← Back
BuildNYC
Public elementary, junior or senior high
P.S. 11: the Sarah J. Garnet Elementary School
320 WEST 21ST STREET · BIN 1013260
💬 Discuss this project
1925Year Built
5Stories
W1Building Class
R7BZoning
89,802 sfGross Floor Area
3Units
LL97 Covered9 Active Violations 0 unresolved · 9 paperwork only ▸
Public elementary, junior or senior high · Owner of record: NYC Department of Education · 27,600 sf lot · 3.25 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralPlumbing
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Floor 1P.S. 11: the Sarah J. Garnet Elementary School2 filings · 8 docs
BasementP.S. 11 Manhattan7p · 1 filing · 20 docs
Sub-BasementP.S. 11 Manhattan8p · 1 filing · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
NYC School Construction Authority7107/08/2026
NYC Department of Education403/22/2026
New York City Public School203/21/2026
NYC Department of Housing Preservation and Development203/21/2026
Boe City of NY103/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Eme Group/Salas O'Brien207/14/2025
Nelligan White Architects411/01/2024
Shenoy Engineering208/08/2024
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Nelligan White Architects403/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
DRL ServicesGeneral Contractor607/08/2026
Varsity Plumbing and HeatingPlumbing307/08/2026
Pulsar ElectricElectrical203/21/2026
KLK ElectricElectrical203/21/2026
Levis Electr'l ContractingElectrical103/22/2026
Christ Gatzonis Electric ConElectrical103/21/2026
Anco Electl ContctngElectrical103/21/2026
Energize Elc'l CNTRGElectrical103/21/2026
DVM Electrical ServicesElectrical103/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
JPC Logistics Dba JPCL EN351107/14/2025
20/20 Inspections1471411/01/2024
Building Lifecycle
All (99)Filed (8)Permit Issued (7)Signed Off (2)Violation (60)Inspection (2)Objection (6)Special Inspection (14)
04/22/2026
Violation issued (ECB, open)
Construction
04/22/2026
Violation issued (ECB, open)
Construction
04/22/2026
Violation issued (ECB, open)
Construction
04/22/2026
Violation issued (ECB, open)
Construction
04/22/2026
Violation issued (ECB, open)
Construction
01/12/2026
Violation issued (ECB, closed)
Construction
07/14/2025
Filed — Alteration
INSTALLATION OF SUPPLEMENTAL COOLING SYSTEM IN THE CAFETERIA.
M01251835-I1
07/11/2025
Violation issued (ECB, open)
Construction
07/11/2025
Violation issued (ECB, closed)
Construction
07/11/2025
Violation issued (ECB, open)
Construction
07/10/2025
Filed — Alteration
Installation of Supplemental Cooling System in Auditorium indoor evaporator and Outdoor Condenser Units.
M01250747-I1
07/07/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Asma Hashmi
07/07/2025
Special inspection requirement — Post-installed Anchors
Asma Hashmi
07/07/2025
Special inspection requirement — Mechanical Systems
Asma Hashmi
07/07/2025
Special inspection requirement — Final
Asma Hashmi
07/02/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
07/02/2025
Special inspection requirement — Mechanical Systems
07/02/2025
Special inspection requirement — Post-installed Anchors
07/02/2025
Special inspection requirement — Final
03/10/2025
Signed off — Alteration
Upgrades to the furniture and finishes in the boys and girls changing rooms at the cellar.
M00671745-S1
03/07/2025
Signed off — Alteration
Upgrades to the furniture and finishes in the boys and girls changing rooms at the cellar.
M00671745-I1
02/27/2025
Inspection — Pass-Final General Construction Non-Directive 14
Pass
View inspection ↗
12/12/2024
Permit issued — Plumbing
M00671745-S1-PL
11/26/2024
Inspection — Pass-Final PL - Up to 9 Requested Floors
Pass
View inspection ↗
11/05/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
JACOB HAAS
11/05/2024
Special inspection requirement — Post-installed Anchors
JACOB HAAS
11/01/2024
Filed — Alteration
Upgrades to the furniture and finishes in the boys and girls changing rooms at the cellar.
M00671745-P4
10/31/2024
Special inspection requirement — Post-installed Anchors
JACOB HAAS
10/31/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
JACOB HAAS
09/10/2024
Violation issued (ECB, closed)
Construction
09/10/2024
Violation issued (ECB, closed)
Construction
09/10/2024
Violation issued (ECB, open)
Construction
08/20/2024
Permit issued — General Construction
M00671745-I1-GC
08/08/2024
Filed — Alteration
Upgrades to the furniture and finishes in the boys and girls changing rooms at the cellar.
M00671745-P3
08/08/2024
Filed — Alteration
Upgrades to the furniture and finishes in the boys and girls changing rooms at the cellar.
M00671745-P2
12/13/2023
Permit issued — Plumbing
M00671745-S1-PL
06/15/2023
Violation issued (ECB, open)
Construction
06/15/2023
Violation issued (ECB, closed)
Construction
06/15/2023
Violation issued (ECB, closed)
Construction
05/17/2023
Violation issued (ECB, closed)
Construction
03/28/2023
Permit issued — General Construction
M00671745-I1-GC
03/27/2023
Permit issued — General Construction
M00671745-I1-GC
12/15/2022
Permit issued — Plumbing
M00671745-S1-PL
12/14/2022
Permit issued — General Construction
M00671745-I1-GC
10/26/2022
Objection resolved — Addressed
08/26/2022
Objection raised — Other
08/25/2022
Filed — Alteration
Upgrades to the furniture and finishes in the boys and girls changing rooms at the cellar.
M00671745-P1
08/22/2022
Special inspection requirement — Post-installed Anchors
JACOB HAAS
08/22/2022
Special inspection requirement — Fire-Resistant Penetrations and Joints
JACOB HAAS
02/17/2022
Objection raised — Other
02/17/2022
Objection resolved — Addressed
02/17/2022
Objection raised — Other
02/17/2022
Objection resolved — Addressed
02/09/2022
Filed — Alteration
Upgrades to the furniture and finishes in the boys and girls changing rooms at the cellar.
M00671745-S1
02/03/2022
Filed — Alteration
Upgrades to the furniture and finishes in the boys and girls changing rooms at the cellar.
M00671745-I1
05/07/2021
Violation issued (ECB, closed)
Construction
05/07/2021
Violation issued (ECB, closed)
Construction
05/07/2021
Violation issued (ECB, closed)
Construction
05/07/2021
Violation issued (ECB, closed)
Construction
12/08/2020
Violation issued (ECB, closed)
Construction
Latest 60 of 99 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingSigned-offVarsity Plumbing and Heating12/12/2024
DOB NOWGeneral ConstructionSigned-offDRL Services08/20/2024
DOB NOWPlumbingSigned-offVarsity Plumbing and Heating12/13/2023
DOB NOWGeneral ConstructionSigned-offDRL Services03/28/2023
DOB NOWGeneral ConstructionSigned-offDRL Services03/27/2023
DOB NOWPlumbingSigned-offVarsity Plumbing and Heating12/15/2022
DOB NOWGeneral ConstructionSigned-offDRL Services12/14/2022
BISOTISSUEDAdam's European Contracting03/06/2026
BISOTISSUEDAdam's European Contracting03/06/2026
BISPLISSUEDVarsity Plumbing and Heating06/13/2025
BISMHISSUEDTameer06/05/2025
BISOTISSUEDAdam's European Contracting03/13/2025
BISOTISSUEDAdam's European Contracting03/13/2025
BISPLISSUEDVarsity Plumbing and Heating06/18/2024
BISMHISSUEDTameer06/13/2024
BISEQISSUEDAdam's European Contracting06/06/2024
BISEQISSUEDAdam's European Contracting06/06/2024
BISEQISSUEDAdam's European Contracting06/06/2024
BISEQISSUEDAdam's European Contracting06/06/2024
BISOTISSUEDAdam's European Contracting03/12/2024
BISOTISSUEDAdam's European Contracting03/12/2024
BISOTISSUEDAdam's European Contracting03/12/2024
BISPLISSUEDVarsity Plumbing and Heating06/23/2023
BISEQISSUEDAdam's European Contracting06/08/2023
BISEQISSUEDAdam's European Contracting06/08/2023
BISEQISSUEDAdam's European Contracting06/08/2023
BISEQISSUEDAdam's European Contracting06/08/2023
BISMHISSUEDTameer06/08/2023
BISOTISSUEDAdam's European Contracting03/14/2023
BISOTISSUEDAdam's European Contracting03/14/2023
BISPLISSUEDVarsity Plumbing and Heating06/28/2022
BISMHISSUEDTameer06/10/2022
BISEQISSUEDAdam's European Contracting06/06/2022
BISEQISSUEDAdam's European Contracting06/06/2022
BISEQISSUEDAdam's European Contracting06/06/2022
BISEQISSUEDAdam's European Contracting06/06/2022
BISOTISSUEDAdam's European Contracting03/21/2022
BISOTISSUEDAdam's European Contracting03/21/2022
BISMHISSUEDTameer01/28/2022
BISPLISSUEDVarsity Plumbing and Heating06/30/2021
+ 17 more permits on file
2 projects · most recent 07/14/2025
Air Conditioning Systems
FiledStatusContractorScopeMake / Model / Capacity
07/14/2025——Air Conditioning Systems
Cooling
Fujitsu FUJITSU - ASUA36TLAV2 34,000 BTU · Fan Coil Indoor ×13
FUJITSU - AOU120RLAVL 360,000 BTU · Vrf Outdoor ×4
07/10/2025——Air Conditioning Systems
Cooling
Fujitsu FUJITSU - ASUA36TLAV2 34,000 BTU · Fan Coil Indoor ×11
FUJITSU - AOU120RLAVL 360,000 BTU · Vrf Outdoor ×1
18 projects · most recent 02/04/2026
General Wiring
FiledStatusContractorScope
02/04/2026CompleteGemini Electric Co—
12/16/2025CompleteGemini Electric Co—
09/10/2025CompleteDVM Electrical ServicesGeneral Wiring
08/07/2025CompleteKLK Electric—
07/15/2025CompleteKLK ElectricGeneral Wiring
06/25/2024CompleteAnco Electl Contctng—
10/16/2023CompleteGemini Electric Co—
05/23/2023CompleteAnco Electl Contctng—
09/26/2022CompleteEnergize Elc'l CNTRGGeneral Wiring
06/07/2022CompleteAnco Electl ContctngGeneral Wiring
10/20/2021CompleteZiggy's Electrical Contng—
10/20/2021CompleteZiggy's Electrical Contng—
02/10/2021CompleteLevis Electr'l ContractingGeneral Wiring
06/12/2019CompleteSamco Electric—
05/16/2019Permit IssuedSamco Electric—
▾Field Inspections (DOB CAP) — 2
DateTypeResultReport
02/27/2025Pass-Final General Construction Non-Directive 14PassView ↗
11/26/2024Pass-Final PL - Up to 9 Requested FloorsPassView ↗
▾Special Inspection Requirements (DOB NOW) — 14
DateRequirementInspectorRole
07/07/2025Fire-Resistant Penetrations and JointsAsma Hashmispecial
07/07/2025Post-installed AnchorsAsma Hashmispecial
07/07/2025Mechanical SystemsAsma Hashmispecial
07/07/2025FinalAsma Hashmiprogress
07/02/2025Fire-Resistant Penetrations and Joints—special
07/02/2025Mechanical Systems—special
07/02/2025Post-installed Anchors—special
07/02/2025Final—progress
11/05/2024Fire-Resistant Penetrations and JointsJACOB HAASspecial
11/05/2024Post-installed AnchorsJACOB HAASspecial
10/31/2024Post-installed AnchorsJACOB HAASspecial
10/31/2024Fire-Resistant Penetrations and JointsJACOB HAASspecial
08/22/2022Post-installed AnchorsJACOB HAASspecial
08/22/2022Fire-Resistant Penetrations and JointsJACOB HAASspecial
▾Tenants in the building
TenantSpaceFloorsRenovation projects
P.S. 11: the Sarah J. Garnet Elementary SchoolEducationFloor 1
Project M01251835 Alteration · Approved · 07/14/2025
Project M01250747 Alteration · Approved · 07/10/2025
P.S. 11 ManhattanEducationSub-basement
Project M00671745 Alteration · LOC Issued · 02/03/2022
Names are taken automatically from the text of each project’s filed documents (title blocks and cover sheets) and screened to exclude owners, landlords and designers. They may be incomplete or wrong; check the filing.
▾Documents — 54 on file (BIS + DOB NOW)
▸Plans & Drawings8
▸DOB NOWPlans/Sketch8
09/02/2026M00671745-P4Request digital key ↗
09/02/2026M00671745-P3Request digital key ↗
09/02/2026M00671745-P2Request digital key ↗
Showing 3 of 8 on file for this type
▸Seals & Professional Certifications14
▸DOB NOWDPL-1: Design Professional Seal & Signature8
08/22/2026M01251835-I1Open ↗
08/13/2026M00671745-S1Open ↗
08/13/2026M00671745-P1Open ↗
Showing 3 of 8 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature6
08/28/2026M00671745-P4Open ↗
08/28/2026M00671745-P4Open ↗
08/27/2026M00671745-I1Open ↗
Showing 3 of 6 on file for this type
▸Environmental & Asbestos2
▸DOB NOWDEP ACP-20/ACP-21: Asbestos Project Conditional Completion Form/Asbestos Project Completion Form2
08/13/2026M00671745-S1Open ↗
08/13/2026M00671745-I1Open ↗
▸Approvals, Objections & Sign-offs20
▸DOB NOWFee Exempt Supporting Document - DOF ACRIS report or BIB letter8
08/13/2026M01251835-I1Open ↗
08/13/2026M00671745-P1Open ↗
08/13/2026M00671745-P2Open ↗
Showing 3 of 8 on file for this type
▸DOB NOWDesign Commission Approval City Owned (Exterior Work)8
08/13/2026M01251835-I1Open ↗
08/13/2026M01250747-I1Open ↗
08/13/2026M00671745-P2Open ↗
Showing 3 of 8 on file for this type
▸DOB NOWDesign Commission Sign Off City Owned (Exterior Work)2
08/13/2026M00671745-I1Open ↗
08/13/2026M00671745-S1Open ↗
▸DOB NOWDEP Variance (V5) letter2
08/13/2026M00671745-S1Open ↗
08/13/2026M00671745-I1Open ↗
▸Other Documents10
▸DOB NOWNYCSCA - BCC Plan Examination Transmittal6
08/13/2026M00671745-P1Open ↗
08/13/2026M00671745-S1Open ↗
08/13/2026M00671745-P2Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWProof of Historic Building2
08/13/2026M01250747-I1Open ↗
08/13/2026M01251835-I1Open ↗
▸DOB NOWNYCSCA Exhibit 22
08/13/2026M00671745-I1Open ↗
08/13/2026M00671745-S1Open ↗