Condo, office space
320 WEST 66TH STREET
MANHATTAN · BIN 1083025
💬 Discuss this project
1989Year Built
7Stories
RBBuilding Class
C4-2FZoning
474,496 sfGross Floor Area
2Units
LL97 Covered0 Open ViolationsFISP: SAFE
Condo, office space · Owner of record: 125 WEST END ASSOCIATES LLC · 99,015 sf lot · 4.79 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralElectricalMechanicalPlumbingFire ProtectionLandscapeGeneralOther
Roof32p · 14 filings · 20 docs
Bulkhead2p · 1 filing · 20 docs
Floor 717p · 7 filings · 20 docs
Floor 64p · 5 filings · 20 docs
Floor 54p · 6 filings · 20 docs
Floor 44p · 5 filings · 20 docs
Floor 37p · 7 filings · 20 docs
Floor 221p · 8 filings · 20 docs
Floor 16p · 7 filings · 20 docs
Mezzanine23p · 3 filings · 20 docs
Basement31p · 14 filings · 20 docs
1 job · most recent 01/03/2025
Air Conditioning Systems
FiledStatusContractorScope
01/03/2025——Air Conditioning Systems
11 jobs · most recent 12/19/2024
General Wiring
FiledStatusContractorScope
12/19/2024CompleteJSP ELECTL CNTNG CORPGeneral Wiring
05/31/2024CompleteAGIR ELEC'L LTD. D/B/AGeneral Wiring
05/18/2024CompleteAGIR ELEC'L LTD. D/B/AGeneral Wiring
04/23/2024CompleteJSP ELECTL CNTNG CORPGeneral Wiring
04/18/2024CompleteAGIR ELEC'L LTD. D/B/AGeneral Wiring
02/15/2024CompleteJSP ELECTL CNTNG CORP—
04/26/2022CompleteAGIR ELEC'L LTD. D/B/A—
10/12/2021CompleteTRANSEL ELEV. & ELEC. INCGeneral Wiring
02/10/2021CompleteNASH ELECTRIC SERVICES IN—
01/29/2021CompleteNASH ELECTRIC SERVICES IN—
04/26/2018CompleteSTANCO SYSTEM ELEC'L CONT—
2 jobs · most recent 09/27/2021
Scaffold Sidewalk Shed
FiledStatusContractorScope
09/27/2021Signed-offJJ MATTHEWS INCScaffold
04/27/2018Signed-offPJP INSTALLERS INCSidewalk Shed
Building Lifecycle
All (300)Filed (62)Permit Issued (54)Signed Off (42)Facade (FISP) (3)Violation (9)Inspection (38)Objection (62)Special Inspection (30)
06/29/2026
Signed off — Alteration
INSTALLATION OF A TEMPORARY SCAFFOLD AS PER PLANS DURING GENERAL CONSTRUCTION WORK. NO CHANGE IN USE, EGRESS OR OCCUPANCY. SCAFFOLD TO COMPLY WITH CHAPTER 33 OF NYC BUILDING CODE OF 2014.
M00600010-I1
10/09/2025
Signed off — Alteration
Filing for installation of water/sanitary plumbing fixtures, installation of lab gas including compressed air, vacuum, and specialty gas piping only to fixtures, ceiling utility panels and capped outlets. Sprinkler additions as per plans filed.
M01089738-I1
08/07/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
RICHARD GREENWALD
08/07/2025
Special inspection requirement — Sprinkler Systems
RICHARD GREENWALD
08/07/2025
Special inspection requirement — Post-installed Anchors
RICHARD GREENWALD
07/30/2025
Filed — Alteration
Filing for installation of water/sanitary plumbing fixtures, installation of lab gas including compressed air, vacuum, and specialty gas piping only to fixtures, ceiling utility panels and capped outlets. Sprinkler additions as per plans filed.
M01089738-P1
07/22/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
RICHARD GREENWALD
07/22/2025
Special inspection requirement — Sprinkler Systems
RICHARD GREENWALD
07/22/2025
Special inspection requirement — Post-installed Anchors
RICHARD GREENWALD
07/16/2025
Signed off — Alteration
M01089736-I1
07/11/2025
Signed off — Alteration
Domestic water and sanitary piping for new Lab sink, vacuum piping to new outlets.
M01117105-I1
07/02/2025
Signed off — Alteration
M01089733-I1
06/20/2025
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
06/20/2025
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
06/13/2025
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
05/19/2025
Inspection — Certified Sprinkler-SP-Fixtures-Finish
Certified
View inspection ↗
05/09/2025
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
03/13/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
01/24/2025
Signed off — Alteration
Fling for modifications associated ducts and piping of existing mechanical system for fit-out of shared space and conference rooms as per plans filed herewith. No change in use, egress, or occupancy under this application.
M00921369-I1
01/22/2025
Objection resolved — Addressed
01/21/2025
Objection resolved — Addressed
01/21/2025
Objection resolved — Addressed
01/17/2025
Objection raised — Scope
01/13/2025
Objection raised — Scope
01/13/2025
Objection raised — Energy
01/03/2025
Filed — Alteration
Filing for modifications to associated ducts and piping of existing mechanical system for fit-out of office and non-production laboratory as per plans filed herewith. No change in use, egress, or occupancy under this application.
M01149593-I1
12/30/2024
Filed — Alteration
M01149596-I1
12/27/2024
Filed — Alteration
INTERIOR FITOUT OF EXISTING COMMERCIAL BUILDING SHELL SPACE FOR USE AS OFFICE AND NON-PRODUCTION LABORATORY. NO CHANGE IN USE, EGRESS, OR OCCUPANCY IN THIS APPLICATION.
M01149592-I1
12/17/2024
Permit issued — General Construction
M01089733-I1-GC
12/13/2024
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
12/04/2024
Permit issued — Sprinklers
M01089738-I1-PL
12/02/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
12/02/2024
Special inspection requirement — Sprayed fire-resistant materials
12/02/2024
Special inspection requirement — Fire-Resistance Rated Construction
12/02/2024
Special inspection requirement — Final
11/29/2024
Permit issued — Sprinklers
M01089738-I1-EW-SP
11/27/2024
Permit issued — Mechanical Systems
M01089736-I1-MS
11/14/2024
Permit issued — Plumbing
M01117105-I1-PL
10/20/2024
Filed — Alteration
Domestic water and sanitary piping for new Lab sink, vacuum piping to new outlets.
M01117105-I1
10/07/2024
Signed off — Alteration
Filing for interior mechanical system additions and modifications as per plans filed herewith. Fit-out of half a floor for lab/office tenancy. No change in use, egress, or occupancy under this application.
M00921360-I1
09/25/2024
Filed — Alteration
Filing for installation of water/sanitary plumbing fixtures, installation of lab gas including compressed air, vacuum, and specialty gas piping only to fixtures, ceiling utility panels and capped outlets. Sprinkler additions as per plans filed.
M01089738-I1
09/20/2024
Signed off — Alteration
Interior fit-out of corridor and helix mezzanine, from L6.5 to Roof. No change in use, egress, or occupancy under this application.
M00921368-I1
09/19/2024
Filed — Alteration
M01089736-I1
09/18/2024
Signed off — Alteration
Structural and cold-formed steel framing for support of new built-up platforms over existing reinforced concrete slabs. No change in use, egress, or occupancy.
M00932914-I1
09/17/2024
Signed off — Alteration
Filing for interior Sprinkler and Plumbing modifications as per plans filed herewith. Fit-out of half a floor for lab/office tenancy. No change in use, egress, or occupancy under this application.
M00921932-I1
09/17/2024
Signed off — Alteration
Filing for sprinkler modifications to existing system for fit-out of shared space and conference rooms as per plans filed herewith. No change in use, egress, or occupancy under this application.
M00921370-I1
09/06/2024
Filed — Alteration
Filing for interior mechanical system additions and modifications as per plans filed herewith. Fit-out of half a floor for lab/office tenancy. No change in use, egress, or occupancy under this application.
M00921360-P2
09/06/2024
Special inspection requirement — Ventilation and air distribution system
RICHARD GREENWALD
09/06/2024
Special inspection requirement — HVAC-R and service water piping design and insulation
RICHARD GREENWALD
09/06/2024
Special inspection requirement — Duct leakage testing, insulation and design
RICHARD GREENWALD
09/06/2024
Special inspection requirement — Final
RICHARD GREENWALD
09/06/2024
Special inspection requirement — Lighting controls
RICHARD GREENWALD
09/06/2024
Special inspection requirement — Interior lighting power
RICHARD GREENWALD
09/06/2024
Special inspection requirement — Mechanical Systems
RICHARD GREENWALD
09/06/2024
Special inspection requirement — Post-installed Anchors
RICHARD GREENWALD
09/05/2024
Signed off — Alteration
Interior fit-out of the south half of L7 for lab/office use. No change in use, egress, or occupancy under this application.
M00921359-I1
09/04/2024
Filed — Alteration
M01089733-I1
09/03/2024
Special inspection requirement — Duct leakage testing, insulation and design
RICHARD GREENWALD
09/03/2024
Special inspection requirement — Lighting controls
RICHARD GREENWALD
09/03/2024
Special inspection requirement — Final
RICHARD GREENWALD
Latest 60 of 300 events.
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
125 WEST END ASSOCIATES26907/08/2026
JJ MATTHEWS INC503/22/2026
JRM CONSTRUCTION MGMT1103/22/2026
LYNDONVILLE MANAGEMENT103/22/2026
ABC3603/22/2026
OWNER OF PREMISES103/22/2026
TACONIC PARTNERS103/22/2026
TACONIC MANAGEMENT COMPANY803/21/2026
WALT DISNEY COMPANY1203/21/2026
AMERICAN BROADCASTING COS INC.4103/21/2026
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
A1 EXPEDITING SERVICE CORP.13403/21/2026
A1 EXPEDITING SERVICE3603/21/2026
AE DESIGN SOLUTION203/21/2026
PCS ENGINEERING303/21/2026
EUROCELT EXPEDITING, INC203/21/2026
LOMBARDO BUILDING CONSULTANTS403/21/2026
ROYAL CONSTRUCTION SERVICES203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
JRM CONSTRUCTION MGMT LLCGeneral Contractor4407/08/2026
S&E BRIDGE & SCAFFOLD LLC.General Contractor1807/08/2026
WALSH GLASS & METAL INCGeneral Contractor1107/08/2026
NEPTUNE MECHANICAL INCFire Protection1107/08/2026
RITE-WAY INTERNAL REMOVAL INCGeneral Contractor603/21/2026
NEPTUNE MECHANICAL INCPlumbing507/08/2026
PJP INSTALLERS INCGeneral Contractor307/08/2026
JJ MATTHEWS INCGeneral Contractor203/21/2026
KG SPRINKLER CORPFire Protection207/08/2026
ARCON PLBG SOLUTIONSPlumbing207/08/2026
A + SPRINKLER CORPFire Protection207/08/2026
A PLUS PLUMBING CORPPlumbing107/08/2026
LCS PLUMBING&CONSULT INCPlumbing107/08/2026
AGIR ELEC'L LTD. D/B/AElectrical103/22/2026
SERVICE SIGN ERECTORSScaffold107/08/2026
BATTAGLIA, FRANKElectrical103/21/2026
DEPAOLA, FRANKElectrical103/21/2026
GRILLO, ANTHONYElectrical103/21/2026
ISAKSEN, CHRISITANElectrical103/21/2026
KING, ARTHURElectrical103/21/2026
NASH ELECTRIC SERVICES INElectrical103/22/2026
PIMPINELLA, FRANKElectrical103/21/2026
TRANSEL ELEV. & ELEC. INCElectrical103/22/2026
PSI PARTNERS, LLCFire Protection107/08/2026
A & M WARSHAW PLBG & HTGPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
DELTA TESTING LABS6876907/30/2025
PCS ENGINEERING3745304/04/2022
SOUTH BAY ENGINEERING PLL6682104/28/2021
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionSigned-offJRM CONSTRUCTION MGMT LLC12/17/2024
DOB NOWSprinklersSigned-offA & M WARSHAW PLBG & HTG12/04/2024
DOB NOWSprinklersSigned-offMORA FIRE PROTECTION LLC11/29/2024
DOB NOWMechanical SystemsSigned-offJRM CONSTRUCTION MGMT LLC11/27/2024
DOB NOWPlumbingSigned-offATTENTION TO DETAIL P&H.I11/14/2024
DOB NOWStructuralSigned-offJRM CONSTRUCTION MGMT LLC05/30/2024
DOB NOWGeneral ConstructionSigned-offJRM CONSTRUCTION MGMT LLC05/10/2024
DOB NOWPlumbingSigned-offA PLUS PLUMBING CORP02/12/2024
DOB NOWSprinklersSigned-offA + SPRINKLER CORP02/09/2024
DOB NOWPlumbingSigned-offA + SPRINKLER CORP02/09/2024
DOB NOWMechanical SystemsSigned-offJRM CONSTRUCTION MGMT LLC01/10/2024
DOB NOWGeneral ConstructionSigned-offJRM CONSTRUCTION MGMT LLC01/10/2024
DOB NOWMechanical SystemsSigned-offJRM CONSTRUCTION MGMT LLC01/10/2024
DOB NOWMechanical SystemsSigned-offJRM CONSTRUCTION MGMT LLC07/26/2023
DOB NOWStructuralSigned-offJRM CONSTRUCTION MGMT LLC07/26/2023
DOB NOWSignSigned-offSERVICE SIGN ERECTORS CO06/14/2023
DOB NOWMechanical SystemsSigned-offJRM CONSTRUCTION MGMT LLC04/11/2023
DOB NOWStructuralSigned-offJRM CONSTRUCTION MGMT LLC04/06/2023
DOB NOWStandpipeSigned-offNEPTUNE MECHANICAL INC03/24/2023
DOB NOWStandpipeSigned-offNEPTUNE MECHANICAL INC03/24/2023
DOB NOWPlumbingSigned-offNEPTUNE MECHANICAL INC03/24/2023
DOB NOWMechanical SystemsSigned-offJRM CONSTRUCTION MGMT LLC01/23/2023
DOB NOWMechanical SystemsSigned-offJRM CONSTRUCTION MGMT LLC01/23/2023
DOB NOWGeneral ConstructionSigned-offJRM CONSTRUCTION MGMT LLC01/23/2023
DOB NOWProtection and Mechanical MethodsSigned-offWALSH GLASS & METAL INC01/10/2023
DOB NOWProtection and Mechanical MethodsSigned-offWALSH GLASS & METAL INC01/10/2023
DOB NOWConstruction FenceSigned-offS&E BRIDGE & SCAFFOLD LLC01/05/2023
DOB NOWBoiler EquipmentSigned-offSTUART N SCHWARTZ10/27/2022
DOB NOWPlumbingSigned-offNEPTUNE MECHANICAL INC10/17/2022
DOB NOWProtection and Mechanical MethodsSigned-offS&E BRIDGE & SCAFFOLD LLC10/04/2022
DOB NOWStructuralSigned-offJRM CONSTRUCTION MGMT LLC09/24/2022
DOB NOWStructuralSigned-offJRM CONSTRUCTION MGMT LLC06/15/2022
DOB NOWSprinklersSigned-offNEPTUNE MECHANICAL INC05/02/2022
DOB NOWSprinklersSigned-offNEPTUNE MECHANICAL INC05/02/2022
DOB NOWMechanical SystemsSigned-offJRM CONSTRUCTION MGMT LLC04/18/2022
DOB NOWPlumbingSigned-offNEPTUNE MECHANICAL INC04/18/2022
DOB NOWPlumbingSigned-offNEPTUNE MECHANICAL INC04/18/2022
DOB NOWMechanical SystemsSigned-offJRM CONSTRUCTION MGMT LLC04/18/2022
DOB NOWStructuralSigned-offJRM CONSTRUCTION MGMT LLC04/08/2022
DOB NOWBoiler EquipmentSigned-offSTUART N SCHWARTZ04/04/2022
+ 60 more permits on file
▾Field Inspections (DOB CAP) — 38
DateTypeResultReport
06/20/2025Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
06/20/2025Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
06/13/2025Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
05/19/2025Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
05/09/2025Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
03/13/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
12/13/2024Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
08/28/2024Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
08/28/2024Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
08/26/2024Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
08/22/2024Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
06/10/2024Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
06/07/2024Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
05/20/2024Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
10/11/2023Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
10/05/2023Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
05/04/2023Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
04/25/2023Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
04/20/2023Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
04/13/2023Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
04/11/2023Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
04/06/2023Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
03/21/2023Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
03/14/2023Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
02/27/2023Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
Latest 25 of 38.
▾Special Inspection Requirements (DOB NOW) — 150
DateRequirementInspectorRole
08/07/2025Sprinkler SystemsRICHARD GREENWALDspecial
08/07/2025Post-installed AnchorsRICHARD GREENWALDspecial
08/07/2025Fire-Resistant Penetrations and JointsRICHARD GREENWALDspecial
07/22/2025Sprinkler SystemsRICHARD GREENWALDspecial
07/22/2025Fire-Resistant Penetrations and JointsRICHARD GREENWALDspecial
07/22/2025Post-installed AnchorsRICHARD GREENWALDspecial
12/02/2024Final—progress
12/02/2024Sprayed fire-resistant materials—special
12/02/2024Fire-Resistant Penetrations and Joints—special
12/02/2024Fire-Resistance Rated Construction—progress
09/06/2024Ventilation and air distribution systemRICHARD GREENWALDenergy_progress
09/06/2024Lighting controlsRICHARD GREENWALDenergy_progress
09/06/2024Post-installed AnchorsRICHARD GREENWALDspecial
09/06/2024FinalRICHARD GREENWALDprogress
09/06/2024HVAC-R and service water piping design and insulationRICHARD GREENWALDenergy_progress
09/06/2024Duct leakage testing, insulation and designRICHARD GREENWALDenergy_progress
09/06/2024Mechanical SystemsRICHARD GREENWALDspecial
09/06/2024Interior lighting powerRICHARD GREENWALDenergy_progress
09/03/2024Mechanical SystemsRICHARD GREENWALDspecial
09/03/2024Ventilation and air distribution systemRICHARD GREENWALDenergy_progress
09/03/2024Interior lighting powerRICHARD GREENWALDenergy_progress
09/03/2024Duct leakage testing, insulation and designRICHARD GREENWALDenergy_progress
09/03/2024Lighting controlsRICHARD GREENWALDenergy_progress
09/03/2024HVAC-R and service water piping design and insulationRICHARD GREENWALDenergy_progress
09/03/2024FinalRICHARD GREENWALDprogress
Latest 25 of 150.
▾Documents — 1,599 on file (BIS + DOB NOW)
▸Plans & Drawings102
▸DOB NOWPlans/Sketch52
09/06/2026M00038570-I1Request digital key ↗
09/03/2026M00507888-I1Request digital key ↗
09/03/2026M00582629-I1Request digital key ↗
Showing 3 of 52 on file for this type
▸DOB NOWPlans/Sketch - Standpipe7
09/04/2026M00418519-I1Request digital key ↗
09/01/2026M00427956-I1Request digital key ↗
09/01/2026M00427956-P3Request digital key ↗
Showing 3 of 7 on file for this type
▸DOB NOWPlans/Sketch - Plumbing6
09/03/2026M00418484-I1Request digital key ↗
09/01/2026M00427956-I1Request digital key ↗
09/01/2026M00427956-P3Request digital key ↗
Showing 3 of 6 on file for this type
▸DOB NOWPlans/Sketch - Sprinkler5
09/04/2026M00418494-I1Request digital key ↗
09/01/2026M00427956-I1Request digital key ↗
09/01/2026M00427956-P3Request digital key ↗
Showing 3 of 5 on file for this type
▸DOB NOWPlans/Sketch - Sidewalk Shed5
09/02/2026M00462905-P3Request digital key ↗
09/02/2026M00462905-P2Request digital key ↗
09/02/2026M00462905-P4Request digital key ↗
Showing 3 of 5 on file for this type
▸DOB NOWPlans/Sketch - Mechanical Systems5
09/03/2026M00427966-P1Request digital key ↗
09/03/2026M00427966-P3Request digital key ↗
09/03/2026M00427966-P2Request digital key ↗
Showing 3 of 5 on file for this type
▸DOB NOWPlans/Sketch - Protection of Mechanical Methods4
09/03/2026M00467705-P3Request digital key ↗
09/03/2026M00467705-P1Request digital key ↗
09/03/2026M00467705-I1Request digital key ↗
Showing 3 of 4 on file for this type
▸DOB NOWPlans/Sketch - Structural4
09/03/2026M00427981-P5Request digital key ↗
09/03/2026M00427981-I1Request digital key ↗
Showing 2 of 4 on file for this type
▸DOB NOWPlans/Sketch - Construction Fence4
09/04/2026M00462916-P2Request digital key ↗
09/04/2026M00462916-I1Request digital key ↗
09/04/2026M00462916-P3Request digital key ↗
Showing 3 of 4 on file for this type
▸DOB NOWPlans/Sketch - Boiler Equipment4
09/04/2026M00427930-I1Request digital key ↗
09/01/2026M00427919-P1Request digital key ↗
09/01/2026M00427919-I1Request digital key ↗
Showing 3 of 4 on file for this type
▸DOB NOWPlans/Sketch - Supported Scaffold3
09/03/2026M00462924-I1Request digital key ↗
09/03/2026M00462924-P1Request digital key ↗
09/03/2026M00462924-P2Request digital key ↗
▸DOB NOWPlans/Sketch - Place of Assembly2
09/02/2026M00710489-P1Request digital key ↗
Showing 1 of 2 on file for this type
▸DOB NOWPlans/Sketch - Temporary Place of Assembly1
08/30/2026M00893811-I1Request digital key ↗
▸Applications & Permits235
▸BISPLAN / WORK APPROVAL APPLICATION168
01/03/2025123725184Open ↗
12/30/2024123725184Open ↗
12/26/2024123725184Open ↗
Showing 3 of 168 on file for this type
▸BISWORK PERMIT APPLICATION60
04/21/2022140983390Open ↗
03/16/2021140999123Open ↗
03/12/2021140983390Open ↗
Showing 3 of 60 on file for this type
▸BISPLACE OF ASSEMBLY5
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 5 on file for this type
▸BISCERTIFICATE OF OCCUPANCY: APPLICATION2
10/03/2022123725184Open ↗
Showing 1 of 2 on file for this type
▸Seals & Professional Certifications538
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION128
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 128 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature128
09/23/2026M01089738-I1Open ↗
09/23/2026M00427930-I1Open ↗
09/23/2026M01089738-I1Open ↗
Showing 3 of 128 on file for this type
▸DOB NOWProgress Inspector Seal & Signature94
09/07/2026M00921369-I1Open ↗
09/07/2026M00921369-I1Open ↗
09/07/2026M00921369-I1Open ↗
Showing 3 of 94 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature93
09/06/2026M00038570-I1Open ↗
09/04/2026M00418519-I1Open ↗
09/04/2026M00418472-I1Open ↗
Showing 3 of 93 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST38
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 38 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM34
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 34 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT13
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 13 on file for this type
▸BISAPPLICANT OWNER SIGNATURE5
03/09/2021140999123Open ↗
11/27/2020140983390Open ↗
Showing 2 of 5 on file for this type
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY3
11/27/2020140983390Open ↗
Showing 1 of 3 on file for this type
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸Trade Schedules & Equipment105
▸BISSELF-CERT PLUMBING NOTICE33
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 33 on file for this type
▸BISFA - FDNY APPROVAL : FD-FAA23
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 23 on file for this type
▸BISSCHEDULE B - PLUMBING19
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 19 on file for this type
▸BISEQUIPMENT USE PERMITS12
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 12 on file for this type
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE10
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 10 on file for this type
▸BISEQUIPMENT USE APPLICATION-PERMIT4
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 4 on file for this type
▸BISSPRINKLER INSP REPORT : FP-852
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISSTANDPIPE ALARM DRAWINGS & AI1 (OR AI1 PROOF)1
03/12/2021140983390Open ↗
▸BISFIRE PROTECTION PLAN(FPP): FDNY APPROVAL1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Safety & Tenant Protection5
▸BISSTREET TREE CHECKLIST3
11/02/2023123725184Open ↗
Showing 1 of 3 on file for this type
▸BISTENANT PROTECTION PLAN AND NOTES2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸Environmental & Asbestos89
▸BISASBESTOS: CERTIFICATION (DEP ACP5)31
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 31 on file for this type
▸DOB NOWDEP ACP-20/ACP-21: Asbestos Project Conditional Completion Form/Asbestos Project Completion Form25
09/03/2026M00427981-I1Open ↗
09/01/2026M00427919-I1Open ↗
08/31/2026M00859133-I1Open ↗
Showing 3 of 25 on file for this type
▸DOB NOWDEP ACP-5: Asbestos Assessment Report16
09/02/2026M00633171-I1Open ↗
09/01/2026M00628720-P1Open ↗
09/01/2026M00628720-I1Open ↗
Showing 3 of 16 on file for this type
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'12
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 12 on file for this type
▸BISAPPLICANT SHALL PROVIDE 1 ACP-21 FORMPRIOR TO SIGN OFF: TRU0010MN212
11/13/2024123725184Open ↗
05/21/2024140983390Open ↗
▸BISDEP ASBESTOS PROJECT COMPLETION FORM2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISASBESTOS EXEMPTION CERTIFICATION LETTER1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Energy Compliance66
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS32
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 32 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS12
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 12 on file for this type
▸BISTR8: Energy Code Progress Inspections11
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 11 on file for this type
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY5
09/21/2023123725184Open ↗
11/27/2020140983390Open ↗
Showing 2 of 5 on file for this type
▸DOB NOWPreliminary Commissioning Report Certification2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸DOB NOWEN2: As Built Energy Analysis2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISENERGY CODE COMPLIANCE INSPECTIONS1
05/22/2023140983390Open ↗
▸BISEXTERIOR LIGHTING POWER1
05/22/2023140983390Open ↗
▸Inspections & Test Reports35
▸BISTECHNICAL REPORT: RESPONSIBILITY21
01/21/2026121618231Open ↗
02/26/2025121618231Open ↗
05/16/2024140983390Open ↗
Showing 3 of 21 on file for this type
▸BISHYDRAULIC FLOW CALCULATIONS3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸BISFIRE-RESISTANT PENETRATIONS AND JOINTS (FIRESTOP)2
04/03/2024123725184Open ↗
05/22/2023140983390Open ↗
▸BISSTRUCTURAL STEEL - WELDING2
02/28/2025121618231Open ↗
12/19/2022140983390Open ↗
▸BISCONCRETE - CAST-IN-PLACE2
02/28/2025121618231Open ↗
12/19/2022140983390Open ↗
▸BISSPRAYED FIRE-RESISTANT MATERIALS2
02/02/2023123725184Open ↗
12/19/2022140983390Open ↗
▸BISSTRUCTURAL STEEL - HIGH STRENGTH BOLTING2
02/28/2025121618231Open ↗
12/19/2022140983390Open ↗
▸DOB NOWConcrete Testing Exception Report1
09/03/2026M00427981-I1Open ↗
▸Approvals, Objections & Sign-offs152
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST78
01/22/2026121618231Open ↗
05/22/2024140983390Open ↗
08/22/2023102709954Open ↗
Showing 3 of 78 on file for this type
▸BISSCHEDULE A - OCCUPANCY / USE35
01/03/2025123725184Open ↗
12/30/2024123725184Open ↗
12/26/2024123725184Open ↗
Showing 3 of 35 on file for this type
▸BISADMINISTRATIVE OBJECTIONS24
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 24 on file for this type
▸DOB NOWDEP Variance (V5) letter10
09/03/2026M00427981-I1Open ↗
Showing 1 of 10 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION5
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 5 on file for this type
▸Cost, Insurance & Ownership101
▸BISCOST AFFIDAVIT95
09/21/2023123725184Open ↗
08/22/2023100893507Open ↗
08/22/2023102709954Open ↗
Showing 3 of 95 on file for this type
▸BISCOST AFFIDAVIT (FINAL): PW34
12/20/2024121618231Open ↗
08/21/2023104219301Open ↗
07/20/2023140983390Open ↗
Showing 3 of 4 on file for this type
▸BISPROJECT-SPECIFIC GL INSURANCE2
04/21/2022140983390Open ↗
03/10/2021140983390Open ↗
▸Filing & Intake Forms117
▸BISEFILING COVER SHEET53
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 53 on file for this type
▸BISADDITIONAL INFORMATION33
01/09/2025123725184Open ↗
11/02/2023123725184Open ↗
05/23/2023140983390Open ↗
Showing 3 of 33 on file for this type
▸BISBOROUGH INTAKE FORM23
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 23 on file for this type
▸BISEFILING JOB APPLICATION COVER SHEET7
03/09/2021140999123Open ↗
11/27/2020140983390Open ↗
Showing 2 of 7 on file for this type
▸DOB NOWAI1 Form (from plan PDF)1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Other Documents28
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION18
04/21/2022140983390Open ↗
04/21/2022140983390Open ↗
09/23/2020123922960Open ↗
Showing 3 of 18 on file for this type
▸BISPLOT DIAGRAM4
09/21/2023123725184Open ↗
Showing 1 of 4 on file for this type
▸DOB NOWAlternate Plan 12
09/02/2026M00710489-P1Open ↗
Showing 1 of 2 on file for this type
▸DOB NOWAlternate Plan 22
09/02/2026M00710489-P1Open ↗
Showing 1 of 2 on file for this type
▸BISVERIFY DOB PLAN NAMING STANDARD IS MET1
09/28/2020123922960Open ↗
▸BISLUMINOUS EGRESS PATH MARKINGS1
05/22/2023140983390Open ↗