemsMohamed Shahidspecial
03/17/2026Flood Zone Compliance (attach FEMA elevation/dry floodproofing certificate where applicable)—special
03/17/2026Fire-Resistant Penetrations and JointsMohamed Shahidspecial
03/02/2026Fire-Resistant Penetrations and JointsMohamed Shahidspecial
03/02/2026Flood Zone Compliance (attach FEMA elevation/dry floodproofing certificate where applicable)—special
03/02/2026Mechanical SystemsMohamed Shahidspecial
03/02/2026FinalMohamed Shahidprogress
12/19/2025Fire-Resistant Penetrations and JointsMohamed Shahidspecial
12/19/2025Fire-Resistance Rated ConstructionMohamed Shahidprogress
12/19/2025Flood Zone Compliance (attach FEMA elevation/dry floodproofing certificate where applicable)Mohamed Shahidspecial
12/19/2025MasonryMohamed Shahidspecial
12/16/2025Fire-Resistant Penetrations and JointsMohamed Shahidspecial
12/16/2025Fire-Resistance Rated ConstructionMohamed Shahidprogress
12/16/2025MasonryMohamed Shahidspecial
12/16/2025Flood Zone Compliance (attach FEMA elevation/dry floodproofing certificate where applicable)Mohamed Shahidspecial
11/19/2025MasonryMohamed Shahidspecial
Latest 25 of 34.
▾Documents — 95 on file (BIS + DOB NOW)
▸Plans & Drawings12
▸DOB NOWPlans/Sketch12
09/01/2026M08030268-A1Request digital key ↗
09/01/2026M08030268-I1Request digital key ↗
08/28/2026M00961702-I1Request digital key ↗
Showing 3 of 12 on file for this type
▸Applications & Permits1
▸BISPLAN / WORK APPROVAL APPLICATION1
11/17/2022141019993Open ↗
▸Zoning, Tax Lot & Property Records1
▸BISFLOOD ZONE DESIGN CERTIFICATION1
11/17/2022141019993Open ↗
▸Seals & Professional Certifications33
▸DOB NOWSpecial Inspector Seal & Signature12
09/23/2026M08030268-A1Open ↗
08/29/2026M08030268-P4Open ↗
08/29/2026M08030268-P4Open ↗
Showing 3 of 12 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature10
08/17/2026M08030268-A1Open ↗
08/17/2026M08030268-P8Open ↗
08/13/2026M08030268-P5Open ↗
Showing 3 of 10 on file for this type
▸DOB NOWProgress Inspector Seal & Signature8
09/23/2026M08030268-A1Open ↗
08/29/2026M08030268-P4Open ↗
08/28/2026M08030268-P6Open ↗
Showing 3 of 8 on file for this type
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION1
11/17/2022141019993Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT1
11/17/2022141019993Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY1
11/17/2022141019993Open ↗
▸Safety & Tenant Protection1
▸DOB NOWNYCSCA - Approved Site Safety Plans1
08/13/2026M00961702-I1Open ↗
▸Environmental & Asbestos3
▸DOB NOWDEP ACP-20/ACP-21: Asbestos Project Conditional Completion Form/Asbestos Project Completion Form2
08/17/2026M08030268-I1Open ↗
08/17/2026M08030268-S1Open ↗
▸BISASBESTOS: CERTIFICATION (DEP ACP5)1
11/17/2022141019993Open ↗
▸Approvals, Objections & Sign-offs25
▸DOB NOWFee Exempt Supporting Document - DOF ACRIS report or BIB letter10
08/17/2026M08030268-A1Open ↗
08/17/2026M08030268-P8Open ↗
08/13/2026M08030268-P7Open ↗
Showing 3 of 10 on file for this type
▸DOB NOWDesign Commission Approval City Owned (Exterior Work)10
08/17/2026M08030268-P8Open ↗
08/17/2026M08030268-A1Open ↗
08/13/2026M08030268-S1Open ↗
Showing 3 of 10 on file for this type
▸DOB NOWDesign Commission Sign Off City Owned (Exterior Work)2
08/17/2026M08030268-I1Open ↗
08/17/2026M08030268-S1Open ↗
▸DOB NOWDEP Variance (V5) letter2
08/13/2026M08030268-I1Open ↗
08/13/2026M08030268-S1Open ↗
▸BISDESIGN COMM. APPROVAL: CITY-OWNED PROPERTY (EXTERIOR WORK)1
11/17/2022141019993Open ↗
▸Cost, Insurance & Ownership2
▸BISCOST AFFIDAVIT1
11/17/2022141019993Open ↗
▸DOB NOWNYCSCA Wrap-up Insurance1
08/13/2026M00961702-I1Open ↗
▸Filing & Intake Forms1
▸BISEFILING JOB APPLICATION COVER SHEET1
11/17/2022141019993Open ↗
▸Other Documents16
▸DOB NOWNYCSCA - BCC Plan Examination Transmittal10
08/17/2026M08030268-A1Open ↗
08/17/2026M08030268-P8Open ↗
08/13/2026M08030268-P5Open ↗
Showing 3 of 10 on file for this type
▸DOB NOWProof of Historic Building5
08/17/2026M08030268-A1Open ↗
08/17/2026M08030268-P8Open ↗
08/13/2026M08030268-P7Open ↗
Showing 3 of 5 on file for this type
▸BISSUBSTANTIAL IMPROVEMENT CALCULATIONS1
11/17/2022141019993Open ↗