← Back
Office with commercial, 1-6 stories
Local 802 Senior Musicians Association
322 WEST 48 STREET · Hell's Kitchen · BIN 1025108
💬 Discuss this project
1920Year Built
6Stories
O5Building Class
R8Zoning
29,646 sfGross Floor Area
5Units
LL97 Covered4 Open Violations ▸
Office with commercial, 1-6 stories · 5,021 sf lot · 5.9 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralPlumbing
Roof8p · 1 filing · 11 docs
Floor 622p · 3 filings · 20 docs
Floor 514p · 2 filings · 20 docs
Floor 411p · 2 filings · 20 docs
Floor 312p · 2 filings · 20 docs
Floor 212p · 2 filings · 20 docs
Floor 112p · 2 filings · 20 docs
Cellar18p · 2 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
ASSOCIATE MUSICIANS OF GREATER NY1707/08/2026
KAJ NY CONSTRUCTION407/08/2026
LOCAL 802 CLUB CORPARATION303/22/2026
GREATER NEW YORK MUSICIAN CORP403/21/2026
48TH ST ASSOCIATES303/21/2026
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
GEIGER E A GROUP403/21/2026
BMB BUILDING CONSULTING1403/21/2026
KSTM EXPEDIRING SERVICES103/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
FAZIO CONSTRUCTION GROUPGeneral Contractor407/08/2026
IQ BUILDERS INCGeneral Contractor303/21/2026
MC SUPERSTRUCTURE INCGeneral Contractor203/21/2026
PAUL OLSENElectrical103/21/2026
GANNON CONTRACTING LLCGeneral Contractor104/09/2026
KAJ NY CONSTRUCTION INCGeneral Contractor107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
C.M. TESTING LABORATORY,1352712/31/2024
Building Lifecycle
All (76)Filed (12)Permit Issued (8)Signed Off (2)Violation (23)Objection (8)Special Inspection (23)
09/02/2025
Permit issued — Construction Fence
M01264707-I1-FN
08/04/2025
Filed — Alteration
Install temporary construction wood fence in front of building on sidewalk 3ft from building
M01264707-I1
07/10/2025
Signed off — Alteration
INSTALLATION OF 300 PSF SIDEWALK SHED AS PER PLANS. ALL EQUIPMENT SHALL COMPLY WITH CHAPTER #33 OF THE 2022 CODE. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
M01130231-I1
12/31/2024
Filed — Alteration
DEMO OF EXISTING HEATING AND COOLING SYSTEMS. ALL RELATED PIPING, WIRING, AND ACCESSORIES TO BE DEMOLISHED. PARTIAL DUCTWORK TO BE DEMOLISHED. INSTALL NEW VRF CONDENSERS, INDOOR AHUS, PIPING, DUCTWORK, ELECTRIC UNIT HEATERS, ERV UNITS, AND EXHAUST FANS
M01091204-S3
12/01/2024
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
11/29/2024
Filed — Alteration
INSTALLATION OF 300 PSF SIDEWALK SHED AS PER PLANS. ALL EQUIPMENT SHALL COMPLY WITH CHAPTER #33 OF THE 2022 CODE. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
M01130231-P1
11/15/2024
Permit issued — General Construction
M01091204-I1-GC
11/13/2024
Objection resolved — Addressed
11/13/2024
Objection resolved — Addressed
10/31/2024
Filed — Alteration
INSTALLATION OF 300 PSF SIDEWALK SHED AS PER PLANS. ALL EQUIPMENT SHALL COMPLY WITH CHAPTER #33 OF THE 2022 CODE. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
M01130231-I1
10/31/2024
Permit issued — Sidewalk Shed
M01130231-I1-SH
10/31/2024
Objection resolved — Addressed
10/21/2024
Objection resolved — Addressed
10/17/2024
Permit issued — General Construction
M01085079-I1-GC
10/11/2024
Permit issued — General Construction
M01102872-I1-GC
10/11/2024
Permit issued — Structural
M01102872-S1-ST
09/16/2024
Filed — Alteration
ADD STAIR BULKHEAD FOR 6-STORY EXISTING BUILDING.
M01102872-S1
09/13/2024
Filed — Alteration
ADD STAIR BULKHEAD FOR 6-STORY EXISTING BUILDING.
M01102872-I1
09/13/2024
Special inspection requirement — Insulation placement and R values
JOHN SEMIOLI
09/13/2024
Special inspection requirement — Fenestration air leakage
JOHN SEMIOLI
09/04/2024
Objection raised — Scope
09/04/2024
Objection raised — Other
09/04/2024
Objection raised — Scope
09/04/2024
Objection raised — Other
08/27/2024
Special inspection requirement — Final
JOHN SEMIOLI
08/27/2024
Special inspection requirement — Fire-Resistance Rated Construction
JOHN SEMIOLI
08/27/2024
Special inspection requirement — Energy Code Compliance Inspections
JOHN SEMIOLI
08/27/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
JOHN SEMIOLI
08/26/2024
Filed — Alteration
DEMO OF EXISTING HEATING AND COOLING SYSTEMS. ALL RELATED PIPING, WIRING, AND ACCESSORIES TO BE DEMOLISHED. PARTIAL DUCTWORK TO BE DEMOLISHED. INSTALL NEW VRF CONDENSERS, INDOOR AHUS, PIPING, DUCTWORK, ELECTRIC UNIT HEATERS, ERV UNITS, AND EXHAUST FANS
M01091204-S1
08/26/2024
Filed — Alteration
DEMO OF EXISTING HEATING AND COOLING SYSTEMS. ALL RELATED PIPING, WIRING, AND ACCESSORIES TO BE DEMOLISHED. PARTIAL DUCTWORK TO BE DEMOLISHED. INSTALL NEW VRF CONDENSERS, INDOOR AHUS, PIPING, DUCTWORK, ELECTRIC UNIT HEATERS, ERV UNITS, AND EXHAUST FANS
M01091204-I1
08/21/2024
Special inspection requirement — Energy Code Compliance Inspections
JOHN SEMIOLI
08/21/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
JOHN SEMIOLI
08/20/2024
Special inspection requirement — Fire-Resistance Rated Construction
JOHN SEMIOLI
08/20/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
JOHN SEMIOLI
08/20/2024
Special inspection requirement — Energy Code Compliance Inspections
JOHN SEMIOLI
08/20/2024
Special inspection requirement — Fenestration air leakage
JOHN SEMIOLI
08/20/2024
Special inspection requirement — Air barrier - visual inspection
JOHN SEMIOLI
08/20/2024
Special inspection requirement — Fenestration and door U-factor and product ratings
JOHN SEMIOLI
08/20/2024
Special inspection requirement — Fenestration areas
JOHN SEMIOLI
08/20/2024
Special inspection requirement — Interior lighting power
JOHN SEMIOLI
08/20/2024
Special inspection requirement — Vestibules
JOHN SEMIOLI
08/12/2024
Filed — Alteration
PROPOSE INTERIOR NON-STRUCTURAL DEMOLITION WORKS AS PER PLAN. THE PLUMBING WORK TYPE SHALL BE DONE UNDER SEPARATE APPLICATION. NO CHANGE IN USE, EGRESS, AND OCCUPANCY.
M01085079-I1
08/12/2024
Filed — Alteration
PROPOSE INTERIOR NON-STRUCTURAL DEMOLITION WORKS AS PER PLAN. THE PLUMBING WORK TYPE SHALL BE DONE UNDER SEPARATE APPLICATION. NO CHANGE IN USE, EGRESS, AND OCCUPANCY.
M01085079-S1
08/05/2024
Special inspection requirement — Final
JOHN SEMIOLI
07/31/2024
Special inspection requirement — Energy Code Compliance Inspections
JOHN SEMIOLI
07/31/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
JOHN SEMIOLI
07/23/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
JOHN SEMIOLI
07/23/2024
Special inspection requirement — Final
JOHN SEMIOLI
07/23/2024
Special inspection requirement — Energy Code Compliance Inspections
JOHN SEMIOLI
02/22/2023
Signed off — Alteration
M08022207-I1
11/21/2022
Permit issued — General Construction
M08022207-I1-GC
11/17/2022
Filed — Alteration
M08022207-I1
10/05/2022
Permit issued — Sidewalk Shed
M08005065-I1-SH
10/04/2022
Filed — Alteration
M08005065-I1
09/08/2020
Violation issued (ECB, closed)
Elevators
05/02/2019
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
04/06/2018
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
02/07/2017
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
01/03/2017
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
03/03/2015
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
Latest 60 of 76 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWConstruction FencePermit IssuedGANNON CONTRACTING LLC09/02/2025
DOB NOWGeneral ConstructionPermit IssuedFAZIO CONSTRUCTION GROUP11/15/2024
DOB NOWSidewalk ShedSigned-offMC SUPERSTRUCTURE INC10/31/2024
DOB NOWGeneral ConstructionPermit IssuedFAZIO CONSTRUCTION GROUP10/17/2024
DOB NOWGeneral ConstructionPermit IssuedFAZIO CONSTRUCTION GROUP10/11/2024
DOB NOWStructuralPermit IssuedFAZIO CONSTRUCTION GROUP10/11/2024
DOB NOWGeneral ConstructionSigned-offIQ BUILDERS INC11/21/2022
DOB NOWSidewalk ShedPermit IssuedKAJ NY CONSTRUCTION INC10/05/2022
BISFBISSUEDAPPROVED OIL CO OF BKLYN10/16/2014
BISMHISSUEDKABACK ENTERPRISES INC02/27/2003
BISOTISSUEDPRIMO CONSTRUCTION MGT08/03/1999
BISOTISSUEDMANHATTAN BUSINESS INTERIORS INC06/04/1993
BISSPISSUEDMANHATTAN AUTOMATIC SPRINK,CORP10/07/1992
BIS—ISSUEDAMBASSADOR CONSTRUCTION06/03/1992
BISPLISSUEDSBA03/24/1992
BISMHISSUEDAMBASSADOR CONSTRUCTION CO.INC03/20/1992
BISOTISSUEDAMBASSADOR CONSTRUCTION CO.INC03/20/1992
1 project · most recent 12/31/2024
Heating and Air Conditioning Systems Ventilation Systems
FiledStatusContractorScopeMake / Model / Capacity
12/31/2024Permit IssuedFAZIO CONSTRUCTION GROUPHeating and Air Conditioning Systems, Ventilation Systems
Heat / Cool
Lg ARUM121BTE5 135,000 BTU · Vrf Outdoor ×3
ARUM144BTE5 162,000 BTU · Vrf Outdoor ×2
ARUM036GSS5 42,000 BTU · Vrf Outdoor ×1
ARUM072BTE5 81,000 BTU · Vrf Outdoor ×1
ARUM241BTE5 243,000 BTU · Vrf Outdoor ×1
Ventilation
Lg ARVU063ZEA2 600 CFM · Vrf Outdoor ×4
ARVU053ZEA2 375 CFM · Vrf Indoor ×2
ARVU093ZFA2 880 CFM · Vrf Indoor ×1
Greenheck G-130-VG 1,625 CFM · Exhaust Fan ×1
Vts AVS055-L-FRMCV 5,000 CFM ×1
1 project · most recent 12/31/2024
Water/Sanitary
FiledStatusContractorScope
12/31/2024——Water/Sanitary
2 projects · most recent 11/20/2024
General Wiring
FiledStatusContractorScope
11/20/2024Permit IssuedSALVATORE CAMPISI & SONSGeneral Wiring
10/23/2024CompleteNASH ELECTRIC SERVICES IN—
1 project · most recent 09/16/2024
Steel
FiledStatusContractorScope
09/16/2024Permit IssuedFAZIO CONSTRUCTION GROUPSteel
1 project · most recent 08/04/2025
Fence
FiledStatusContractorScope
08/04/2025Permit IssuedGANNON CONTRACTING LLCFence
▾Special Inspection Requirements (DOB NOW) — 23
DateRequirementInspectorRole
09/13/2024Insulation placement and R valuesJOHN SEMIOLIenergy_progress
09/13/2024Fenestration air leakageJOHN SEMIOLIenergy_progress
08/27/2024FinalJOHN SEMIOLIprogress
08/27/2024Fire-Resistance Rated ConstructionJOHN SEMIOLIprogress
08/27/2024Energy Code Compliance InspectionsJOHN SEMIOLIprogress
08/27/2024Fire-Resistant Penetrations and JointsJOHN SEMIOLIspecial
08/21/2024Energy Code Compliance InspectionsJOHN SEMIOLIprogress
08/21/2024Fire-Resistant Penetrations and JointsJOHN SEMIOLIspecial
08/20/2024Fire-Resistance Rated ConstructionJOHN SEMIOLIprogress
08/20/2024Fire-Resistant Penetrations and JointsJOHN SEMIOLIspecial
08/20/2024Energy Code Compliance InspectionsJOHN SEMIOLIprogress
08/20/2024Fenestration air leakageJOHN SEMIOLIenergy_progress
08/20/2024Air barrier - visual inspectionJOHN SEMIOLIenergy_progress
08/20/2024Fenestration and door U-factor and product ratingsJOHN SEMIOLIenergy_progress
08/20/2024Fenestration areasJOHN SEMIOLIenergy_progress
08/20/2024Interior lighting powerJOHN SEMIOLIenergy_progress
08/20/2024VestibulesJOHN SEMIOLIenergy_progress
08/05/2024FinalJOHN SEMIOLIprogress
07/31/2024Energy Code Compliance InspectionsJOHN SEMIOLIprogress
07/31/2024Fire-Resistant Penetrations and JointsJOHN SEMIOLIspecial
07/23/2024Fire-Resistant Penetrations and JointsJOHN SEMIOLIspecial
07/23/2024FinalJOHN SEMIOLIprogress
07/23/2024Energy Code Compliance InspectionsJOHN SEMIOLIprogress
▾Documents — 82 on file (BIS + DOB NOW)
▸Plans & Drawings11
▸DOB NOWPlans/Sketch11
09/01/2026M08005065-I1Request digital key ↗
09/01/2026M08022207-I1Request digital key ↗
08/26/2026M01085079-S1Request digital key ↗
Showing 3 of 11 on file for this type
▸Applications & Permits5
▸BISWORK PERMIT APPLICATION2
10/15/2014140251509Open ↗
10/15/2014140251509Open ↗
▸BISPLACE OF ASSEMBLY2
09/11/2010110396385Open ↗
11/22/2008110396385Open ↗
▸BISPLAN / WORK APPROVAL APPLICATION1
10/15/2014140251509Open ↗
▸Seals & Professional Certifications33
▸DOB NOWDPL-1: Design Professional Seal & Signature11
09/01/2026M08022207-I1Open ↗
08/26/2026M01085079-S1Open ↗
08/26/2026M01085079-I1Open ↗
Showing 3 of 11 on file for this type
▸DOB NOWProgress Inspector Seal & Signature8
09/29/2026M01091204-I1Open ↗
09/29/2026M01091204-I1Open ↗
09/02/2026M01102872-I1Open ↗
Showing 3 of 8 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature5
09/29/2026M01091204-I1Open ↗
09/02/2026M01102872-I1Open ↗
09/01/2026M01085079-I1Open ↗
Showing 3 of 5 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION4
07/17/2015140251509Open ↗
09/11/2010110396385Open ↗
11/21/2008110396385Open ↗
Showing 3 of 4 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT1
10/15/2014140251509Open ↗
▸BISPROFESSIONAL CERTIFIED CHECKLIST1
11/21/2008110396385Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY1
10/15/2014140251509Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM1
11/21/2008110396385Open ↗
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION1
10/15/2014140251509Open ↗
▸Trade Schedules & Equipment1
▸BISSCHEDULE C - HEATING & COMBUSTION EQUIPMENT1
10/15/2014140251509Open ↗
▸Safety & Tenant Protection14
▸DOB NOWHPD-2: Clinton Special District Anti-Harassment Checklist12
08/25/2026M01130231-I1Open ↗
08/13/2026M01264707-I1Open ↗
08/13/2026M01091204-I1Open ↗
Showing 3 of 12 on file for this type
▸DOB NOWCertificate of No Harassment2
08/13/2026M01085079-I1Open ↗
08/13/2026M01091204-I1Open ↗
▸Environmental & Asbestos9
▸DOB NOWDEP ACP-5: Asbestos Assessment Report8
09/01/2026M08022207-I1Open ↗
08/26/2026M01085079-S1Open ↗
08/26/2026M01085079-I1Open ↗
Showing 3 of 8 on file for this type
▸BISASBESTOS: CERTIFICATION (DEP ACP5)1
10/15/2014140251509Open ↗
▸Energy Compliance3
▸BISAS-BUILT ENERGY ANALYSIS1
07/17/2015140251509Open ↗
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS1
07/17/2015140251509Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY FOR ENERGY CODE PROGRESS INSPECTIONS1
10/15/2014140251509Open ↗
▸Inspections & Test Reports1
▸BISTECHNICAL REPORT: RESPONSIBILITY1
10/15/2014140251509Open ↗
▸Approvals, Objections & Sign-offs2
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST1
07/17/2015140251509Open ↗
▸BISADMINISTRATIVE OBJECTIONS1
11/22/2008110396385Open ↗
▸Cost, Insurance & Ownership2
▸BISCOST AFFIDAVIT2
07/17/2015140251509Open ↗
10/15/2014140251509Open ↗
▸Filing & Intake Forms1
▸BISEFILING JOB APPLICATION COVER SHEET1
10/15/2014140251509Open ↗