DOB06/15/2026FAILURE TO COMPLY WITH COMMISSIONERS ORDER DATED 10/03/25. COMP # 3A3212166. ORDER DIRECTED COMMENCEMENT OF STABILIZATION BY 10/31/25.
ECB02/24/2026AT TIME OF INSPECTION OBSERVED: TEMPORARY STABILIZATION WORK UNDER JOB# B01317127 CONTRARY TO COMMISSIONER'S ORDER. WORK PERFORMED AT ROOF LEVEL, SEQUENCE OF WORK CALL FOR WORK AT CELLAR LEVEL AS SHOWING AT X-1$2K due
ECB02/24/2026GC# 625452 WAS PERFORMING REMEDY WORK AT ROOF LEVEL, CONSTRUCTION REACHED 45' HEIGHT APPROX. NO OVERHEAD/ROOF PROTECTION FOR ADJOINING PROPERTIES AT EXPOSURE# 2/4 FRONT AND REAR CREATING POTENTIAL SAFETY HAZARD$5K due
DOB10/03/2025UNPERM'D DEMO&ALT WRK,INTERIOR & EXP#3 WALLS REMOVED.ORIGINAL FRAMING REPLC'D BY CFS JOISTS. FLR HEIGHTS CHANGED.OPENING AT EXP #2 FDN WALL CELLAR ELEV. DROP'D. VERT + HORIZ EXT, BLDG. OPEN TO ELEMENTS. REMEDY: RETAIN NYS PE TO PERIODICALLY INSPECT SITE & PROVIDE INSPECTION RPORTS PROVIDE FIRST REPORT NO LATER THAN 10/10/25
DOB10/03/2025UNPERM'D DEMO&ALT WRK,INTERIOR & EXP#3 WALLS REMOVED.ORIGINAL FRAMING REPLC'D BY CFS JOISTS. FLR HEIGHTS CHANGED. OPENING@EXP #2 FDN WALL CELLAR ELEV. DROP'D. VERT + HORIZ EXT, BLDG. OPEN TO ELEMENTS. REMEDY: COMPLY W CODE. COMMENCE TEMPORARY STABILIZATION WORK UNDER PERMIT BY 10/31/25
ECB09/19/2025ATOI OBSERVED AN UNPERMITTED HORIZONTAL 35' X 18' EXTENSION AT EXP 3. NO PERMITS FOR THE EXCAVATION., OBTAIN PERMIT$3K due
ECB09/19/2025ATOI OBSERVED AT EXP 3 LARGE PILE OF DEBRIS. WOOD, LIMBS, ETC. APPROX 10 YDS, REPAIR AND/REPLACE$3K due
ECB09/19/2025ATOI OBSERVED AT EXP 3 AN UNPERMITTED 35' X 18'HORIZONTAL EXTENSION. NO PERMITS ON FILE FOR THE FOUNDATION. AND CELLAR WALLS., OBTAIN PERMIT$3K due
ECB09/19/2025ATOI OBSERVED PERMITTED CONST FENCE DID NOT MEET CODE. FENCE IS 10' HIGH EXCEEDING 8' AND MISSING VISION PANELS., COMPLY WITH CODE$1K due
ECB09/19/2025ATOI OBSERVED A MAJOR UNPERMITTEDHORIZONTAL AND VERTICAL EXTENSION. VERTICAL EXT IS 20' ABOVE EXISTING BUILDING. HORIZONTAL IS 30'L X 25'W X 40'H., OBTAIN PERMIT$3K due
DOB09/19/2025ATOI OBSERVED AT EXP 3 A 18'WX35'LX60'H HORIZONTAL EXTENSION. ALSO A TWO STORY VERTICAL EXTENSION. NO STRUCTURAL PLANS ON FILE. STRUCTURAL STABILITY IS IN QUESTION FOR EXISTING BLDG AND NEW FOUNDATION. ALSO FOR THE LIGHT GAUGE STEEL FRAMING AND C JOISTS THROUGHOUT.
ECB09/19/2025ATOI OBSERVED AT EXP 3 A 18'WX35'LX60'H HORIZONTAL EXTENSION. ALSO A TWO STORY VERTICAL EXTENSION. NO STRUCTURAL PLANS ON FILE. STRUCTURAL STABILITY IS IN QUESTION FOR EXISTING BLDG AND NEW FOUNDATION. ALSO FOR$3K due
ECB06/15/2026LIVE GAS LINES AT METERS AT THE FRONT OF CELLAR SHOWING SIGNS OF RUST AND CORROSION. CREATING POTENTIAL FOR GAS LEAK, FIRE OR EXPLOSION., REPAIR AND/REPLACEHearing held — result not yet published$2K proposed
ECB09/26/2025OBSERVED WORKER ON 3RD FLOOR WINDOW. ., COMPLY WITH STOP WORK ORDERHearing held — result not yet published