FirmFilingsMost Recent
ARC-HI-TECT ASSOCIATE INC206/02/2025
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
ARCHITECTURAL DESIGN SOLUTIONS103/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
ARC HI TECT ASSOCIATE INCGeneral Contractor404/09/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
ARC-HI-TECH ASSOCIATES IN6963102/03/2025
Building Lifecycle
All (14)Filed (2)Permit Issued (2)Signed Off (1)Violation (4)Objection (2)Special Inspection (3)
03/26/2026
Permit issued — Curb Cut
B01231308-I1-CC
10/07/2025
Violation issued (ECB, closed)
Construction
10/07/2025
Violation issued (ECB, closed)
Construction
06/02/2025
Filed — Alteration
New curb cut to comply ECB violation & stop work order, no change use, egress, and occupancy.
B01231308-I1
03/31/2025
Signed off — Alteration
Replace the existing Stagg Street side entrance door lintel and other repair work as per plan. No change in use, egress, or occupancy.
B01175160-I1
03/26/2025
Violation issued (ECB, closed)
Construction
03/26/2025
Violation issued (ECB, closed)
Construction
03/04/2025
Permit issued — General Construction
B01175160-I1-GC
02/12/2025
Objection resolved — Addressed
02/07/2025
Objection raised — Admin
02/03/2025
Filed — Alteration
Replace the existing Stagg Street side entrance door lintel and other repair work as per plan. No change in use, egress, or occupancy.
B01175160-I1
02/02/2025
Special inspection requirement — Masonry
IGOR LISOVENKO
02/02/2025
Special inspection requirement — Structural Stability – Alterations of existing buildings
IGOR LISOVENKO
02/02/2025
Special inspection requirement — Final
IGOR LISOVENKO
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWCurb CutPermit IssuedARC HI TECT ASSOCIATE INC03/26/2026
DOB NOWGeneral ConstructionSigned-offARC HI TECT ASSOCIATE INC03/04/2025
Nothing on file for this building.
▾Special Inspection Requirements (DOB NOW) — 3
DateRequirementInspectorRole
02/02/2025MasonryIGOR LISOVENKOspecial
02/02/2025Structural Stability – Alterations of existing buildingsIGOR LISOVENKOspecial
02/02/2025FinalIGOR LISOVENKOprogress
▾Documents — 8 on file (BIS + DOB NOW)
▸Plans & Drawings2
▸DOB NOWPlans/Sketch2
08/23/2026B01175160-I1Request digital key ↗
08/21/2026B01231308-I1Request digital key ↗
▸Seals & Professional Certifications5
▸DOB NOWDPL-1: Design Professional Seal & Signature2
08/23/2026B01175160-I1Open ↗
08/21/2026B01231308-I1Open ↗
▸DOB NOWSpecial Inspector Seal & Signature2
09/21/2026B01175160-I1Open ↗
09/21/2026B01175160-I1Open ↗
▸DOB NOWProgress Inspector Seal & Signature1
09/21/2026B01175160-I1Open ↗
▸Environmental & Asbestos1
▸DOB NOWDEP ACP-5: Asbestos Assessment Report1