Office, 20+ stories, with or without commercial
322 8 AVENUE
MANHATTAN · BIN 1014225
💬 Discuss this project
1925Year Built
21Stories
O4Building Class
C6-2AZoning
173,491 sfGross Floor Area
42Units
LL97 Covered1 Open Violation ▸FISP: SAFE
Office, 20+ stories, with or without commercial · Owner of record: 322 PARTNERS, · 9,605 sf lot · 18.06 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanicalPlumbingFire ProtectionGeneral
Permit Issued — active, not yet Signed-off
RoofUnder Construction5p · 4 filings · 20 docs
Floor 21Under Construction3p · 2 filings · 11 docs
Floor 201p · 1 filing · 3 docs
Floor 191p · 1 filing · 3 docs
Floor 18
Floor 17Under Construction2p · 2 filings · 11 docs
Floor 16
Floor 15
Floor 14
Floor 13Under Construction11p · 2 filings · 11 docs
Floor 12Under Construction7p · 1 filing · 10 docs
Floor 11
Floor 101p · 1 filing · 3 docs
Floor 9
Floor 8
Floor 7
Floor 6
Floor 5
Floor 4
Floor 3
Floor 2
Floor 132p · 2 filings · 20 docs
Mezzanine38p · 1 filing · 20 docs
Basement1p · 1 filing · 3 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
GFP REAL ESTATE10809/13/2026
T-MOBILE303/22/2026
322 PARTNERS5703/22/2026
322 PARTNERS NEWMARK REAL503/22/2026
NEWMARK2303/22/2026
NEWMARK & COMP REAL ESTATE INC5603/22/2026
NOW MARK CO REALTY103/22/2026
NEWMARK REALTY403/22/2026
SOFTWARE SYSTEMS103/22/2026
322 PARTNERS N.Y. REALTY103/22/2026
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
WALTER T GORMAN PE1603/21/2026
HTX BUILDING CONSULTING903/21/2026
EUROCELT EXPEDITING, INC403/21/2026
CONSTRUCTION PERMIT SERVICES103/21/2026
ECDESIGN STUDIO203/21/2026
PROFESSIONAL DESIGN CONSULTANTS LL203/21/2026
PATUXENT ENGINEERING203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
NORTH STAR AIR CONDITION*General Contractor607/08/2026
AVARGA CONSTRUCTION CORPGeneral Contractor507/08/2026
PHASE 3 INTERIORS LLCGeneral Contractor507/08/2026
AVARGA CONTRACTING CORPGeneral Contractor507/08/2026
MANHATTAN D ENTERPRISESGeneral Contractor407/08/2026
CENTAURI DEVELOPMENT INCGeneral Contractor407/08/2026
PROMETHEAN BUILDERS LLCGeneral Contractor207/08/2026
JJAW SERVICE INCGeneral Contractor207/08/2026
ECNY ELEC'L CONTR'S, INCElectrical203/22/2026
TRISTRUX LLCGeneral Contractor203/21/2026
GRUSHINSKY PIPNG & HTG INFire Protection107/08/2026
UPRIGHT FIRE PROTCTN LLCFire Protection107/08/2026
HENICK-LANE SERVICE CORPGeneral Contractor106/27/2026
WHITESTAR CONSLT. & CONTGeneral Contractor107/08/2026
A&A PLUMBING CORPPlumbing107/08/2026
HP SERVICES INCPlumbing107/08/2026
PARKVIEW P&H INCPlumbing107/08/2026
A.MIRANDA CONTRACTING CORElectrical103/21/2026
NEPTUNE SIGNS AWNINGSScaffold107/08/2026
CHELLI, NINOElectrical103/21/2026
COPSE, DENISElectrical103/21/2026
DIMITRIOS ROSVOGLOUElectrical103/21/2026
FERRY, ANTHONYElectrical103/21/2026
GESSIN, COREYElectrical103/21/2026
HARVEY ISAACMANElectrical103/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
MARCY ENGINEERING9601106/02/2026
WALTER T. GORMAN, P.E., P268805/13/2026
LUCID BUILDING ENGINEERIN8196403/04/2026
SY ENGINEERING PLLC5149306/12/2025
JACK GREEN ASSOCIATES422501/02/2024
ZHENG & ASSOCIATES LLC7330212/11/2023
NY RESTORATION TECHNOLOGY6187108/10/2022
GILSANZ MURRAY STEFICEK240107/11/2022
KMB DESIGN GROUP, LLC513105/12/2022
Building Lifecycle
All (220)Filed (32)Permit Issued (33)Signed Off (16)Facade (FISP) (20)Violation (60)Inspection (20)Objection (9)Special Inspection (30)
07/29/2026
Signed off — Alteration
Propose installation of (4) air-cooled condensing units. No change to use, egress or occupancy.
M01370303-I1
07/29/2026
Signed off — Alteration
Propose installation of (3) air-cooled condensing units. No change to use, egress or occupancy.
M01370270-I1
07/28/2026
Permit issued — Suspended Scaffold
M01427961-I1-SC
07/14/2026
Filed — Alteration
INDUSTRIAL ROPE ACCESS FOR FACADE INSPECTIONS & REPAIRS.
M01427961-I1
06/18/2026
Permit issued — Sprinklers
M01392536-S1-PL
06/18/2026
Permit issued — Plumbing
M01392536-S1-EW-SP
06/05/2026
Permit issued — Mechanical Systems
M01392785-I1-MS
06/02/2026
Filed — Alteration
HVAC Design for tenant fit out. Replacement of existing HVAC units, in-kind, in-place. New ductwork throughout.
M01392785-I1
06/02/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
Jacob Stone
06/02/2026
Special inspection requirement — Maintenance information
Jacob Stone
06/02/2026
Special inspection requirement — HVAC-R and service water heating system controls
Jacob Stone
06/02/2026
Special inspection requirement — HVAC-R and service water heating equipment
Jacob Stone
05/21/2026
Special inspection requirement — Energy Code Compliance Inspections
Jacob Stone
05/19/2026
Permit issued — General Construction
M01392536-I1-GC
05/13/2026
Filed — Alteration
Propose plumbing and sprinkler work as per drawings filed herewith. No change in use, egress or occupancy.
M01392536-S1
05/12/2026
Filed — Alteration
Propose plumbing and sprinkler work as per drawings filed herewith. No change in use, egress or occupancy.
M01392536-I1
05/11/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
Walter Gorman
04/24/2026
Special inspection requirement — Sprinkler Systems
Walter Gorman
04/24/2026
Special inspection requirement — Mechanical Systems
Jacob Stone
04/24/2026
Special inspection requirement — Final
Jacob Stone
04/21/2026
Permit issued — Mechanical Systems
M01370303-I1-MS
04/17/2026
Permit issued — Mechanical Systems
M01370289-I1-MS
04/16/2026
Permit issued — Mechanical Systems
M01370270-I1-MS
04/13/2026
Permit issued — General Construction
M01381358-I1-GC
04/06/2026
Filed — Alteration
Propose to perform removal of interior partitions. No change in use, egress or occupancy.
M01381358-I1
03/27/2026
Filed — Alteration
Propose installation of (4) air-cooled condensing units. No change to use, egress or occupancy.
M01370303-I1
03/27/2026
Filed — Alteration
Propose installation of (3) air-cooled condensing units. No change to use, egress or occupancy.
M01370270-I1
03/27/2026
Filed — Alteration
Propose installation of (2) air-cooled condensing units & (2) air handling units. No change to use, egress or occupancy.
M01370289-I1
03/24/2026
Objection raised — Zoning
03/11/2026
Special inspection requirement — Energy Code Compliance Inspections
Walter Gorman
03/11/2026
Special inspection requirement — Maintenance information
Walter Gorman
03/11/2026
Special inspection requirement — Final
Walter Gorman
03/11/2026
Special inspection requirement — Maintenance information
Walter Gorman
03/11/2026
Special inspection requirement — HVAC-R and service water heating equipment
Walter Gorman
03/11/2026
Special inspection requirement — Maintenance information
Walter Gorman
03/11/2026
Special inspection requirement — Mechanical Systems
Walter Gorman
03/11/2026
Special inspection requirement — Energy Code Compliance Inspections
Walter Gorman
03/11/2026
Special inspection requirement — Energy Code Compliance Inspections
Walter Gorman
03/11/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
Walter Gorman
03/11/2026
Special inspection requirement — Mechanical Systems
Walter Gorman
03/11/2026
Special inspection requirement — HVAC-R and service water heating equipment
Walter Gorman
03/11/2026
Special inspection requirement — Final
Walter Gorman
03/11/2026
Special inspection requirement — Mechanical Systems
Walter Gorman
03/11/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
Walter Gorman
03/11/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
Walter Gorman
03/11/2026
Special inspection requirement — Final
Walter Gorman
03/11/2026
Special inspection requirement — HVAC-R and service water heating equipment
Walter Gorman
03/04/2026
Filed — Alteration CO
new air cooled VRF system for the tenant space , condening unit to be installed in the existing back yard , new gas fired indoor kitchen hookd mark up air , kirchen hood and KXFR are existing to remain, toilet exhaust to be tied -in to exising ect
M00946500-P7
03/02/2026
Signed off — Alteration
M01199831-I1
01/29/2026
Signed off — Alteration CO
new air cooled VRF system for the tenant space , condening unit to be installed in the existing back yard , new gas fired indoor kitchen hookd mark up air , kirchen hood and KXFR are existing to remain, toilet exhaust to be tied -in to exising ect
M00946500-S2
01/29/2026
Special inspection requirement — Energy Code Compliance Inspections
Jinfar Liu
01/29/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
YUNHO LEE
01/29/2026
Special inspection requirement — Electrical motors and elevators
Jinfar Liu
12/31/2025
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
11/18/2025
Signed off — Alteration
M01249510-I1
11/17/2025
Permit issued — Mechanical Systems
M01249510-I1-MS
11/07/2025
Filed — Alteration CO
new air cooled VRF system for the tenant space , condening unit to be installed in the existing back yard , new gas fired indoor kitchen hookd mark up air , kirchen hood and KXFR are existing to remain, toilet exhaust to be tied -in to exising ect
M00946500-P6
09/18/2025
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
08/18/2025
Filed — Alteration
M01249510-I1
07/11/2025
Objection resolved — Addressed
Latest 60 of 220 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSuspended ScaffoldPermit IssuedAVARGA CONSTRUCTION CORP07/28/2026
DOB NOWSprinklersPermit IssuedPARKVIEW P&H INC06/18/2026
DOB NOWPlumbingPermit IssuedUPRIGHT FIRE PROTCTN LLC06/18/2026
DOB NOWMechanical SystemsPermit IssuedHENICK-LANE SERVICE CORP06/05/2026
DOB NOWGeneral ConstructionPermit IssuedPROMETHEAN BUILDERS LLC05/19/2026
DOB NOWMechanical SystemsSigned-offNORTH STAR AIR CONDITION*04/21/2026
DOB NOWMechanical SystemsPermit IssuedNORTH STAR AIR CONDITION*04/17/2026
DOB NOWMechanical SystemsSigned-offNORTH STAR AIR CONDITION*04/16/2026
DOB NOWGeneral ConstructionPermit IssuedPROMETHEAN BUILDERS LLC04/13/2026
DOB NOWMechanical SystemsSigned-offNORTH STAR AIR CONDITION*11/17/2025
DOB NOWMechanical SystemsSigned-offNORTH STAR AIR CONDITION*05/21/2025
DOB NOWGeneral ConstructionPermit IssuedJJAW SERVICE INC11/12/2024
DOB NOWMechanical SystemsPermit IssuedJJAW SERVICE INC11/12/2024
DOB NOWSignSigned-offNEPTUNE SIGNS&AWNINGS INC07/18/2024
DOB NOWPlumbingSigned-offEXPERT FIRE SPRINKLER,LLC07/08/2024
DOB NOWSprinklersSigned-offHP SERVICES INC03/06/2024
DOB NOWGeneral ConstructionPermit IssuedCENTAURI DEVELOPMENT INC02/07/2024
DOB NOWMechanical SystemsPermit IssuedCENTAURI DEVELOPMENT INC01/04/2024
DOB NOWSupported ScaffoldSigned-offAVARGA CONSTRUCTION CORP09/18/2023
DOB NOWSprinklersSigned-offA&A PLUMBING CORP07/31/2023
DOB NOWSprinklersSigned-offGRUSHINSKY PIPNG & HTG IN03/08/2023
DOB NOWSidewalk ShedSigned-offMANHATTAN D ENTERPRISES02/24/2023
DOB NOWGeneral ConstructionSigned-offPHASE 3 INTERIORS LLC09/13/2022
DOB NOWMechanical SystemsSigned-offPHASE 3 INTERIORS LLC09/13/2022
DOB NOWStructuralSigned-offWHITESTAR CONSLT. & CONT07/12/2022
DOB NOWAntennaSigned-offTRISTRUX LLC06/22/2022
DOB NOWSidewalk ShedSigned-offMANHATTAN D ENTERPRISES02/25/2022
DOB NOWSidewalk ShedSigned-offAVARGA CONSTRUCTION CORP02/10/2022
DOB NOWSidewalk ShedSigned-offAVARGA CONSTRUCTION CORP02/08/2022
DOB NOWSidewalk ShedSigned-offAVARGA CONTRACTING CORP08/26/2021
DOB NOWSidewalk ShedSigned-offAVARGA CONTRACTING CORP01/12/2021
DOB NOWSidewalk ShedSigned-offAVARGA CONTRACTING CORP09/18/2020
DOB NOWMechanical SystemsSigned-offNORTH STAR AIR CONDITION*08/14/2020
BISOTISSUEDAVARGA CONSTRUCTION CORP04/26/2022
BISOTISSUEDAVARGA CONSTRUCTION CORP03/30/2022
BISPLISSUEDACCURATE MECHANICAL INC12/23/2021
BISSPISSUEDACCURATE MECHANICAL INC12/17/2021
BISPLISSUEDACCURATE MECHANICAL INC12/17/2021
BISOTISSUEDAVARGA CONSTRUCTION CORP.06/25/2021
BISOTISSUEDWHITESTAR CONSLT. & CONT09/16/2020
+ 43 more permits on file
5 projects · most recent 06/02/2026
Air Conditioning Systems Heating and Air Conditioning Systems Refrigeration Systems
FiledStatusContractorScopeMake / Model / Capacity
06/02/2026Permit IssuedHENICK-LANE SERVICE CORPHeating and Air Conditioning Systems
Heat / Cool
Mitsubishi Electric MXZ-SM60NL 60,000 BTU · Heat Pump Outdoor ×1
SUZ-AK60NL 60,000 BTU · Heat Pump Outdoor ×1
03/27/2026Signed-offNORTH STAR AIR CONDITION*Air Conditioning Systems
Cooling
Daikin DX11SA0903AA 88,000 BTU · Condensing Unit ×1
Mitsubishi Electric PUHY-EP120TNU-A1 120,000 BTU · Vrf Outdoor ×1
__Junk__ 4TTA3060D3000DA 60,000 BTU · Condensing Unit ×1
03/27/2026Permit IssuedNORTH STAR AIR CONDITION*Air Conditioning Systems
Cooling
Mitsubishi Electric PFFY-P24NRMU-E 24,000 BTU · Vrf Indoor ×2
MXZ-SM48NAM2 48,000 BTU · Condensing Unit ×1
Lg ARUM121BTE5 119,700 BTU · Vrf Outdoor ×1
03/27/2026Signed-offNORTH STAR AIR CONDITION*Air Conditioning Systems
Cooling
Mitsubishi Electric MUZ-GL24NA 31,400 BTU · Condensing Unit ×1
PUHY-P96TJMU-A 96,000 BTU · Vrf Outdoor ×1
Trane TTA09043AA 91,000 BTU · Condensing Unit ×2
03/04/2026Permit IssuedJJAW SERVICE INCHeating and Air Conditioning Systems, Refrigeration Systems
Heat / Cool
Lg ARUM144BTE5 (heating @ 162000 BTU) 144,000 BTU · Vrf Outdoor ×2
Refrigeration
Captiveaire n/a 2,400 CFM · Makeup Air ×1
2 projects · most recent 05/13/2026
Sprinkler System
FiledStatusContractorScope
05/13/2026Permit IssuedUPRIGHT FIRE PROTCTN LLCSprinkler System
03/04/2026Signed-offEXPERT FIRE SPRINKLER,LLCSprinkler System
2 projects · most recent 05/13/2026
Water/Sanitary Gas
FiledStatusContractorScope
05/13/2026Permit IssuedPARKVIEW P&H INCWater/Sanitary
03/04/2026Signed-offHP SERVICES INCGas, Water/Sanitary
7 projects · most recent 11/04/2024
General Wiring
FiledStatusContractorScope
11/04/2024CompleteECNY ELEC'L CONTR'S, INCGeneral Wiring
11/04/2024CompleteECNY ELEC'L CONTR'S, INCGeneral Wiring
08/05/2024CompleteUNITED ELEC'L CONT'G CORP—
06/21/2024CompleteKJK ELECTRIC INC—
12/23/2023Permit IssuedCENTENNIAL ELEVATOR INDUSGeneral Wiring
03/01/2022Complete5 J'S ELECTL CONTS CORP—
08/31/2018Permit IssuedJER ELECTRIC CORPGeneral Wiring
1 project · most recent 07/14/2026
FiledStatusContractorScope
07/14/2026Permit IssuedAVARGA CONSTRUCTION CORP—
▾Field Inspections (DOB CAP) — 20
DateTypeResultReport
12/31/2025Pass-Final CND-Occupancy InspectionPassView ↗
09/18/2025Pass-Final CND-Occupancy InspectionPassView ↗
07/07/2025Pass-Final CND-Occupancy InspectionPassView ↗
06/30/2025Pass-Final CND-Occupancy InspectionPassView ↗
05/02/2025Pass-Final PL - More than 10 Requested FloorsPassView ↗
05/01/2025Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
04/23/2025Pass-Final CND-Occupancy InspectionPassView ↗
12/11/2024Pass-Final PL - More than 10 Requested FloorsPassView ↗
11/20/2024Pass-Final Curb Cut Non-Directive 14PassView ↗
09/18/2024Certified Sprinkler-Dry Pipe Valve (SP)-Dry Pipe Valve TestCertifiedView ↗
09/18/2024Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
09/15/2024Certified Sprinkler (SP) - Booster Pump TestCertifiedView ↗
09/15/2024Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
07/29/2024Pass-Final Sign Permit InspectionPassView ↗
03/19/2024Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
11/30/2023Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
11/27/2023Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
10/27/2023Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
08/10/2023Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
07/14/2023Fail-Final Curb Cut Non-Directive 14FailView ↗
▾Special Inspection Requirements (DOB NOW) — 94
DateRequirementInspectorRole
06/02/2026HVAC-R and service water piping design and insulationJacob Stoneenergy_progress
06/02/2026Maintenance informationJacob Stoneenergy_progress
06/02/2026HVAC-R and service water heating system controlsJacob Stoneenergy_progress
06/02/2026HVAC-R and service water heating equipmentJacob Stoneenergy_progress
05/21/2026Energy Code Compliance InspectionsJacob Stoneprogress
05/11/2026Fire-Resistant Penetrations and JointsWalter Gormanspecial
04/24/2026FinalJacob Stoneprogress
04/24/2026Sprinkler SystemsWalter Gormanspecial
04/24/2026Mechanical SystemsJacob Stonespecial
03/11/2026HVAC-R and service water heating equipmentWalter Gormanenergy_progress
03/11/2026Maintenance informationWalter Gormanenergy_progress
03/11/2026Fire-Resistant Penetrations and JointsWalter Gormanspecial
03/11/2026Mechanical SystemsWalter Gormanspecial
03/11/2026FinalWalter Gormanprogress
03/11/2026Energy Code Compliance InspectionsWalter Gormanprogress
03/11/2026HVAC-R and service water heating equipmentWalter Gormanenergy_progress
03/11/2026Maintenance informationWalter Gormanenergy_progress
03/11/2026Fire-Resistant Penetrations and JointsWalter Gormanspecial
03/11/2026Fire-Resistant Penetrations and JointsWalter Gormanspecial
03/11/2026Mechanical SystemsWalter Gormanspecial
03/11/2026HVAC-R and service water heating equipmentWalter Gormanenergy_progress
03/11/2026Maintenance informationWalter Gormanenergy_progress
03/11/2026FinalWalter Gormanprogress
03/11/2026Energy Code Compliance InspectionsWalter Gormanprogress
03/11/2026Mechanical SystemsWalter Gormanspecial
Latest 25 of 94.
▾Tenants in the building
TenantSpaceFloorsRenovation projects
YasubeeRestaurant / Food ServiceFloor 1, Mezzanine
Project M00946500 Alteration CO · Permit Entire · 11/21/2023
Read from each project’s drawing title blocks and cover sheets and checked twice; a name appears only when it is the occupant, never the owner, landlord or designer.
▾Documents — 913 on file (BIS + DOB NOW)
▸Plans & Drawings32
▸DOB NOWPlans/Sketch29
09/03/2026M00502070-I1Request digital key ↗
09/02/2026M00685531-I1Request digital key ↗
09/02/2026M00732179-I1Request digital key ↗
Showing 3 of 29 on file for this type
▸DOB NOWPlans/Sketch - Sidewalk Shed2
09/04/2026M00399281-P1Request digital key ↗
09/04/2026M00399281-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Mechanical Systems1
09/04/2026M00352224-I1Request digital key ↗
▸Applications & Permits174
▸BISPLAN / WORK APPROVAL APPLICATION112
02/18/2025102063348Open ↗
11/21/2024101934365Open ↗
10/09/2024122839722Open ↗
Showing 3 of 112 on file for this type
▸BISWORK PERMIT APPLICATION60
12/27/2021122850520Open ↗
12/17/2021123486977Open ↗
12/17/2021123486977Open ↗
Showing 3 of 60 on file for this type
▸BISSIDEWALK SHED APPLICATION & PERMIT1
02/04/2021140920975Open ↗
▸BISSCAFFOLD APPLICATION & PERMIT1
02/04/2021140920975Open ↗
▸Seals & Professional Certifications251
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION83
11/08/2018140607350Open ↗
09/13/2018122966521Open ↗
09/07/2018121868700Open ↗
Showing 3 of 83 on file for this type
▸DOB NOWProgress Inspector Seal & Signature46
09/23/2026M00789143-I1Open ↗
09/02/2026M00946500-I1Open ↗
09/02/2026M00946500-I1Open ↗
Showing 3 of 46 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature31
09/04/2026M00352224-I1Open ↗
09/04/2026M00399281-I1Open ↗
09/04/2026M00399281-P1Open ↗
Showing 3 of 31 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature25
09/23/2026M00789143-I1Open ↗
09/23/2026M00789143-I1Open ↗
09/02/2026M00946500-I1Open ↗
Showing 3 of 25 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT23
08/27/2020140944771Open ↗
08/13/2020140925131Open ↗
Showing 2 of 23 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST22
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 22 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM8
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 8 on file for this type
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY7
08/27/2020140944771Open ↗
08/13/2020140925131Open ↗
07/20/2020140920975Open ↗
Showing 3 of 7 on file for this type
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION6
08/27/2020140944771Open ↗
08/13/2020140925131Open ↗
Showing 2 of 6 on file for this type
▸Trade Schedules & Equipment47
▸BISSELF-CERT PLUMBING NOTICE10
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 10 on file for this type
▸BISEQUIPMENT USE PERMITS10
02/09/2022123486977Open ↗
02/09/2022123486977Open ↗
01/31/2022123486977Open ↗
Showing 3 of 10 on file for this type
▸BISFA - FDNY APPROVAL : FD-FAA7
02/18/2020122840088Open ↗
Showing 1 of 7 on file for this type
▸BISEQUIPMENT USE APPLICATION/PERMIT6
02/09/2022123486977Open ↗
01/31/2022123486977Open ↗
09/07/2018121868700Open ↗
Showing 3 of 6 on file for this type
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE6
08/17/2018123486977Open ↗
Showing 1 of 6 on file for this type
▸BISSCHEDULE B - PLUMBING5
12/06/2021123486977Open ↗
Showing 1 of 5 on file for this type
▸BISSIGN HANGER CERTIFICATE2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISSPRINKLER INSP REPORT : FP-851
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Safety & Tenant Protection13
▸BISEXCAVATION OR DEMOLITION: 5-DAY NOTICE4
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 4 on file for this type
▸BISDEMOLITION SUBMITTAL CERTIFICATION FORM4
09/27/2018123486977Open ↗
Showing 1 of 4 on file for this type
▸DOB NOWStreet Tree Checklist4
08/13/2026M00946500-P6Open ↗
08/13/2026M00946500-P2Open ↗
08/13/2026M00946500-I1Open ↗
Showing 3 of 4 on file for this type
▸BISTENANT PROTECTION PLAN AND NOTES1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Environmental & Asbestos61
▸BISASBESTOS: CERTIFICATION (DEP ACP5)25
08/13/2020140925131Open ↗
07/20/2020140920975Open ↗
Showing 2 of 25 on file for this type
▸DOB NOWDEP ACP-5: Asbestos Assessment Report22
09/04/2026M00352224-I1Open ↗
09/01/2026M00749869-I1Open ↗
08/28/2026M00789143-I1Open ↗
Showing 3 of 22 on file for this type
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'12
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 12 on file for this type
▸BISASBESTOS EXEMPTION CERTIFICATION LETTER2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸Energy Compliance56
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS25
09/07/2018121868700Open ↗
Showing 1 of 25 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS10
02/08/2023140920975Open ↗
02/06/2023140920975Open ↗
01/30/2023140920975Open ↗
Showing 3 of 10 on file for this type
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY6
01/31/2022123486977Open ↗
04/09/2021122850520Open ↗
12/24/2020140925131Open ↗
Showing 3 of 6 on file for this type
▸BISTECHNICAL REPORT: ENERGY4
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 4 on file for this type
▸BISTR8: Energy Code Progress Inspections3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸DOB NOWEN2: As Built Energy Analysis3
08/13/2026M00749869-I1Open ↗
08/13/2026M00789143-I1Open ↗
08/13/2026M00789119-I1Open ↗
▸BISAS-BUILT ENERGY ANALYSIS (EN2)2
01/31/2022123486977Open ↗
12/24/2020140925131Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY FOR ENERGY CODE PROGRESS INSPECTIONS2
08/13/2020140925131Open ↗
Showing 1 of 2 on file for this type
▸BISINTERIOR LIGHTING POWER1
09/16/2020140925131Open ↗
▸Inspections & Test Reports39
▸BISTECHNICAL REPORT: RESPONSIBILITY29
10/10/2024122839713Open ↗
10/10/2024122839722Open ↗
09/26/2024122839722Open ↗
Showing 3 of 29 on file for this type
▸BISDIR-14 ID OF RESPONSIBILITY (TR1)2
06/25/2021140944771Open ↗
09/16/2020140925131Open ↗
▸BISFIRE-RESISTANT PENETRATIONS AND JOINTS (FIRESTOP)2
01/24/2022123486977Open ↗
09/16/2020140925131Open ↗
▸BISTECHNICAL REPORT: CONCRETE/TEST CYLINDER1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISMECHANICAL SYSTEMS1
01/24/2022123486977Open ↗
▸BISSTRUCTURAL STABILITY - EXISTING BUILDINGS1
01/24/2022123486977Open ↗
▸BISHYDRAULIC FLOW CALCULATIONS1
08/22/2018123486977Open ↗
▸BISSTRUCTURAL STEEL - DETAILS1
01/24/2022123486977Open ↗
▸BISFIRE-RESISTIVE RATED CONSTRUCTION1
09/16/2020140925131Open ↗
▸Approvals, Objections & Sign-offs59
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST27
10/11/2024122839713Open ↗
10/11/2024122839722Open ↗
08/02/2023140944771Open ↗
Showing 3 of 27 on file for this type
▸BISADMINISTRATIVE OBJECTIONS17
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 17 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION8
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 8 on file for this type
▸BISFINAL4
10/10/2024122839713Open ↗
10/10/2024122839722Open ↗
08/01/2023140944771Open ↗
Showing 3 of 4 on file for this type
▸BISSUPERSEDING LETTER2
12/27/2021122850520Open ↗
Showing 1 of 2 on file for this type
▸BISPREFABRICATED/MODULAR CONSTRUCTION: OTCR APPROVALS1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Cost, Insurance & Ownership65
▸BISCOST AFFIDAVIT58
02/08/2023140920975Open ↗
01/30/2023140920975Open ↗
11/29/2022140920975Open ↗
Showing 3 of 58 on file for this type
▸BISCOST AFFIDAVIT (FINAL): PW36
10/09/2024122839722Open ↗
10/09/2024122839713Open ↗
08/01/2023140944771Open ↗
Showing 3 of 6 on file for this type
▸BISCOST AFFIDAVIT ESTIMATE: (PW3)1
07/31/2023140944771Open ↗
▸Filing & Intake Forms92
▸BISEFILING COVER SHEET34
08/17/2018123486977Open ↗
Showing 1 of 34 on file for this type
▸BISBOROUGH INTAKE FORM33
12/27/2021122850520Open ↗
12/17/2021123486977Open ↗
12/17/2021123486977Open ↗
Showing 3 of 33 on file for this type
▸BISADDITIONAL INFORMATION16
01/23/2023140920975Open ↗
09/29/2022140944771Open ↗
09/01/2022140944771Open ↗
Showing 3 of 16 on file for this type
▸BISEFILING JOB APPLICATION COVER SHEET9
08/27/2020140944771Open ↗
08/13/2020140925131Open ↗
07/20/2020140920975Open ↗
Showing 3 of 9 on file for this type
▸Other Documents14
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION9
10/01/2024102063348Open ↗
09/27/2024122839722Open ↗
09/27/2024122839713Open ↗
Showing 3 of 9 on file for this type
▸DOB NOWProperty Ownership Certification4
08/18/2026M00946500-P7Open ↗
08/18/2026M00946500-I1Open ↗
08/18/2026M00946500-P2Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWIRA Certification1
08/16/2026M01427961-I1Open ↗