← Back
BuildNYC
Condo, residential tower (mixed-use, multi-family elevator) [derived]
One Morningside Park Condominium
321 WEST 110TH STREET · BIN 1089445
💬 Discuss this project
2012Year Built
22Stories
RMBuilding Class
C1-9Zoning
69,340 sfGross Floor Area
1Units
LL97 CoveredRent Stabilized1 Active Violation ▸FISP: SWARMP
Condo, residential tower (mixed-use, multi-family elevator) [derived] · 3,951 sf lot · 17.55 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanicalPlumbingEquipmentGeneral
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Permit Issued — active, not yet Signed-off
Whole building & multi-floor projectsOne Morningside Park Condominium1 filing
RoofFISP inspection using rope accessUnder Construction1p · 2 filings · 4 docs
Floor 22Unit PH
Floor 21
Floor 20
Floor 19
Floor 18
Floor 17
Floor 16
Floor 15
Floor 14
Floor 13
Floor 12
Floor 11
Floor 10
Floor 9
Floor 8
Floor 7
Floor 6
Floor 5
Floor 4
Floor 3
Floor 2
Floor 1Malachite Group4p · 2 filings · 8 docs
Site & exteriorSidewalk shed and pipe scaffold1 filing · 2 docs
Filed — no permit issuedBusiness accessory sign installation on store front facade1 filing · 4 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
110 Manhattan Equities4503/21/2026
LMWT Realty1003/21/2026
Malachite Group507/08/2026
NYC Department of Housing Preservation and Development503/21/2026
MWT Realty Street403/21/2026
1504 CIA303/21/2026
246 Equities103/22/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Brett Rieger206/09/2025
Korman Design & Build109/07/2023
Sotir Associates207/25/2023
FL&M Engineering Design & Inspection104/06/2023
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Smep Design & Consultation203/21/2026
Rigid Structural Design103/21/2026
Rand Engineering & Arch403/21/2026
Kenny Lee Architect103/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Tri Borough ScaffoldingScaffold603/21/2026
Katan P & HPlumbing307/08/2026
Penta Restorationspecialty_contractor203/21/2026
MC SuperstructureScaffold207/08/2026
Doumas ElectricElectrical103/21/2026
Glendale Electl ContngElectrical103/22/2026
Advanced P Mechanical SprinklerGeneral Contractor103/22/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Rand Engineering & Architects266206/09/2025
Korman Design & Build2055109/07/2023
Sotir Associates7473207/25/2023
Vertical8740104/12/2023
Building Lifecycle
All (105)Filed (8)Permit Issued (8)Signed Off (4)Facade (FISP) (3)Violation (55)Inspection (2)Objection (2)Special Inspection (23)
07/23/2026
Permit issued — Suspended Scaffold
M01427819-I1-SC
07/13/2026
Filed — Alteration
FISP INSPECTION (Facade Inspection Safety Program). INDUSTRIAL ROPE ACCESS TECHNIQUES AND METHODS. SEE ATTACHED PLANS. Designated Primary Site supervisor: Jesus Decola
M01427819-I1
06/26/2026
Signed off — Alteration
FISP INSPECTION (Facade Inspection Safety Program) INDUSTRIAL ROPE ACCESS TECHNIQUES AND METHODS SEE ATTACHED PLANS Designated Primary Site supervisor: Jesus Decola
M01285881-I1
09/29/2025
Permit issued — Suspended Scaffold
M01285881-I1-SC
09/19/2025
Filed — Alteration
FISP INSPECTION (Facade Inspection Safety Program) INDUSTRIAL ROPE ACCESS TECHNIQUES AND METHODS SEE ATTACHED PLANS Designated Primary Site supervisor: Jesus Decola
M01285881-I1
07/28/2025
Signed off — Alteration
9th Cycle FISP repair. No change to use, egress, or occupancy.
M00811239-I1
07/01/2025
Special inspection requirement — Masonry
John Monroe
07/01/2025
Special inspection requirement — Energy Code Compliance Inspections
Brett Rieger
07/01/2025
Special inspection requirement — Final
Brett Rieger
07/01/2025
Special inspection requirement — Air barrier - visual inspection
Brett Rieger
07/01/2025
Special inspection requirement — Wall Panels, Curtain Walls, and Veneers
John Monroe
07/01/2025
Special inspection requirement — Tenant Protection Plan Compliance
MUHAMMAD HUQ
06/09/2025
Filed — Alteration
9th Cycle FISP repair. No change to use, egress, or occupancy.
M00811239-P1
08/12/2024
Special inspection requirement — Wall Panels, Curtain Walls, and Veneers
John Monroe
08/12/2024
Special inspection requirement — Energy Code Compliance Inspections
Brett Rieger
08/12/2024
Special inspection requirement — Air barrier - visual inspection
Brett Rieger
08/12/2024
Special inspection requirement — Final
Brett Rieger
08/12/2024
Special inspection requirement — Tenant Protection Plan Compliance
08/12/2024
Special inspection requirement — Masonry
John Monroe
06/28/2024
Signed off — Alteration
M00882279-I1
06/03/2024
Signed off — Alteration
Installation of a temporarily supported scaffold and heavy-duty sidewalk per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.
M00847091-I1
01/17/2024
Inspection — Pass-Final General Construction Non-Directive 14
Pass
View inspection ↗
09/22/2023
Permit issued — Sidewalk Shed
M00847091-I1-SH
09/21/2023
Permit issued — Supported Scaffold
M00847091-I1-SF
09/21/2023
Objection resolved — Addressed
09/15/2023
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
09/13/2023
Objection raised — Other
09/07/2023
Filed — Alteration
INSTALLATION OF NON-ADVERTISING, NON-FLASHING AND ILLUMINATED BUSINESS ACCESSORY SIGN ON FRONT FACADE OF STORE
M00887029-I1
08/11/2023
Permit issued — General Construction
M00811239-I1-GC
07/31/2023
Permit issued — Plumbing
M00882310-I1-PL
07/25/2023
Filed — Alteration
INSTALL NEW PLUMBING FIXTURES IN CONJUNCTION WITH INTERIOR RENOVATIONS FILED UNDER GC APP #M00882279.
M00882310-I1
07/24/2023
Special inspection requirement — Tenant Protection Plan Compliance
Hany Demetry
07/24/2023
Special inspection requirement — Energy Code Compliance Inspections
Hany Demetry
06/08/2023
Special inspection requirement — Final
DAVID UH
06/08/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
DAVID UH
05/31/2023
Filed — Alteration
M00882279-I1
05/30/2023
Special inspection requirement — Mechanical Systems
Hany Demetry
05/30/2023
Special inspection requirement — Tenant Protection Plan Compliance
Hany Demetry
05/30/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
Hany Demetry
05/30/2023
Special inspection requirement — Structural Stability – Alterations of existing buildings
Hany Demetry
05/30/2023
Special inspection requirement — Final
Hany Demetry
05/30/2023
Special inspection requirement — Energy Code Compliance Inspections
Hany Demetry
05/30/2023
Special inspection requirement — HVAC-R and service water heating equipment
Hany Demetry
04/12/2023
Filed — Alteration
9th Cycle FISP repair. No change to use, egress, or occupancy.
M00811239-I1
04/06/2023
Filed — Alteration
Installation of a temporarily supported scaffold and heavy-duty sidewalk per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.
M00847091-I1
04/06/2023
Permit issued — Supported Scaffold
M00847091-I1-SH
04/06/2023
Permit issued — Sidewalk Shed
M00847091-I1-SF
05/27/2021
Cycle 9 facade report signed — SWARMP
04/12/2021
Cycle 9 facade report submitted
03/25/2021
Cycle 9 facade inspection completed
03/21/2018
Violation issued (HPD, open)
B
11/13/2017
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
11/13/2017
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
02/16/2017
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
10/31/2014
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
10/31/2014
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
02/05/2014
Violation issued (ECB, closed)
Unknown
02/05/2014
Violation issued (ECB, closed)
Construction
09/05/2013
Violation issued (ECB, closed)
Construction
09/05/2013
Violation issued (ECB, closed)
Unknown
Latest 60 of 105 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSuspended ScaffoldPermit IssuedStructural Preservation System07/23/2026
DOB NOWSuspended ScaffoldSigned-offStructural Preservation System09/29/2025
DOB NOWSidewalk ShedSigned-offMC Superstructure09/22/2023
DOB NOWSupported ScaffoldSigned-offMC Superstructure09/21/2023
DOB NOWGeneral ConstructionSigned-offPenta Restoration08/11/2023
DOB NOWPlumbingPermit IssuedKatan P & H07/31/2023
DOB NOWSupported ScaffoldSigned-offTri Borough Scaffolding04/06/2023
DOB NOWSidewalk ShedSigned-offTri Borough Scaffolding04/06/2023
BISSPISSUEDNew Era Mechanical Service08/20/2018
BISPLISSUEDPolgano Plumbing08/09/2018
BISOTISSUEDTahoe Development08/09/2018
BIS—ISSUEDNational Maintenance02/02/2016
BIS—ISSUEDNational Maintenance02/02/2016
BIS—ISSUEDNational Maintenance02/01/2016
BIS—ISSUEDNational Maintenance02/01/2016
BIS—ISSUEDNational Maintenance02/01/2016
BIS—ISSUEDNational Maintenance01/28/2016
BISOTISSUEDXolle Demo07/28/2015
BISPLISSUEDTrue North Mechanical07/27/2015
BISOTISSUEDXolle Demo07/21/2015
BISEQISSUEDXolle Demo06/04/2015
BIS—ISSUEDXolle Demo06/04/2015
BISSPISSUEDNYC Fire Sprinkler05/21/2015
BISPLISSUEDArco Plumbing and Heating05/04/2015
BISOTISSUEDSyros Construction04/29/2015
BISOTISSUEDFull Service Contracting04/24/2015
BISMHISSUEDFull Service Contracting04/24/2015
BISOTISSUEDFull Service Contracting04/17/2015
BISMHISSUEDFull Service Contracting04/17/2015
BIS—ISSUEDXolle Demo03/17/2015
BISPLISSUEDAlafogiannis Plumbing & Heating12/10/2014
BISPLISSUEDAlafogiannis Plumbing & Heating12/10/2014
BISOTISSUEDPizzo Brothers11/24/2014
BISOTISSUEDPizzo Brothers11/21/2014
BISSPISSUEDTPC II Contractors06/12/2014
BISPLISSUEDTPC II Contractors06/12/2014
BISSDISSUEDTPC II Contractors06/12/2014
BIS—ISSUEDXolle Demo06/03/2014
BIS—ISSUEDXolle Demo02/25/2014
BISEQISSUEDXolle Demo02/25/2014
+ 18 more permits on file
1 project · most recent 07/25/2023
Water/Sanitary
FiledStatusContractorScope
07/25/2023Permit IssuedKatan P & HWater/Sanitary
5 projects · most recent 06/26/2024
General Wiring
FiledStatusContractorScope
06/26/2024CompletePower Control ElectricGeneral Wiring
07/26/2023CompleteJong Hyun Kim—
06/27/2023Permit IssuedBorowide Elect'l ContractorsGeneral Wiring
03/19/2023CompleteNash Electric Services—
05/24/2022CompleteGlendale Electl Contng—
2 projects · most recent 07/13/2026
FiledStatusContractorScope
07/13/2026Permit IssuedStructural Preservation System—
09/19/2025Signed-offStructural Preservation System—
▾Field Inspections (DOB CAP) — 2
DateTypeResultReport
01/17/2024Pass-Final General Construction Non-Directive 14PassView ↗
09/15/2023Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 23
DateRequirementInspectorRole
07/01/2025MasonryJohn Monroespecial
07/01/2025Energy Code Compliance InspectionsBrett Riegerprogress
07/01/2025FinalBrett Riegerprogress
07/01/2025Air barrier - visual inspectionBrett Riegerenergy_progress
07/01/2025Wall Panels, Curtain Walls, and VeneersJohn Monroespecial
07/01/2025Tenant Protection Plan ComplianceMUHAMMAD HUQspecial
08/12/2024Wall Panels, Curtain Walls, and VeneersJohn Monroespecial
08/12/2024Energy Code Compliance InspectionsBrett Riegerprogress
08/12/2024Air barrier - visual inspectionBrett Riegerenergy_progress
08/12/2024FinalBrett Riegerprogress
08/12/2024Tenant Protection Plan Compliance—special
08/12/2024MasonryJohn Monroespecial
07/24/2023Tenant Protection Plan ComplianceHany Demetryspecial
07/24/2023Energy Code Compliance InspectionsHany Demetryprogress
06/08/2023FinalDAVID UHprogress
06/08/2023Fire-Resistant Penetrations and JointsDAVID UHspecial
05/30/2023Mechanical SystemsHany Demetryspecial
05/30/2023Tenant Protection Plan ComplianceHany Demetryspecial
05/30/2023Fire-Resistant Penetrations and JointsHany Demetryspecial
05/30/2023Structural Stability – Alterations of existing buildingsHany Demetryspecial
05/30/2023FinalHany Demetryprogress
05/30/2023Energy Code Compliance InspectionsHany Demetryprogress
05/30/2023HVAC-R and service water heating equipmentHany Demetryenergy_progress
▾Documents — 424 on file (BIS + DOB NOW)
▸Plans & Drawings8
▸DOB NOWPlans/Sketch8
08/31/2026M00847091-I1Request digital key ↗
08/31/2026M00882279-I1Request digital key ↗
08/29/2026M00882310-I1Request digital key ↗
Showing 3 of 8 on file for this type
▸Applications & Permits96
▸BISPLAN / WORK APPROVAL APPLICATION52
08/23/2018123462591Open ↗
08/16/2018123561895Open ↗
07/19/2018123462591Open ↗
Showing 3 of 52 on file for this type
▸BISWORK PERMIT APPLICATION41
08/20/2018123561895Open ↗
08/09/2018123462591Open ↗
08/09/2018123462591Open ↗
Showing 3 of 41 on file for this type
▸BISBPP-5 - Authorization to the Department of Transportation3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸Zoning, Tax Lot & Property Records2
▸BISZONING DIAGRAM1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISTAX LOT- TENTATIVE LOT NUMBER ISSUED1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Seals & Professional Certifications113
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION54
08/23/2018123462591Open ↗
08/23/2018123462591Open ↗
08/23/2018123561895Open ↗
Showing 3 of 54 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST15
08/16/2018123561895Open ↗
02/05/2016122673240Open ↗
02/05/2016122673259Open ↗
Showing 3 of 15 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT13
08/16/2018123561895Open ↗
02/04/2016122673277Open ↗
02/04/2016122673295Open ↗
Showing 3 of 13 on file for this type
▸DOB NOWProgress Inspector Seal & Signature9
09/23/2026M00882310-I1Open ↗
08/30/2026M00887029-I1Open ↗
08/29/2026M00811239-I1Open ↗
Showing 3 of 9 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature7
09/23/2026M00882310-I1Open ↗
08/30/2026M00887029-I1Open ↗
08/29/2026M00811239-I1Open ↗
Showing 3 of 7 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature6
08/31/2026M00847091-I1Open ↗
08/31/2026M00882279-I1Open ↗
08/23/2026M00811239-P1Open ↗
Showing 3 of 6 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISProfessional and Owner Certification (POC3)2
02/05/2016122673240Open ↗
02/05/2016122673259Open ↗
▸Trade Schedules & Equipment46
▸BISSELF-CERT PLUMBING NOTICE16
12/28/2015122462236Open ↗
11/10/2015122200965Open ↗
10/07/2015121871420Open ↗
Showing 3 of 16 on file for this type
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE16
08/16/2018123561895Open ↗
07/19/2018123462591Open ↗
08/17/2015121871420Open ↗
Showing 3 of 16 on file for this type
▸BISFA - FDNY APPROVAL : FD-FAA3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸BISSCHEDULE B - PLUMBING3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸BISEQUIPMENT USE PERMITS3
01/06/2016121871420Open ↗
01/06/2016121871420Open ↗
12/17/2015121871420Open ↗
▸BISSPRINKLER INSP REPORT : FP-853
10/07/2015121871420Open ↗
09/11/2015121871420Open ↗
01/30/2015120666252Open ↗
▸BISSCHEDULE C - HEATING & COMBUSTION EQUIPMENT2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸Safety & Tenant Protection6
▸BISSTREET TREE CHECKLIST2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISTenant Protection Plan and Notes1
07/19/2018123462591Open ↗
▸BISDEMOLITION SUBMITTAL CERTIFICATION FORM1
08/09/2018123462591Open ↗
▸BISEXCAVATION OR DEMOLITION: 5-DAY NOTICE1
08/09/2018123462591Open ↗
▸BISST-1 Street Tree Checklist1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Environmental & Asbestos7
▸BISASBESTOS EXEMPTION CERTIFICATION LETTER7
03/16/2015122241412Open ↗
Showing 1 of 7 on file for this type
▸Energy Compliance16
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS12
08/23/2018123462591Open ↗
08/23/2018123561895Open ↗
08/22/2018123561895Open ↗
Showing 3 of 12 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS4
08/23/2018123462591Open ↗
01/19/2016122462236Open ↗
01/06/2016121871420Open ↗
Showing 3 of 4 on file for this type
▸Inspections & Test Reports2
▸BISTECHNICAL REPORT: RESPONSIBILITY2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸Approvals, Objections & Sign-offs36
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST16
08/24/2018123561895Open ↗
08/23/2018123462591Open ↗
08/22/2018123561895Open ↗
Showing 3 of 16 on file for this type
▸BISADMINISTRATIVE OBJECTIONS11
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 11 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION3
02/25/2015120666252Open ↗
Showing 1 of 3 on file for this type
▸BISBPP-8 - Request Items for Builders Pavement Plan Signoff2
06/23/2015120667260Open ↗
06/23/2015120667260Open ↗
▸BISSCHEDULE A - OCCUPANCY - USE2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISSHED LETTER1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISCONSTRUCTION CODE DETERMINATION1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Cost, Insurance & Ownership19
▸BISCOST AFFIDAVIT19
08/23/2018123462591Open ↗
08/22/2018123561895Open ↗
08/16/2018123561895Open ↗
Showing 3 of 19 on file for this type
▸Filing & Intake Forms64
▸BISADDITIONAL INFORMATION27
12/11/2015121871420Open ↗
08/06/2015121871420Open ↗
07/13/2015121871420Open ↗
Showing 3 of 27 on file for this type
▸BISEFILING COVER SHEET26
08/16/2018123561895Open ↗
07/19/2018123462591Open ↗
02/05/2016122673240Open ↗
Showing 3 of 26 on file for this type
▸BISBOROUGH INTAKE FORM5
08/24/2018123561895Open ↗
08/23/2018123561895Open ↗
08/23/2018123462591Open ↗
Showing 3 of 5 on file for this type
▸BISeFiling Job Application Cover Sheet5
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 5 on file for this type
▸BISBPP: CHECKLIST IN LIEU OF PLANS-ALT31
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Other Documents9
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION4
06/23/2015120667260Open ↗
06/23/2015120667260Open ↗
06/23/2015120667260Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWIRA Certification2
08/16/2026M01427819-I1Open ↗
08/13/2026M01285881-I1Open ↗
▸BISPlot Diagram1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISSupporting Document: Fee Exempt1
03/18/2015121412907Open ↗
▸BISRESTRICTION: DEED1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type