← Back
BuildNYC
Cape Cod
3203 PARSIFAL PLACE
BRONX · BIN 2075250
💬 Discuss this project
1945Year Built
1.67Stories
A0Building Class
R3AZoning
1,078 sfGross Floor Area
1Units
Cape Cod · 3,271 sf lot · 0.33 FAR built · Flood zone X
Locations of Work
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Attic1 filing · 20 docs
Floor 21 filing · 20 docs
Floor 1Mechanical ventilation for bathrooms and kitchenettes2 filings · 20 docs
CellarMechanical ventilation for bathrooms and kitchenettes2 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
Phantom and Z Capital509/13/2026
BH26 Holdings110/29/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Banji Awosika Architect110/28/2026
Aminov Design Engineering505/20/2026
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
A D Building Solutions203/21/2026
Building Lifecycle
11/13/2026
Objection resolved — Resolved
11/12/2026
Objection resolved — Resolved
11/06/2026
Objection raised — Other
11/06/2026
Objection raised — Scope
10/28/2026
Filed — Alteration
HORIZONTAL ENLARGEMENT TO CREATE ONE BEDROOM AT EXISTING COVERED POTCH AND RENOVATE CELLAR
X01479559-I1
45 history events on file for this building. Sign in free to see the full history. Sign in · Create account
Nothing on file for this building.
1 project · most recent 10/28/2026
FiledStatusContractorScope
10/28/2026———
▾Special Inspection Requirements (DOB NOW) — 42
DateRequirementInspectorRole
10/24/2026Insulation placement and R values—energy_progress
10/24/2026Fenestration and door U-factor and product ratings—energy_progress
10/24/2026Fire-Resistant Penetrations and Joints—special
10/24/2026Structural Stability – Alterations of existing buildings—special
10/24/2026Final—progress
10/24/2026Footing and Foundation—progress
10/24/2026Energy Code Compliance Inspections—progress
10/24/2026Fire-Resistance Rated Construction—progress
10/24/2026Air barrier - visual inspection—energy_progress
10/24/2026Fenestration areas—energy_progress
10/24/2026Concrete - Cast-In-Place—special
10/24/2026Excavations - Sheeting, Shoring, and Bracing—special
03/30/2026Construction Utilizing CLT or SCL, Type IV—special
03/30/2026Structural Wood Frame—progress
03/30/2026Wood – Seismic Resistance—special
03/26/2026Structural Steel - High Strength Bolting—special
03/26/2026Structural Steel - Welding—special
03/26/2026Final—progress
03/26/2026Structural Stability – Alterations of existing buildings—special
03/26/2026Structural Steel - Details—special
03/03/2026Electric vehicle service equipment requirements—energy_progress
03/03/2026Energy Code Compliance Inspections—progress
03/03/2026Fire-Resistance Rated Construction—progress
03/03/2026Air barrier — testing —energy_progress
03/03/2026HVAC-R and service water heating system controls—energy_progress
Latest 25 of 42.
30 filed documents on file for this building. Sign in free to see the full history. Sign in · Create account