← Back
BuildNYC
Walk-up cooperative
322 EAST 11TH STREET
MANHATTAN · East Village · BIN 1006441
💬 Discuss this project
1900Year Built
6Stories
C6Building Class
R8BZoning
10,794 sfGross Floor Area
25Units
Rent Stabilized60 Active Violations ▸
Walk-up cooperative · 2,369 sf lot · 4.56 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralElectricalMechanicalPlumbingEquipmentGeneral
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
RoofPlumbing work in apartments24p · 3 filings · 20 docs
Floor 6Plumbing work in apartments17p · 2 filings · 20 docs
Floor 5Plumbing work in apartments22p · 2 filings · 20 docs
Floor 4Plumbing work in apartments16p · 2 filings · 20 docs
Floor 3Plumbing work in apartments20p · 2 filings · 20 docs
Floor 2Plumbing work in apartments26p · 2 filings · 20 docs
Floor 1Plumbing work in apartments35p · 3 filings · 20 docs
Cellar9p · 1 filing · 20 docs
BasementResidential renovation and boiler work5p · 3 filings · 20 docs
Sub-BasementResidential renovation and boiler work13p · 2 filings · 18 docs
Site & exteriorInstallation of debris chute3p · 1 filing · 2 docs
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Atelier NY Architecture1307/13/2026
Kendall Engineering204/14/2025
Konoski Engineering105/29/2024
Structural Engineering Technologies108/15/2023
Enthink Engineers203/02/2023
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Atelier New York Architecture303/21/2026
Premier Expediting Services303/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Elite Illusion ConstructionGeneral Contractor907/08/2026
Ideal Construction & DesignGeneral Contractor704/09/2026
S & J Construction ServiceScaffold407/08/2026
Plumbing P & HPlumbing207/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Atelier NY Architecture2438707/13/2026
Kendall Engineering4154204/14/2025
Integrity Consulting Service666108/15/2023
Building Lifecycle
All (145)Filed (19)Permit Issued (13)Signed Off (7)Violation (60)Inspection (8)Objection (8)Special Inspection (30)
08/24/2026
Objection resolved — Resolved
08/24/2026
Objection resolved — Resolved
08/18/2026
Objection resolved — Resolved
08/11/2026
Objection raised — Structural
08/11/2026
Objection raised — Scope
08/11/2026
Objection raised — Admin
07/13/2026
Filed — Alteration CO
FILED FOR THE INSTALLATION OF NEW ROOF DECK AND TO OBTAIN NEW CERTIFICATE OF OCCUPANCY.
M00889127-P2
05/04/2026
Special inspection requirement — Tenant Protection Plan Compliance
05/04/2026
Special inspection requirement — Exterior lighting power
Anatole Plotkin
05/04/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
Anatole Plotkin
05/04/2026
Special inspection requirement — Energy Code Compliance Inspections
Anatole Plotkin
05/04/2026
Special inspection requirement — Fire-Resistance Rated Construction
Anatole Plotkin
04/06/2026
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
03/26/2026
Special inspection requirement — Tenant Protection Plan Compliance
03/26/2026
Special inspection requirement — Exterior lighting power
Anatole Plotkin
03/26/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
Anatole Plotkin
03/26/2026
Special inspection requirement — Fire-Resistance Rated Construction
Anatole Plotkin
03/26/2026
Special inspection requirement — Energy Code Compliance Inspections
Anatole Plotkin
03/03/2026
Filed — Alteration CO
FILED FOR THE INSTALLATION OF NEW ROOF DECK AND TO OBTAIN NEW CERTIFICATE OF OCCUPANCY.
M00889127-P1
12/18/2025
Inspection — Fail-Final CND-Occupancy Inspection
Fail
View inspection ↗
12/05/2025
Permit issued — General Construction
M00889127-I1-GC
12/02/2025
Signed off — Alteration
RENOVATION OF APARTMENTS. PARTITION CHANGES TO NON-LOAD-BEARING WALLS AS PER PLANS. NO CHANGE IN USE, OCCUPANCY, OR EGRESS.
M00806681-I1
12/02/2025
Signed off — Alteration
PLUMBING WORK IN APARTMENTS AS PER PLANS. NO CHANGE IN USE, OCCUPANCY, OR EGRESS.
M00806705-I1
11/24/2025
Signed off — Alteration
M00881251-I1
11/20/2025
Inspection — Pass-Final Boiler Equipment Inspection
Pass
View inspection ↗
11/14/2025
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
11/05/2025
Permit issued — Boiler Equipment
M00881251-I1-BE
07/23/2025
Inspection — No Access-Final PL - Up to 3 Requested Floors
No Access
View inspection ↗
07/15/2025
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
07/09/2025
Signed off — Alteration
RENOVATION OF APARTMENTS. PARTITION CHANGES TO NON-LOAD-BEARING WALLS AS PER PLANS. NO CHANGE IN USE, OCCUPANCY, OR EGRESS.
M00806681-S1
07/07/2025
Permit issued — Plumbing
M00806705-I1-PL
07/02/2025
Signed off — Alteration CO
FILED FOR THE INSTALLATION OF NEW ROOF DECK AND TO OBTAIN NEW CERTIFICATE OF OCCUPANCY.
M00889127-S1
07/02/2025
Special inspection requirement — Fenestration air leakage
Anatole Plotkin
07/02/2025
Special inspection requirement — Energy Code Compliance Inspections
Anatole Plotkin
07/02/2025
Special inspection requirement — Fire-Resistance Rated Construction
Anatole Plotkin
07/02/2025
Special inspection requirement — Lighting in dwelling units
Anatole Plotkin
07/02/2025
Special inspection requirement — Air barrier - visual inspection
Anatole Plotkin
07/02/2025
Special inspection requirement — Fenestration areas
Anatole Plotkin
07/02/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Anatole Plotkin
07/02/2025
Special inspection requirement — Final
Anatole Plotkin
07/02/2025
Special inspection requirement — Fenestration and door U-factor and product ratings
Anatole Plotkin
07/01/2025
Filed — Alteration
RENOVATION OF APARTMENTS. PARTITION CHANGES TO NON-LOAD-BEARING WALLS AS PER PLANS. NO CHANGE IN USE, OCCUPANCY, OR EGRESS.
M00806681-P5
06/20/2025
Inspection — Fail-Final General Construction Non-Directive 14
Fail
View inspection ↗
04/21/2025
Inspection — Fail-Final General Construction Non-Directive 14
Fail
View inspection ↗
04/15/2025
Special inspection requirement — HVAC-R and service water heating system controls
KEVIN KENDALL
04/15/2025
Special inspection requirement — Maintenance information
KEVIN KENDALL
04/15/2025
Special inspection requirement — Mechanical Systems
KEVIN KENDALL
04/15/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
KEVIN KENDALL
04/15/2025
Special inspection requirement — Final
KEVIN KENDALL
04/15/2025
Special inspection requirement — HVAC-R and service water heating equipment
KEVIN KENDALL
04/14/2025
Filed — Alteration
RENOVATION OF APARTMENTS. PARTITION CHANGES TO NON-LOAD-BEARING WALLS AS PER PLANS. NO CHANGE IN USE, OCCUPANCY, OR EGRESS.
M00806681-P4
04/14/2025
Filed — Alteration
PLUMBING WORK IN APARTMENTS AS PER PLANS. NO CHANGE IN USE, OCCUPANCY, OR EGRESS.
M00806705-P4
04/05/2025
Signed off — Alteration
PROPOSED INSTALLATION OF HEAVY DUTY SIDEWALK SHED AS PER PLANS. LIVE LOAD 300 LBS PER SQUARE FEET. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE. NO CHANGE IN USE, OCCUPANCY, OR EGRESS UNDER THIS APPLICATION.
M00835516-I1
04/05/2025
Signed off — Alteration
PROPOSED INSTALLATION OF DEBRIS CHUTE AS PER PLANS. CHUTE SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE. NO CHANGE IN USE, OCCUPANCY, OR EGRESS UNDER THIS APPLICATION.
M00835667-I1
02/07/2025
Permit issued — General Construction
M00806681-I1-GC
02/06/2025
Permit issued — General Construction
M00889127-I1-GC
01/28/2025
Special inspection requirement — HVAC-R and service water heating system controls
KEVIN KENDALL
01/28/2025
Special inspection requirement — Final
KEVIN KENDALL
01/28/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
KEVIN KENDALL
01/28/2025
Special inspection requirement — Maintenance information
KEVIN KENDALL
Latest 60 of 145 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionPermit IssuedIdeal Construction & Desi12/05/2025
DOB NOWBoiler EquipmentSigned-offOlympian Fuel Oil11/05/2025
DOB NOWPlumbingSigned-offPlumbing P & H07/07/2025
DOB NOWGeneral ConstructionSigned-offIdeal Construction & Desi02/07/2025
DOB NOWGeneral ConstructionPermit IssuedIdeal Construction & Desi02/06/2025
DOB NOWMechanical SystemsSigned-offElite Illusion Construction05/21/2024
DOB NOWGeneral ConstructionPermit IssuedElite Illusion Construction04/05/2024
DOB NOWStructuralSigned-offElite Illusion Construction04/04/2024
DOB NOWGeneral ConstructionSigned-offElite Illusion Construction10/23/2023
DOB NOWPlumbingSigned-offPlumbing P & H04/05/2023
DOB NOWGeneral ConstructionSigned-offElite Illusion Construction03/28/2023
DOB NOWProtection and Mechanical MethodsSigned-offS & J Construction Service03/02/2023
DOB NOWSidewalk ShedSigned-offS & J Construction Service02/28/2023
4 projects · most recent 07/15/2026
General Wiring
FiledStatusContractorScope
07/15/2026Permit IssuedMartinez Electrical ContGeneral Wiring
08/05/2025CompleteLaura Electrical Lighting—
08/17/2023CompleteSupreme ElectricGeneral Wiring
03/02/2023CompleteRichard Neu—
1 project · most recent 07/13/2026
Steel
FiledStatusContractorScope
07/13/2026Permit IssuedIdeal Construction & DesiSteel
▾Field Inspections (DOB CAP) — 8
DateTypeResultReport
04/06/2026Pass-Final CND-Occupancy InspectionPassView ↗
12/18/2025Fail-Final CND-Occupancy InspectionFailView ↗
11/20/2025Pass-Final Boiler Equipment InspectionPassView ↗
07/23/2025No Access-Final PL - Up to 3 Requested FloorsNo AccessView ↗
07/15/2025Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
06/20/2025Fail-Final General Construction Non-Directive 14FailView ↗
04/21/2025Fail-Final General Construction Non-Directive 14FailView ↗
11/17/2023Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 63
DateRequirementInspectorRole
05/04/2026Fire-Resistance Rated ConstructionAnatole Plotkinprogress
05/04/2026Exterior lighting powerAnatole Plotkinenergy_progress
05/04/2026Tenant Protection Plan Compliance—special
05/04/2026Fire-Resistant Penetrations and JointsAnatole Plotkinspecial
05/04/2026Energy Code Compliance InspectionsAnatole Plotkinprogress
03/26/2026Exterior lighting powerAnatole Plotkinenergy_progress
03/26/2026Fire-Resistant Penetrations and JointsAnatole Plotkinspecial
03/26/2026Fire-Resistance Rated ConstructionAnatole Plotkinprogress
03/26/2026Tenant Protection Plan Compliance—special
03/26/2026Energy Code Compliance InspectionsAnatole Plotkinprogress
07/02/2025Fenestration and door U-factor and product ratingsAnatole Plotkinenergy_progress
07/02/2025Air barrier - visual inspectionAnatole Plotkinenergy_progress
07/02/2025Fenestration air leakageAnatole Plotkinenergy_progress
07/02/2025Fire-Resistance Rated ConstructionAnatole Plotkinprogress
07/02/2025Lighting in dwelling unitsAnatole Plotkinenergy_progress
07/02/2025Energy Code Compliance InspectionsAnatole Plotkinprogress
07/02/2025FinalAnatole Plotkinprogress
07/02/2025Fire-Resistant Penetrations and JointsAnatole Plotkinspecial
07/02/2025Fenestration areasAnatole Plotkinenergy_progress
04/15/2025HVAC-R and service water piping design and insulationKEVIN KENDALLenergy_progress
04/15/2025Maintenance informationKEVIN KENDALLenergy_progress
04/15/2025FinalKEVIN KENDALLprogress
04/15/2025Mechanical SystemsKEVIN KENDALLspecial
04/15/2025HVAC-R and service water heating system controlsKEVIN KENDALLenergy_progress
04/15/2025HVAC-R and service water heating equipmentKEVIN KENDALLenergy_progress
Latest 25 of 63.
▾Documents — 119 on file (BIS + DOB NOW)
▸Plans & Drawings19
▸DOB NOWPlans/Sketch19
09/01/2026M00806705-P1Request digital key ↗
09/01/2026M00806705-P2Request digital key ↗
09/01/2026M00806705-P3Request digital key ↗
Showing 3 of 19 on file for this type
▸Seals & Professional Certifications76
▸DOB NOWProgress Inspector Seal & Signature49
09/27/2026M00806681-P2Open ↗
09/27/2026M00806681-P2Open ↗
09/27/2026M00806681-P2Open ↗
Showing 3 of 49 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature19
09/01/2026M00806705-I1Open ↗
09/01/2026M00806705-P1Open ↗
09/01/2026M00806705-P2Open ↗
Showing 3 of 19 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature8
09/27/2026M00806681-P2Open ↗
08/29/2026M00806681-P3Open ↗
08/28/2026M00889127-S1Open ↗
Showing 3 of 8 on file for this type
▸Safety & Tenant Protection3
▸DOB NOWStreet Tree Checklist3
08/29/2026M00889127-P1Open ↗
08/29/2026M00889127-I1Open ↗
08/14/2026M00889127-P2Open ↗
▸Environmental & Asbestos17
▸DOB NOWDEP ACP-5: Asbestos Assessment Report17
09/01/2026M00806705-P1Open ↗
09/01/2026M00806705-P2Open ↗
09/01/2026M00806705-P3Open ↗
Showing 3 of 17 on file for this type
▸Energy Compliance1
▸DOB NOWPreliminary Commissioning Report Certification1
08/13/2026M00806681-S1Open ↗
▸Other Documents3
▸DOB NOWProperty Ownership Certification3
08/29/2026M00889127-P1Open ↗
08/29/2026M00889127-I1Open ↗
08/14/2026M00889127-P2Open ↗