ECB05/19/2026FAILURE TO COMPLY WITH THE COMMISSIONER'S ORDER TO FILE A CERTIFICATE OF CORRECTION WITH THE DEPARTMENT OF BUILDINGS. NO CERTIFICATE OF CORRECTION ON FILE FOR VIO#39151450Z AS OF 5/19/2026., FILE A CERTIFICATE$1K due
ECB06/16/2025UNLAWFULLY CONTINUED WORK WHILE ON NOTICE OF A STOP WORK ORDER. AT TIME OF INSPECTION, OBSERVED THE WOOD FRAMING/PLYWOOD SHEATHING FOR ROOF, WALLS AT EXP1, EXP2, EXP3, AND EXP4 HAS BEEN REMOVED WHILE FULL STOP$25K due
ECB06/16/2025TAMPERED WITH, REMOVED OR DEFACED A WRITTEN POSTED STOP WORK ORDER. AT TIME OF INSPECTION, OBSERVED THE STOP WORK ORDER HAS BEEN REMOVED. NOTICE WAS PLACES LEFT OF THE FRONT ENTRY DOOR OF THE BUILDING ON 6/10/2$25K due
ECB06/10/2025WORK WITHOUT PERMIT. AT TIME OF INSPECTION, OBSERVED LARGE WOOD FRAMED STRUCTURE BUILT ON TOP OF ONE STORY BUILDING. NO PERMITS OR RECORDS ON BIS/DOB NOW FOR WORK OBSERVED. WORK APPEARS INCOMPLETE APPROX. 20%,$12K due
ECB11/03/2021OCCUPANCY CONTRARY TO THAT ALLOWED BY CERTIFICATE OF OCCUPANCY OR BUILDING DEPT RECORDS.NOTED:AT TIME OF INSPECTION OBSERVED THAT SECOND AND 3RD FLOORS BEING OCCUPIED AS SOCIAL CLUB WITH TABLES CHAIRS TVS AND A$2K due
ECB11/03/2021FAILURE TO PROVIDE UNOBSTRUCTED EXIT PASSAGEWAY.NOTED:AT TIME OF INSPECTION OBSERVED FIRE ESCAPE LADDER AT 3RD FLOOR ROOF LEVEL BEING PARTIALLY OBSTRUCTED BY TWO FOLDING TABLES TOWARD BOTTOM OF LADDER. REMEDY:R$1K due
HPD01/20/2004§ 27-2005 ADMIN. CODE: PROPERLY SECURE THE LOOSE BALUSTRADE PUBLIC HALL 2ND STORY
HPD01/20/2004§ 27-2005 ADMIN. CODE: FIRE ESCAPE DEFECTIVE. PROPERLY SECURE SCUTTLE LADDER FROM 2ND PUBLIC HALL TO ROOF
HPD01/20/2004§ 27-2013 ADMIN. CODE: PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT CEILING AND WALLS OF 2ND STORY PUBLIC HALL
HPD01/20/2004§ 27-2005 ADMIN. CODE: PROPERLY SECURE THE LOOSE HANDRAIL STAIRS 1 TO 2ND STORY PUBLIC HALL
HPD07/17/2002§ 27-2005 ADMIN. CODE: REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN UNIFORM COLOR CEILING IN THE BATHROOM LOCATED AT APT 1, 1st STORY
HPD07/17/2002§ 27-2005 ADMIN. CODE: PROPERLY REPAIR THE BROKEN OR DEFECTIVE DOOR BELL SYSTEM ,BLDG ENTRANCE TO APT LOCATED AT APT 1, 1st STORY
HPD07/17/2002§ 27-2005,2007 ADMON. CODE: FIRE EGRESS DEFECTIVE. REMOVE OBSTRUCTING BARS OR GATES FROM AT LEAST 1 WINDOW. SOUTHEAST ROOM LOCATED AT APT 1, 2nd STORY
HPD07/17/2002§ 27-2005 ADMIN. CODE: PROPERLY REPAIR THE BROKEN OR DEFECTIVE OVEN ,GAS RANGE IN THE KITCHEN LOCATED AT APT 1, 1st STORY
HPD07/17/2002§ 27-2005 ADMIN. CODE: PROPERLY REPAIR THE BROKEN OR DEFECTIVE COUNTER BALANCES UPPER AND LOWER WINDOW SASH IN THE KITCHEN LOCATED AT APT 1, 1st STORY
HPD07/17/2002§ 27-2005 ADMIN. CODE: REPLACE WITH NEW THE MISSING CENTER CONTROL KNOB SHOWER BODY IN THE BATHROOM LOCATED AT APT 1, 1st STORY
ECB05/19/2026FAILURE TO COMPLY WITH THE COMMISSIONER'S ORDER TO FILE A CERTIFICATE OF CORRECTION WITH THE DEPARTMENT OF BUILDINGS. NO CERTIFICATE OF CORRECTION ON FILE FOR VIO#39151451K AS OF 5/19/2026., FILE A CERTIFICATEHearing held — result not yet published$1K proposed
ECB05/19/2026UNLAWFUL ACTS. FAILURE TO COMPLY WITH COMMISSIONER'S ORDER. FOR WORK WITHOUT A PERMIT FOR VIO#39150596R ,NO PERMIT ON FILE AS OF 5/19/2026., COMPLY WITH COMMISSIONER'S ORDERHearing held — result not yet published$2K proposed
ECB06/23/2017UNLAWFULLY CONTINUED WORK WHILE ON NOTICE OF 9WO. NOTED: 1-FULL SIZE #113010C1702TB786977 ISSUED 11/30/10; 2-OBSERVED CONSTRUCTION ACTIVITIES ON 3RD FLOOR (THROUGH WINDOWS) ACCESS INSIDE DENITED BY WORKER. WORNothing owed — awaiting certificate of correction
ECB02/17/2017UNLAWFULLY CONTINUED WORK WHILE ON NOTICE OF A STOP WORK ORDER. NOTED:FULL STOP WORK ORDER EXISTS ON THIS PROPERTY(SWO#113010C1702JB286977).OBSERVED: 2 WORKERS ERECTING DRYWALL PARTITION AT THE 2ND FL OBSERVEDNothing owed — awaiting certificate of correction
ECB06/04/2016FAILURE TO PROVIDE UNOBSTRUCTED EXIT PASSAGEWAY.OBSERVED REAR FIRE ESCAPE PROVIDING EGRESS FOR 2ND&3RD FLR BLOCKED BY ROOF W.HANDRAIL AROUNDW/O LADDER TO PROVIDE EGRESS TO STREET/SIDEWALK-GROUND LEVEL.OBSERVEDNothing owed — awaiting certificate of correction
ECB06/04/2016UNLAWFULLY CONTINUED WORK WHILE ON NOTICE OF A SWO.OBSERVED EXTENSION @EXP#3 OF PROPERTY APPROX 22'X50' W.NEWLY POURED CONCRETE ROOF.OBSERVED NEW CONCRETE BLOCK &A STEEL I BEAM @REAR TOP OF EXTENSION.OBSERVED 3Nothing owed — awaiting certificate of correction
ECB01/16/2015FAILURE TO MAINTAIN BUILDING WALL(S) OR APPURTENANCES NOTED: AT REAR OF PREMISES AT THE 2ND AND 3RD FLRS SECONDARY EGRESS HAS BEEN COMPROMISED,IN THAT THE OWNER HAS FAILE DTO MAINTAIN THE FIRE ESCAPE DROP DOWNNothing owed — awaiting certificate of correction
Predominantly retail with other uses · Owner of record: 3202 CHURCH LLC. · 2,666 sf lot · 1.47 FAR built · Flood zone X