HPD06/24/2026HMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF ROACHES IN THE ENTIRE APARTMENT LOCATED AT APT 14, 4th STORY, 1st APARTMENT FROM SOUTH AT WEST
HPD06/24/2026§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT ALL WALLS AND CEILING IN THE BATHROOM LOCATED AT APT 14, 4th STORY, 1st APARTMENT FROM SOUTH AT WEST
HPD06/24/2026HMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF MICE IN THE ENTIRE APARTMENT LOCATED AT APT 14, 4th STORY, 1st APARTMENT FROM SOUTH AT WEST
HPD10/12/2025§ 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... GREATER THAN 30 SQ FT AT THE NORTH WALL, EAST WALL, SOUTH WALL, WEST WALL AND CEILING IN THE BATHROOM LOCATED AT APT 11, 3rd STORY, 1st APARTMENT FROM NORTH AT EAST
DOB06/20/2023VIOLATION ISSUED-FAILURE TO FILE 2019 EXTERNAL LOW PRESSURE INSPECTION
HPD02/25/2022§ 27-2056.4 ADM CODE- CORRECT FAILURE TO NOTIFY OCCUPANTS AND/OR TO INVESTIGATE LEAD-BASED PAINT HAZARDS.
HPD02/25/2022§ 27-2056.7 ADM CODE: CORRECT FAILURE TO PROVIDE TO THE DEPARTMENT WITHIN 45 DAYS OF DEMAND ALL RECORDS REQUIRED TO BE MAINTAINED BY OWNER PURSUANT TO LOCAL LAW 1 OF 2004 RELATED TO LEAD-BASED PAINT NOTICES, INSPECTIONS AND REMEDIATION/ABATEMENT ACTIVITIES.
HPD09/16/2021§ 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... APPROXIMATELY 25 SQ FEET AT CEILING IN THE BATHROOM LOCATED AT APT 16, 4th STORY, 1st APARTMENT FROM NORTH AT EAST
HPD11/17/2019§ 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... APPROX. 10 SQ. FT AT EAST WALL IN THE 1st ROOM FROM NORTH LOCATED AT APT 11, 2nd STORY, 1st APARTMENT FROM NORTH AT EAST
HPD05/26/2019§ 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... 15 SQ FT AT CEILING IN THE BATHROOM LOCATED AT APT 11, 2nd STORY, 1st APARTMENT FROM WEST AT NORTH
DOB03/03/2015VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2013 INSPECTION REPORT
ECB03/30/2009FAILURE TO MAINTAIN BLDG IN CODE COMPLIANT MANNER RE:INSTALLATION/MAINTENANCE OF PLUMBING MATERIALS/EQUIPMENT PER PC 102.3:ON INSPECTION DAY:30/30/09,I WITNESSED THAT IN APT #7 ON 2FL OVERFLOW PIPE FROM BATHTUBNothing owed — awaiting certificate of correction
ECB05/05/200434B/32A/BA4/50A/50B/50C (50A)SEPERATE CONTROLLS FROM 14' LINE (50B)INSTALL BACK FLOW PREVENTOR ON FEED WATER LINE (50C)BOILER JACKETS MISSING(50D)HOT WATER RELIEF PLUGEDNothing owed — awaiting certificate of correction
ECB12/16/2003WORK DOES NOT CONFORM TO APPROVED PLANS.NOTED:WORKING UNDER JOB #103582758.NOTED WORK:REPAIR OF ROTTED FLOOR JOISTS AND ROLLED BEAMS AS PER DRAWING.NOTED:INSTALLED UNDERSIZE SUPPORT GIRDER SIZE 6"X6" BASEMENTNothing owed — awaiting certificate of correction
ECB05/26/1995WIRE STRAP NEDDED FOR BACK FLOW VLO REPLACE JACKET ON BOILERNothing owed — awaiting certificate of correction