← Back
BuildNYC
Public elementary, junior or senior high
High School for Climate Justice
320 EAST 96TH STREET · Name © OpenStreetMap contributors · BIN 1050338
💬 Discuss this project
1920Year Built
4Stories
W1Building Class
R8Zoning
83,962 sfGross Floor Area
1Units
LL97 Covered1 Active Violation 0 unresolved · 1 paperwork only ▸
Public elementary, junior or senior high · Owner of record: NYC Department of Education · 30,212 sf lot · 2.78 FAR built · Flood zone X500
Locations of Work
ArchitectureStructuralMechanical
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Permit Issued — active, not yet Signed-off
RoofLife Science Secondary SchoolUnder Construction22p · 1 filing · 20 docs
Floor 4Life Science Secondary SchoolUnder Construction19p · 1 filing · 20 docs
Floor 3Life Science Secondary SchoolUnder Construction18p · 1 filing · 20 docs
Floor 2Life Science Secondary SchoolUnder Construction19p · 1 filing · 20 docs
Floor 1Life Science Secondary SchoolUnder Construction21p · 1 filing · 20 docs
CellarLife Science Secondary SchoolUnder Construction19p · 1 filing · 20 docs
Site & exteriorI.S. 655M (M645)Under Construction5p · 1 filing · 6 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
NYC School Construction Authority5910/13/2026
New York School Construction603/21/2026
NYC Department of Education203/22/2026
NYC Department of Housing Preservation and Development103/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
HRM Engineering Services1009/30/2026
Dseny Engineering Services111/15/2023
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Geri Goldman Engineering303/21/2026
Dseny Engineering Services203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Zoi ContractingGeneral Contractor1609/07/2026
Zoi ContractingScaffold804/09/2026
Europa Electric of NYElectrical103/21/2026
Milad ContractingElectrical103/21/2026
Katco ElectricElectrical103/21/2026
Mattern EElectrical103/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
KS Engineers77151009/30/2026
Building Lifecycle
All (119)Filed (11)Permit Issued (14)Violation (60)Objection (4)Special Inspection (30)
10/01/2026
Objection raised — Other
10/01/2026
Objection resolved — Addressed
09/30/2026
Filed — Alteration
1. REPAIR BOILER ROOM FLOOR AND PROVIDE NEW FINISH FLOORING. REPOINT INTERIOR MASONRY WALL. PATCH PLASTER AT CEILING. 2.PATCH AND REPAIR EXIST. PLASTER CEILING ON FIRST FLOOR. 3. REMOVE WINDOW PANE AT EXISTING BATHROOM ON 1ST FLOOR THROUGH 4TH FLOOR
M08030268-A2
09/30/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
Mohamed Shahid
09/30/2026
Special inspection requirement — Final
Mohamed Shahid
09/30/2026
Special inspection requirement — Mechanical Systems
Mohamed Shahid
09/30/2026
Special inspection requirement — Flood Zone Compliance (attach FEMA elevation/dry floodproofing certificate where applicable)
Mohamed Shahid
09/03/2026
Permit issued — Mechanical Systems
M08030268-I1-MS
08/25/2026
Filed — Alteration
1. REPAIR BOILER ROOM FLOOR AND PROVIDE NEW FINISH FLOORING. REPOINT INTERIOR MASONRY WALL. PATCH PLASTER AT CEILING. 2.PATCH AND REPAIR EXIST. PLASTER CEILING ON FIRST FLOOR. 3. REMOVE WINDOW PANE AT EXISTING BATHROOM ON 1ST FLOOR THROUGH 4TH FLOOR
M08030268-A1
08/20/2026
Permit issued — General Construction
M08030268-S1-GC
05/22/2026
Special inspection requirement — Final
Mohamed Shahid
05/22/2026
Special inspection requirement — Mechanical Systems
Mohamed Shahid
05/22/2026
Special inspection requirement — Flood Zone Compliance (attach FEMA elevation/dry floodproofing certificate where applicable)
Mohamed Shahid
05/22/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
Mohamed Shahid
04/17/2026
Special inspection requirement — Mechanical Systems
Mohamed Shahid
04/17/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
Mohamed Shahid
04/17/2026
Special inspection requirement — Flood Zone Compliance (attach FEMA elevation/dry floodproofing certificate where applicable)
04/17/2026
Special inspection requirement — Final
Mohamed Shahid
04/14/2026
Filed — Alteration
1. REPAIR BOILER ROOM FLOOR AND PROVIDE NEW FINISH FLOORING. REPOINT INTERIOR MASONRY WALL. PATCH PLASTER AT CEILING. 2.PATCH AND REPAIR EXIST. PLASTER CEILING ON FIRST FLOOR. 3. REMOVE WINDOW PANE AT EXISTING BATHROOM ON 1ST FLOOR THROUGH 4TH FLOOR
M08030268-P8
03/17/2026
Special inspection requirement — Final
Mohamed Shahid
03/17/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
Mohamed Shahid
03/17/2026
Special inspection requirement — Flood Zone Compliance (attach FEMA elevation/dry floodproofing certificate where applicable)
03/17/2026
Special inspection requirement — Mechanical Systems
Mohamed Shahid
03/11/2026
Filed — Alteration
1. REPAIR BOILER ROOM FLOOR AND PROVIDE NEW FINISH FLOORING. REPOINT INTERIOR MASONRY WALL. PATCH PLASTER AT CEILING. 2.PATCH AND REPAIR EXIST. PLASTER CEILING ON FIRST FLOOR. 3. REMOVE WINDOW PANE AT EXISTING BATHROOM ON 1ST FLOOR THROUGH 4TH FLOOR
M08030268-P7
03/02/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
Mohamed Shahid
03/02/2026
Special inspection requirement — Flood Zone Compliance (attach FEMA elevation/dry floodproofing certificate where applicable)
03/02/2026
Special inspection requirement — Mechanical Systems
Mohamed Shahid
03/02/2026
Special inspection requirement — Final
Mohamed Shahid
02/20/2026
Violation issued (ECB, open)
Construction
02/20/2026
Violation issued (ECB, closed)
Construction
02/20/2026
Violation issued (ECB, closed)
Construction
02/20/2026
Violation issued (ECB, closed)
Construction
01/20/2026
Permit issued — Construction Fence
M00961702-I1-FN
01/20/2026
Permit issued — Mechanical Systems
M08030268-I1-MS
01/20/2026
Permit issued — General Construction
M08030268-S1-GC
12/19/2025
Permit issued — General Construction
M08030268-S1-GC
12/19/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Mohamed Shahid
12/19/2025
Special inspection requirement — Masonry
Mohamed Shahid
12/19/2025
Special inspection requirement — Flood Zone Compliance (attach FEMA elevation/dry floodproofing certificate where applicable)
Mohamed Shahid
12/19/2025
Special inspection requirement — Fire-Resistance Rated Construction
Mohamed Shahid
12/16/2025
Filed — Alteration
1. REPAIR BOILER ROOM FLOOR AND PROVIDE NEW FINISH FLOORING. REPOINT INTERIOR MASONRY WALL. PATCH PLASTER AT CEILING. 2.PATCH AND REPAIR EXIST. PLASTER CEILING ON FIRST FLOOR. 3. REMOVE WINDOW PANE AT EXISTING BATHROOM ON 1ST FLOOR THROUGH 4TH FLOOR
M08030268-P6
12/16/2025
Special inspection requirement — Fire-Resistance Rated Construction
Mohamed Shahid
12/16/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Mohamed Shahid
12/16/2025
Special inspection requirement — Flood Zone Compliance (attach FEMA elevation/dry floodproofing certificate where applicable)
Mohamed Shahid
12/16/2025
Special inspection requirement — Masonry
Mohamed Shahid
12/11/2025
Permit issued — Construction Fence
M00961702-I1-FN
12/11/2025
Permit issued — Mechanical Systems
M08030268-I1-MS
11/20/2025
Filed — Alteration
1. REPAIR BOILER ROOM FLOOR AND PROVIDE NEW FINISH FLOORING. REPOINT INTERIOR MASONRY WALL. PATCH PLASTER AT CEILING. 2.PATCH AND REPAIR EXIST. PLASTER CEILING ON FIRST FLOOR. 3. REMOVE WINDOW PANE AT EXISTING BATHROOM ON 1ST FLOOR THROUGH 4TH FLOOR
M08030268-P5
11/19/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Mohamed Shahid
11/19/2025
Special inspection requirement — Fire-Resistance Rated Construction
Mohamed Shahid
05/01/2025
Violation issued (ECB, closed)
Construction
05/01/2025
Violation issued (ECB, closed)
Construction
04/07/2025
Filed — Alteration
1. REPAIR BOILER ROOM FLOOR AND PROVIDE NEW FINISH FLOORING. REPOINT INTERIOR MASONRY WALL. PATCH PLASTER AT CEILING. 2.PATCH AND REPAIR EXIST. PLASTER CEILING ON FIRST FLOOR. 3. REMOVE WINDOW PANE AT EXISTING BATHROOM ON 1ST FLOOR THROUGH 4TH FLOOR
M08030268-P4
03/28/2025
Violation issued (ECB, closed)
Construction
03/11/2025
Filed — Alteration
1. REPAIR BOILER ROOM FLOOR AND PROVIDE NEW FINISH FLOORING. REPOINT INTERIOR MASONRY WALL. PATCH PLASTER AT CEILING. 2.PATCH AND REPAIR EXIST. PLASTER CEILING ON FIRST FLOOR. 3. REMOVE WINDOW PANE AT EXISTING BATHROOM ON 1ST FLOOR THROUGH 4TH FLOOR
M08030268-P3
12/13/2024
Permit issued — General Construction
M08030268-S1-GC
12/13/2024
Permit issued — Mechanical Systems
M08030268-I1-MS
12/13/2024
Permit issued — Construction Fence
M00961702-I1-FN
04/11/2024
Violation issued (ECB, closed)
Construction
12/14/2023
Permit issued — Mechanical Systems
M08030268-I1-MS
Latest 60 of 119 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWMechanical SystemsPermit IssuedZoi Contracting09/03/2026
DOB NOWGeneral ConstructionPermit IssuedZoi Contracting08/20/2026
DOB NOWConstruction FencePermit IssuedZoi Contracting01/20/2026
DOB NOWMechanical SystemsPermit IssuedZoi Contracting01/20/2026
DOB NOWGeneral ConstructionPermit IssuedZoi Contracting01/20/2026
DOB NOWGeneral ConstructionPermit IssuedZoi Contracting12/19/2025
DOB NOWConstruction FencePermit IssuedZoi Contracting12/11/2025
DOB NOWMechanical SystemsPermit IssuedZoi Contracting12/11/2025
DOB NOWGeneral ConstructionPermit IssuedZoi Contracting12/13/2024
DOB NOWMechanical SystemsPermit IssuedZoi Contracting12/13/2024
DOB NOWConstruction FencePermit IssuedZoi Contracting12/13/2024
DOB NOWMechanical SystemsPermit IssuedZoi Contracting12/14/2023
DOB NOWGeneral ConstructionPermit IssuedZoi Contracting12/14/2023
DOB NOWConstruction FencePermit IssuedZoi Contracting12/12/2023
BISOTISSUEDLitehouse Builders07/09/2021
BISEQISSUEDYork Scaffold Equipment01/15/2021
BISEQISSUEDLitehouse Builders12/18/2020
BISEQISSUEDLitehouse Builders12/18/2020
BISOTISSUEDLitehouse Builders07/10/2020
BISPLISSUEDGenuine Plumbing & Heating06/12/2020
BISEQISSUEDYork Scaffold Equipment01/14/2020
BISEQISSUEDLitehouse Builders12/09/2019
BISEQISSUEDLitehouse Builders12/09/2019
BISOTISSUEDLitehouse Builders07/12/2019
BISEQISSUEDLitehouse Builders12/18/2018
BISEQISSUEDLitehouse Builders12/11/2018
BISEQISSUEDLitehouse Builders12/10/2018
BISEQISSUEDYork Scaffold Equipment11/01/2018
BISEQISSUEDYork Scaffold Equipment11/21/2017
BISEQISSUEDYork Scaffold Equipment09/15/2016
BISEQISSUEDYork Scaffold Equipment04/28/2016
BISMHISSUEDChapman & Evans Contracting02/12/2016
BISEQISSUEDYork Scaffold Equipment09/01/2015
BISMHISSUEDChapman & Evans Contracting11/18/2014
BISMHISSUEDChapman & Evans Contracting09/26/2014
BISOTISSUEDMinelli Construction Co I12/05/2013
BISOTISSUEDMinelli Construction Co I12/05/2013
BISOTISSUEDMinelli Construction Co I01/11/2013
BISOTISSUEDMinelli Construction Co I12/12/2012
BISPLISSUEDVarsity Plumbing and Heating12/12/2012
+ 24 more permits on file
1 project · most recent 09/30/2026
Heating Systems Ventilation Systems
FiledStatusContractorScopeMake / Model / Capacity
09/30/2026Permit IssuedZoi ContractingHeating Systems, Ventilation Systems
Heating
Trane CSAA030UAM00 969,520 BTU · Ahu ×2
CSAA040UAM00 1,207,290 BTU · Ahu ×2
CSAA030UA 969,520 BTU · Ahu ×3
CSAA040UA 1,207,290 BTU · Ahu ×3
Ventilation
Greenheck SP-A390-VG 280 CFM · Exhaust Fan ×35
SP-A50-90-VG 70 CFM · Exhaust Fan ×28
CUE-140-A-10-1-22-X 2,550 CFM · Exhaust Fan ×20
CUE-160-A-20-1-22-X 3,500 CFM · Exhaust Fan ×15
CUE-090-VG-1-19-X 330 CFM · Exhaust Fan ×5
CUE-120-A-7-1-19-X 1,350 CFM · Exhaust Fan ×5
CUE-130-A-7-1-19-X 1,800 CFM · Exhaust Fan ×5
SP-A510-VG 420 CFM · Exhaust Fan ×5
USF-16-3-B7-00-02-02 2,250 CFM · Exhaust Fan ×5
SP-AP-0511W-1 70 CFM · Exhaust Fan ×7
Trane CSAA030UAM00 11,580 CFM · Ahu ×2
CSAA040UAM00 14,400 CFM · Ahu ×2
CSAA030UA 11,580 CFM · Ahu ×3
CSAA040UA 14,400 CFM · Ahu ×3
5 projects · most recent 10/01/2026
General Wiring Lighting
FiledStatusContractorScope
10/01/2026CompleteMilad ContractingGeneral Wiring, Lighting
01/16/2024Permit IssuedIntake Electric ContGeneral Wiring
07/27/2021CompleteMac Fhionnghaile & SonsGeneral Wiring
09/23/2020Permit IssuedLiu ElectricGeneral Wiring
08/23/2018CompleteLaser Electrical Constr'g—
▾Special Inspection Requirements (DOB NOW) — 38
DateRequirementInspectorRole
09/30/2026Fire-Resistant Penetrations and JointsMohamed Shahidspecial
09/30/2026FinalMohamed Shahidprogress
09/30/2026Mechanical SystemsMohamed Shahidspecial
09/30/2026Flood Zone Compliance (attach FEMA elevation/dry floodproofing certificate where applicable)Mohamed Shahidspecial
05/22/2026FinalMohamed Shahidprogress
05/22/2026Mechanical SystemsMohamed Shahidspecial
05/22/2026Flood Zone Compliance (attach FEMA elevation/dry floodproofing certificate where applicable)Mohamed Shahidspecial
05/22/2026Fire-Resistant Penetrations and JointsMohamed Shahidspecial
04/17/2026Mechanical SystemsMohamed Shahidspecial
04/17/2026Fire-Resistant Penetrations and JointsMohamed Shahidspecial
04/17/2026Flood Zone Compliance (attach FEMA elevation/dry floodproofing certificate where applicable)—special
04/17/2026FinalMohamed Shahidprogress
03/17/2026FinalMohamed Shahidprogress
03/17/2026Fire-Resistant Penetrations and JointsMohamed Shahidspecial
03/17/2026Flood Zone Compliance (attach FEMA elevation/dry floodproofing certificate where applicable)—special
03/17/2026Mechanical SystemsMohamed Shahidspecial
03/02/2026Fire-Resistant Penetrations and JointsMohamed Shahidspecial
03/02/2026Flood Zone Compliance (attach FEMA elevation/dry floodproofing certificate where applicable)—special
03/02/2026Mechanical SystemsMohamed Shahidspecial
03/02/2026FinalMohamed Shahidprogress
12/19/2025Fire-Resistant Penetrations and JointsMohamed Shahidspecial
12/19/2025MasonryMohamed Shahidspecial
12/19/2025Flood Zone Compliance (attach FEMA elevation/dry floodproofing certificate where applicable)Mohamed Shahidspecial
12/19/2025Fire-Resistance Rated ConstructionMohamed Shahidprogress
12/16/2025Fire-Resistance Rated ConstructionMohamed Shahidprogress
Latest 25 of 38.
▾Tenants in the building
TenantSpaceFloorsRenovation projects
I.S. 655M (M645)Education—
Project M00961702 Alteration · Permit Entire · 11/15/2023
Life Science Secondary SchoolEducationCellar, Floors 1–4, Roof
Project M08030268 Alteration · Permit Entire · 11/15/2022
Names are taken automatically from the text of each project’s filed documents (title blocks and cover sheets) and screened to exclude owners, landlords and designers. They may be incomplete or wrong; check the filing.
▾Documents — 103 on file (BIS + DOB NOW)
▸Plans & Drawings12
▸DOB NOWPlans/Sketch12
09/01/2026M08030268-I1Request digital key ↗
09/01/2026M08030268-A1Request digital key ↗
08/28/2026M00961702-I1Request digital key ↗
Showing 3 of 12 on file for this type
▸Applications & Permits1
▸BISPLAN / WORK APPROVAL APPLICATION1
11/17/2022141019993Open ↗
▸Zoning, Tax Lot & Property Records1
▸BISFLOOD ZONE DESIGN CERTIFICATION1
11/17/2022141019993Open ↗
▸Seals & Professional Certifications37
▸DOB NOWSpecial Inspector Seal & Signature14
10/05/2026M08030268-A2Open ↗
10/05/2026M08030268-A2Open ↗
09/23/2026M08030268-A1Open ↗
Showing 3 of 14 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature11
10/04/2026M08030268-A2Open ↗
08/17/2026M08030268-P8Open ↗
08/17/2026M08030268-A1Open ↗
Showing 3 of 11 on file for this type
▸DOB NOWProgress Inspector Seal & Signature9
10/05/2026M08030268-A2Open ↗
09/23/2026M08030268-A1Open ↗
08/29/2026M08030268-P4Open ↗
Showing 3 of 9 on file for this type
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION1
11/17/2022141019993Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT1
11/17/2022141019993Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY1
11/17/2022141019993Open ↗
▸Safety & Tenant Protection1
▸DOB NOWNYCSCA - Approved Site Safety Plans1
08/13/2026M00961702-I1Open ↗
▸Environmental & Asbestos3
▸DOB NOWDEP ACP-20/ACP-21: Asbestos Project Conditional Completion Form/Asbestos Project Completion Form2
08/17/2026M08030268-S1Open ↗
08/17/2026M08030268-I1Open ↗
▸BISASBESTOS: CERTIFICATION (DEP ACP5)1
11/17/2022141019993Open ↗
▸Approvals, Objections & Sign-offs27
▸DOB NOWFee Exempt Supporting Document - DOF ACRIS report or BIB letter11
10/04/2026M08030268-A2Open ↗
08/17/2026M08030268-P8Open ↗
08/17/2026M08030268-A1Open ↗
Showing 3 of 11 on file for this type
▸DOB NOWDesign Commission Approval City Owned (Exterior Work)11
10/04/2026M08030268-A2Open ↗
08/17/2026M08030268-P8Open ↗
08/17/2026M08030268-A1Open ↗
Showing 3 of 11 on file for this type
▸DOB NOWDesign Commission Sign Off City Owned (Exterior Work)2
08/17/2026M08030268-S1Open ↗
08/17/2026M08030268-I1Open ↗
▸DOB NOWDEP Variance (V5) letter2
08/13/2026M08030268-I1Open ↗
08/13/2026M08030268-S1Open ↗
▸BISDESIGN COMM. APPROVAL: CITY-OWNED PROPERTY (EXTERIOR WORK)1
11/17/2022141019993Open ↗
▸Cost, Insurance & Ownership2
▸BISCOST AFFIDAVIT1
11/17/2022141019993Open ↗
▸DOB NOWNYCSCA Wrap-up Insurance1
08/13/2026M00961702-I1Open ↗
▸Filing & Intake Forms1
▸BISEFILING JOB APPLICATION COVER SHEET1
11/17/2022141019993Open ↗
▸Other Documents18
▸DOB NOWNYCSCA - BCC Plan Examination Transmittal11
10/04/2026M08030268-A2Open ↗
08/17/2026M08030268-P8Open ↗
08/17/2026M08030268-A1Open ↗
Showing 3 of 11 on file for this type
▸DOB NOWProof of Historic Building6
10/04/2026M08030268-A2Open ↗
08/17/2026M08030268-P8Open ↗
08/17/2026M08030268-A1Open ↗
Showing 3 of 6 on file for this type
▸BISSUBSTANTIAL IMPROVEMENT CALCULATIONS1
11/17/2022141019993Open ↗