Roof13p · 17 filings · 20 docs
ArchitectureDMEquipmentFire ProtectionGeneralMechanicalPlumbingStructuralOther
Issued Permit Scope
Boiler Equipment · General Construction · Mechanical Systems · Plumbing · Protection and Mechanical Methods · Sprinklers · Standpipe · Structural · Supported Scaffold
Installation of supplemental heating/cooling units to serve corridors and an AV closet.
On file for this project
3 documents · 2 drawing sheets
Filing for structural steel framing for extension of screen wall at roof as per plans filed herewith. Estimated costs included in M00427981-I1, unable to file PAA due to DOB NOW technical errors.
On file for this project
8 documents · 2 drawing sheets
Filing for the installation of new HVAC equipment as per plans filed herewith. No change to use, egress or occupancy under this application.
On file for this project
41 documents · 7 drawing sheets
Latest 3 of 17 filings on this floor.
Floor 713p · 23 filings · 20 docs
ArchitectureEquipmentFire ProtectionGeneralMechanicalPlumbingStructuralOther
Issued Permit Scope
Boiler Equipment · General Construction · Mechanical Systems · Plumbing · Protection and Mechanical Methods · Sprinklers · Standpipe · Structural
INTERIOR FITOUT OF EXISTING COMMERCIAL BUILDING SHELL SPACE FOR USE AS OFFICE AND NON PRODUCTION LABORATORY. NO CHANGE IN USE, EGRESS, OR OCCUPANCY IN THIS APPLICATION.
On file for this project
3 documents · 10 drawing sheets
Filing for installation of water/sanitary plumbing fixtures, installation of lab gas including compressed air, vacuum, and specialty gas piping only to fixtures, ceiling utility panels and capped outlets. Sprinkler additions as per plans filed.
On file for this project
11 documents
Filing for modifications to associated ducts and piping of existing mechanical system for fit-out of office and non-production laboratory as per plans filed herewith. No change in use, egress, or occupancy under this application.
On file for this project
3 documents
Latest 3 of 23 filings on this floor.
Floor 613p · 12 filings · 20 docs
ArchitectureEquipmentFire ProtectionGeneralMechanicalPlumbingStructural
Issued Permit Scope
Boiler Equipment · General Construction · Mechanical Systems · Plumbing · Protection and Mechanical Methods · Sprinklers · Standpipe · Structural
Filing for the installation of new HVAC equipment as per plans filed herewith. No change to use, egress or occupancy under this application.
On file for this project
41 documents · 1 drawing sheet
INSTALLATION AND USE OF MINI CRANE AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
On file for this project
2 documents
INSTALLATION AND USE OF MINI CRANE AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
On file for this project
2 documents
Latest 3 of 12 filings on this floor.
Floor 513p · 12 filings · 20 docs
ArchitectureEquipmentFire ProtectionGeneralMechanicalPlumbingStructural
Issued Permit Scope
Boiler Equipment · General Construction · Mechanical Systems · Plumbing · Protection and Mechanical Methods · Sprinklers · Standpipe · Structural
Filing for the installation of new HVAC equipment as per plans filed herewith. No change to use, egress or occupancy under this application.
On file for this project
41 documents · 1 drawing sheet
INSTALLATION AND USE OF MINI CRANE AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
On file for this project
2 documents
INSTALLATION AND USE OF MINI CRANE AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
On file for this project
2 documents
Latest 3 of 12 filings on this floor.
Floor 413p · 12 filings · 20 docs
ArchitectureEquipmentFire ProtectionGeneralMechanicalPlumbingStructuralOther
Issued Permit Scope
Boiler Equipment · General Construction · Mechanical Systems · Plumbing · Protection and Mechanical Methods · Sprinklers · Standpipe · Structural
Filing for the installation of new HVAC equipment as per plans filed herewith. No change to use, egress or occupancy under this application.
On file for this project
41 documents · 1 drawing sheet
INSTALLATION AND USE OF MINI CRANE AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
On file for this project
2 documents
INSTALLATION AND USE OF MINI CRANE AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
On file for this project
2 documents
Latest 3 of 12 filings on this floor.
Floor 313p · 16 filings · 20 docs
ArchitectureEquipmentFire ProtectionGeneralMechanicalPlumbingStructural
Issued Permit Scope
Boiler Equipment · General Construction · Mechanical Systems · Plumbing · Protection and Mechanical Methods · Sprinklers · Standpipe · Structural
Filing for the installation of new HVAC equipment as per plans filed herewith. No change to use, egress or occupancy under this application.
On file for this project
41 documents · 1 drawing sheet
Filing for structural modifications, specifically built-up cold formed steel platforms and framing, and miscellaneous steel for the stairs and lift as per plans filed herewith. No change to use, egress or occupancy under this application.
On file for this project
11 documents
Filing for HVAC modifications as per plans filed herewith. No change to use, egress or occupancy under this application.
On file for this project
26 documents
Latest 3 of 16 filings on this floor.
Floor 213p · 12 filings · 20 docs
ArchitectureElectricalEquipmentFire ProtectionGeneralMechanicalPlumbingStructural
Issued Permit Scope
Boiler Equipment · General Construction · Mechanical Systems · Plumbing · Protection and Mechanical Methods · Sprinklers · Standpipe · Structural
Filing for the installation of new HVAC equipment as per plans filed herewith. No change to use, egress or occupancy under this application.
On file for this project
41 documents · 1 drawing sheet
INSTALLATION AND USE OF MINI CRANE AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
On file for this project
2 documents
INSTALLATION AND USE OF MINI CRANE AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
On file for this project
2 documents
Latest 3 of 12 filings on this floor.
Floor 113p · 14 filings · 20 docs
ArchitectureEquipmentFire ProtectionGeneralMechanicalPlumbingStructural
Issued Permit Scope
Boiler Equipment · General Construction · Mechanical Systems · Plumbing · Protection and Mechanical Methods · Sprinklers · Standpipe · Structural
Installation of supplemental heating/cooling units to serve corridors and an AV closet.
On file for this project
3 documents · 1 drawing sheet
Filing for the installation of new HVAC equipment as per plans filed herewith. No change to use, egress or occupancy under this application.
On file for this project
41 documents · 1 drawing sheet
INSTALLATION AND USE OF MINI CRANE AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
On file for this project
2 documents
Latest 3 of 14 filings on this floor.
Mezzanine184p · 8 filings · 20 docs
ArchitectureElectricalFire ProtectionGeneralLandscapeMechanicalPlumbingStructural
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing · Sprinklers · Structural
Structural and cold-formed steel framing for support of new built-up platforms over existing reinforced concrete slabs. No change in use, egress, or occupancy.
On file for this project
7 documents
Interior fit-out of corridor and helix mezzanine, from L6.5 to Roof. No change in use, egress, or occupancy under this application.
On file for this project
7 documents
Filing for sprinkler modifications to existing system for fit-out of shared space and conference rooms as per plans filed herewith. No change in use, egress, or occupancy under this application.
On file for this project
16 documents
Latest 3 of 8 filings on this floor.
Basement13p · 5 filings · 20 docs
ArchitectureElectricalFire ProtectionGeneralMechanicalStructuralOther
Filing for modifications to existing plumbing fixtures, sprinkler heads and standpipe system as per plans filed herewith. No change to use, egress or occupancy under this application.
On file for this project
13 documents · 2 drawing sheets
Filing for interior renovation in the Fitout of Basement Tenant Space with Conference Center as per plans filed herewith. No change to use, egress or occupancy under this application.
On file for this project
15 documents · 4 drawing sheets
Filing for HVAC modifications as per plans filed herewith. No change to use, egress or occupancy under this application.
On file for this project
25 documents · 1 drawing sheet
Latest 3 of 5 filings on this floor.
Sub-Basement13p · 17 filings · 20 docs
ArchitectureFire ProtectionGeneralMechanicalPlumbingStructural
Issued Permit Scope
Boiler Equipment · General Construction · Mechanical Systems · Plumbing · Sprinklers · Standpipe · Structural
Installation of supplemental heating/cooling units to serve corridors and an AV closet.
On file for this project
3 documents
Filing for the installation of new HVAC equipment as per plans filed herewith. No change to use, egress or occupancy under this application.
On file for this project
41 documents
Filing for modifications to existing plumbing fixtures, sprinkler heads and standpipe system as per plans filed herewith. No change to use, egress or occupancy under this application.
On file for this project
13 documents
Latest 3 of 17 filings on this floor.
Site & exterior55p · 8 filings · 20 docs
ArchitectureElectricalEquipmentGeneralMechanicalPlumbingStructuralOther
Issued Permit Scope
Construction Fence · Protection and Mechanical Methods · Sidewalk Shed · Sign · Supported Scaffold
Propose to install non-advertising sign. No change in use, egress, or occupancy.
On file for this project
2 documents · 2 drawing sheets
INSTALLATION OF CONSTRUCTION FENCE AS PER DRAWINGS. CONSTRUCTION FENCE SHALL COMPLY WITH CH #33 OF THE NYC BC. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
On file for this project
10 documents · 12 drawing sheets
INSTALLATION OF SUSPENDED SCAFFOLD AS SHOWN ON PLANS
On file for this project
8 documents · 5 drawing sheets
Latest 3 of 8 filings on this floor.
Filed — no permit issued41p · 3 filings · 9 docs
ArchitectureFire ProtectionGeneralPlumbing
Filing for modifications to associated ducts and piping of existing mechanical system for fit-out of office and non-production laboratory as per plans filed herewith. No change in use, egress, or occupancy under this application.
On file for this project
3 documents
No filed description on record for this project.
On file for this project
3 documents · 12 drawing sheets
INTERIOR FITOUT OF EXISTING COMMERCIAL BUILDING SHELL SPACE FOR USE AS OFFICE AND NON-PRODUCTION LABORATORY. NO CHANGE IN USE, EGRESS, OR OCCUPANCY IN THIS APPLICATION.
On file for this project
3 documents · 12 drawing sheets