← Back
Condo, residential tower (mixed-use, multi-family elevator) [derived]
Riverside Condominium
3220 ARLINGTON AVENUE · BIN 2109355
💬 Discuss this project
2004Year Built
13Stories
RMBuilding Class
R6AZoning
74,467 sfGross Floor Area
37Units
LL97 CoveredRent Stabilized0 Open ViolationsFISP: SWARMPFDNY Report ↗
Condo, residential tower (mixed-use, multi-family elevator) [derived] · 18,411 sf lot · 4.04 FAR built · Flood zone X
Locations of Work
ArchitectureMechanicalPlumbingGeneral
Roof1p · 1 filing · 4 docs
Floor 24p · 4 filings · 20 docs
Floor 1
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
BEDROCK PRESCHOOL1207/08/2026
INTERSYSTEM INSTALLATION CORP707/08/2026
JONATHAN D BONIUK MD PC503/22/2026
RIVERSTONE CONDOMINIUM303/22/2026
GOODMAN MANAGEMENT703/22/2026
TRIANGLE ENTERPISE NYC 1103/22/2026
OWNER OF 3226 ARLINGTON A103/22/2026
RIVERSIDE CONDOMINIUM BOA103/22/2026
SITE WORKS CONTRACTING CO203/22/2026
RIVERDALE CONSTRUCTION IN603/22/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
PRUDIGM ENGINEERING LLC612/13/2023
ROGER DE ELECTRIC CO.102/02/2023
ASHRAF CORP106/06/2022
GABY TCHILINGUIRIAN R.A.105/03/2021
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
CONVERSANO ASSOCIATES, INC.603/21/2026
M W EXPEDITING203/21/2026
Rigid Structural Design, LLC103/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
BEN'S GEN'L CONTRACT CORPGeneral Contractor407/08/2026
ARNOLD BIAS PRODUCTS INCGeneral Contractor303/22/2026
HUDSON VIEW CONSTRUCTIONGeneral Contractor303/22/2026
INSTYLE HOME RENOVATIONSGeneral Contractor303/21/2026
INTERSYSTEM INSTALLATIONGeneral Contractor207/08/2026
BREFFNI MECHANICAL INCGeneral Contractor203/21/2026
COTTAM HEATING & AIR CONDIT.General Contractor203/21/2026
BEDROCK PLBG. & HTG., INCPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
PRUDIGM ENGINEERING LLCU4304612/13/2023
SALAMON ENGINEERING PLLC1264102/02/2023
GABY TCHILINGUIRIAN R.A.2540105/03/2021
Building Lifecycle
All (121)Filed (9)Permit Issued (8)Signed Off (7)Facade (FISP) (6)Violation (60)Inspection (2)Special Inspection (29)
08/06/2026
Signed off — Alteration
minor plumbing work on the second floor .Install 3 new toilet and install 3 new lavatory as per plans.
X00520073-I1
06/12/2026
Signed off — Alteration
REPLACE EXISTING DAIKIN 12TON UNIT WITH PROPOSED MITSUBISHI UNITS AS PER PLANS.
X00937995-I1
06/12/2026
Signed off — Alteration
Mechanical work on the 2nd floor and 2nd floor terrace for Installation of (2) 3 ton split system air cooled condensing unit and installation of (4) indoor cassettes split system evaporator units as per plans.
X00520060-I1
06/12/2026
Signed off — Alteration
Installation of (1) HVAC unit on the 2nd floor Roof terrace as per plans .No change in use ,egress or Occupancy
X00749487-I1
12/04/2025
Violation issued (FDNY_NOV, closed)
02/26/2024
Violation issued (FDNY_NOV, closed)
12/13/2023
Filed — Alteration
REPLACE EXISTING DAIKIN 12TON UNIT WITH PROPOSED MITSUBISHI UNITS AS PER PLANS.
X00937995-P2
10/23/2023
Permit issued — Mechanical Systems
X00937995-I1-MS
09/27/2023
Filed — Alteration
REPLACE EXISTING DAIKIN 12TON UNIT WITH PROPOSED MITSUBISHI UNITS AS PER PLANS.
X00937995-I1
09/18/2023
Signed off — Alteration
Installation of temporary supported scaffold as per plan submitted. Work shall comply with 2014 building codes chapter 33. No change in use, egress and/or occupancy with this application.
X00750937-I1
06/08/2023
Permit issued — Supported Scaffold
X00750937-I1-SF
03/29/2023
Signed off — Alteration
X00821708-I1
03/14/2023
Permit issued — Mechanical Systems
X00821708-I1-MS
02/02/2023
Filed — Alteration
X00821708-I1
01/06/2023
Cycle 9 facade report signed — SWARMP
10/14/2022
Cycle 9 facade inspection completed
06/08/2022
Permit issued — Mechanical Systems
X00749487-I1-MS
06/07/2022
Permit issued — Supported Scaffold
X00750937-I1-SF
06/06/2022
Filed — Alteration
Installation of temporary supported scaffold as per plan submitted. Work shall comply with 2014 building codes chapter 33. No change in use, egress and/or occupancy with this application.
X00750937-I1
06/03/2022
Filed — Alteration
Installation of (1) HVAC unit on the 2nd floor Roof terrace as per plans .No change in use ,egress or Occupancy
X00749487-I1
06/03/2022
Special inspection requirement — Fire-Resistant Penetrations and Joints
Naeem Anwar
06/03/2022
Special inspection requirement — Maintenance information
Naeem Anwar
06/03/2022
Special inspection requirement — HVAC-R and service water heating system controls
Naeem Anwar
06/03/2022
Special inspection requirement — HVAC-R and service water heating equipment
Naeem Anwar
06/03/2022
Special inspection requirement — HVAC-R and service water piping design and insulation
Naeem Anwar
06/03/2022
Special inspection requirement — Energy Code Compliance Inspections
Naeem Anwar
06/01/2022
Special inspection requirement — Mechanical Systems
Naeem Anwar
06/01/2022
Special inspection requirement — Final
Naeem Anwar
05/20/2022
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
05/19/2022
Violation issued (FDNY_NOV, closed)
04/09/2022
Cycle 9 facade report submitted
12/23/2021
Violation issued (FDNY_NOV, closed)
12/20/2021
Violation issued (ECB, closed)
Construction
12/20/2021
Violation issued (ECB, closed)
Construction
09/10/2021
Violation issued (ECB, closed)
Unknown
07/30/2021
Signed off — Alteration
Alteration being filed for the interior renovation of existing daycare facility creating (2) two new classrooms. No change in use, egress or occupancy.
X00514579-I1
07/19/2021
Special inspection requirement — HVAC-R and service water piping design and insulation
Naeem Anwar
07/19/2021
Special inspection requirement — Mechanical Systems
Naeem Anwar
07/19/2021
Special inspection requirement — Fire-Resistant Penetrations and Joints
Naeem Anwar
07/19/2021
Special inspection requirement — Final
Naeem Anwar
07/19/2021
Special inspection requirement — Energy Code Compliance Inspections
Naeem Anwar
07/19/2021
Special inspection requirement — Maintenance information
Naeem Anwar
07/19/2021
Special inspection requirement — Shutoff dampers
Naeem Anwar
07/19/2021
Special inspection requirement — HVAC-R and service water heating equipment
Naeem Anwar
07/19/2021
Special inspection requirement — HVAC-R and service water heating system controls
Naeem Anwar
07/16/2021
Filed — Alteration
Mechanical work on the 2nd floor and 2nd floor terrace for Installation of (2) 3 ton split system air cooled condensing unit and installation of (4) indoor cassettes split system evaporator units as per plans.
X00520060-P1
07/08/2021
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
07/05/2021
Special inspection requirement — Energy Code Compliance Inspections
Naeem Anwar
07/05/2021
Special inspection requirement — Fire-Resistant Penetrations and Joints
Naeem Anwar
07/05/2021
Special inspection requirement — Final
Naeem Anwar
07/05/2021
Special inspection requirement — Mechanical Systems
Naeem Anwar
07/05/2021
Special inspection requirement — Shutoff dampers
Naeem Anwar
07/05/2021
Special inspection requirement — Maintenance information
Naeem Anwar
07/05/2021
Special inspection requirement — HVAC-R and service water heating system controls
Naeem Anwar
07/05/2021
Special inspection requirement — HVAC-R and service water piping design and insulation
Naeem Anwar
07/05/2021
Special inspection requirement — HVAC-R and service water heating equipment
Naeem Anwar
06/14/2021
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
05/27/2021
Permit issued — Mechanical Systems
X00520060-I1-MS
05/17/2021
Permit issued — Plumbing
X00520073-I1-PL
05/12/2021
Filed — Alteration
minor plumbing work on the second floor .Install 3 new toilet and install 3 new lavatory as per plans.
X00520073-I1
Latest 60 of 121 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWMechanical SystemsSigned-offBREFFNI MECHANICAL10/23/2023
DOB NOWSupported ScaffoldSigned-offINTERSYSTEM INSTALLATION06/08/2023
DOB NOWMechanical SystemsSigned-offCOTTAM HEATING AIR COND03/14/2023
DOB NOWMechanical SystemsSigned-offINSTYLE HOME RENOVATIONS06/08/2022
DOB NOWSupported ScaffoldSigned-offINTERSYSTEM INSTALLATION06/07/2022
DOB NOWMechanical SystemsSigned-offBEN'S GEN'L CONTRACT CORP05/27/2021
DOB NOWPlumbingSigned-offBEDROCK PLBG. & HTG., INC05/17/2021
DOB NOWGeneral ConstructionSigned-offBEN'S GEN'L CONTRACT CORP05/10/2021
BISCCISSUEDRIVERSTONE CONDOMINIUM02/03/2026
BISCCISSUEDRIVERSTONE CONDOMINIUM02/02/2026
BISOTISSUEDPRAT ENTERPRISES CORP01/20/2023
BISEQISSUEDINTERSYSTEM INSTALLATION12/13/2022
BISOTISSUEDPRATT CONSTRUCTION & REST05/16/2022
BISEQISSUEDINTERSYSTEM INSTALLATION12/15/2021
BISEQISSUEDINTERSYSTEM INSTALLATION02/10/2021
BISOTISSUEDPRATT CONSTRUCTION & REST01/15/2021
BISEQISSUEDINTERSYSTEM INSTALLATION08/03/2020
BISEQISSUEDINTERSYSTEM INSTALLATION07/15/2020
BISOTISSUEDPRATT CONSTRUCTION & REST05/27/2020
BISEQISSUEDINTERSYSTEM INSTALLATION02/20/2020
BISEQISSUEDINTERSYSTEM INSTALLATION08/01/2019
BISOTISSUEDPRATT CONSTRUCTION & REST05/22/2019
BISEQISSUEDINTERSYSTEM INSTALLATION03/07/2019
BISEQISSUEDINTERSYSTEM S&S CORP08/06/2018
BISEQISSUEDINTERSYSTEM S&S CORP07/26/2018
BISOTISSUEDPRATT CONSTRUCTION & REST05/17/2018
BISEQISSUEDINTERSYSTEM S&S CORP03/14/2018
BISOTISSUEDPRATT CONSTRUCTION & REST12/12/2017
BISEQISSUEDINTERSYSTEM S&S CORP08/07/2017
BISEQISSUEDINTERSYSTEM S&S CORP08/04/2017
BISOTISSUEDPRATT CONSTRUCTION & REST05/22/2017
BISEQISSUEDINTERSYSTEM S&S CORP08/15/2016
BISEQISSUEDINTERSYSTEM S&S CORP08/11/2016
BISOTISSUEDPRATT CONSTRUCTION & REST05/25/2016
BIS—ISSUEDHUDSON VIEW CONSTRUCTION05/11/2016
BISMHISSUEDGOOD-WILL MECHANICAL CORP.04/18/2016
BISOTISSUEDPRATT CONSTRUCTION & REST01/11/2016
BISEQISSUEDTRIANGLE ENTERPRISE NYC I10/17/2015
BISEQISSUEDINTERSYSTEM S&S CORP08/19/2015
BISEQISSUEDINTERSYSTEM S&S CORP08/19/2015
+ 18 more permits on file
1 project · most recent 06/03/2022
Air Conditioning Systems
FiledStatusContractorScopeMake / Model / Capacity
06/03/2022Signed-offINSTYLE HOME RENOVATIONSAir Conditioning Systems
Cooling
Haier HC48D1VAE 48,000 BTU · Condensing Unit ×1
1 project · most recent 05/12/2021
Water/Sanitary
FiledStatusContractorScope
05/12/2021Signed-offBEDROCK PLBG. & HTG., INCWater/Sanitary
2 projects · most recent 08/13/2021
General Wiring
FiledStatusContractorScope
08/13/2021CompleteALL CITY ELECTRICAL INCGeneral Wiring
10/14/2019Permit IssuedSNJ ELECTL CONTRG LLC—
▾Field Inspections (DOB CAP) — 2
DateTypeResultReport
07/08/2021Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
06/14/2021Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 29
DateRequirementInspectorRole
06/03/2022Fire-Resistant Penetrations and JointsNaeem Anwarspecial
06/03/2022Maintenance informationNaeem Anwarenergy_progress
06/03/2022HVAC-R and service water heating system controlsNaeem Anwarenergy_progress
06/03/2022HVAC-R and service water heating equipmentNaeem Anwarenergy_progress
06/03/2022HVAC-R and service water piping design and insulationNaeem Anwarenergy_progress
06/03/2022Energy Code Compliance InspectionsNaeem Anwarprogress
06/01/2022Mechanical SystemsNaeem Anwarspecial
06/01/2022FinalNaeem Anwarprogress
07/19/2021HVAC-R and service water piping design and insulationNaeem Anwarenergy_progress
07/19/2021Mechanical SystemsNaeem Anwarspecial
07/19/2021Fire-Resistant Penetrations and JointsNaeem Anwarspecial
07/19/2021FinalNaeem Anwarprogress
07/19/2021Energy Code Compliance InspectionsNaeem Anwarprogress
07/19/2021Maintenance informationNaeem Anwarenergy_progress
07/19/2021Shutoff dampersNaeem Anwarenergy_progress
07/19/2021HVAC-R and service water heating equipmentNaeem Anwarenergy_progress
07/19/2021HVAC-R and service water heating system controlsNaeem Anwarenergy_progress
07/05/2021Energy Code Compliance InspectionsNaeem Anwarprogress
07/05/2021Fire-Resistant Penetrations and JointsNaeem Anwarspecial
07/05/2021FinalNaeem Anwarprogress
07/05/2021Mechanical SystemsNaeem Anwarspecial
07/05/2021Shutoff dampersNaeem Anwarenergy_progress
07/05/2021Maintenance informationNaeem Anwarenergy_progress
07/05/2021HVAC-R and service water heating system controlsNaeem Anwarenergy_progress
07/05/2021HVAC-R and service water piping design and insulationNaeem Anwarenergy_progress
Latest 25 of 29.
▾Documents — 521 on file (BIS + DOB NOW)
▸Plans & Drawings9
▸DOB NOWPlans/Sketch9
08/25/2026X00514579-I1Request digital key ↗
08/25/2026X00520073-I1Request digital key ↗
08/25/2026X00520060-I1Request digital key ↗
Showing 3 of 9 on file for this type
▸Applications & Permits116
▸BISPLAN / WORK APPROVAL APPLICATION58
02/13/2026220564501Open ↗
02/13/2026220564529Open ↗
07/01/2025200859053Open ↗
Showing 3 of 58 on file for this type
▸BISWORK PERMIT APPLICATION54
02/13/2026220564529Open ↗
02/13/2026220564501Open ↗
01/20/2023220546121Open ↗
Showing 3 of 54 on file for this type
▸BISNon-Directive 14 Construction Sign Off Including Sign Applications3
08/24/2018200859053Open ↗
Showing 1 of 3 on file for this type
▸BISREQUEST FOR CERTIFICATE OF OCCUPANCY WITH OPEN APPLICATION(S)1
10/01/2025200946343Open ↗
▸Seals & Professional Certifications106
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION41
04/30/2019220546121Open ↗
04/30/2019220546121Open ↗
04/30/2019220546121Open ↗
Showing 3 of 41 on file for this type
▸DOB NOWProgress Inspector Seal & Signature19
09/02/2026X00520073-I1Open ↗
09/02/2026X00520073-I1Open ↗
09/01/2026X00520060-I1Open ↗
Showing 3 of 19 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST9
12/19/2016220564501Open ↗
12/19/2016220564529Open ↗
Showing 2 of 9 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature9
08/25/2026X00514579-I1Open ↗
08/25/2026X00520060-I1Open ↗
08/25/2026X00520060-P1Open ↗
Showing 3 of 9 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT8
03/12/2018240216529Open ↗
12/19/2016220564501Open ↗
12/19/2016220564529Open ↗
Showing 3 of 8 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature6
09/02/2026X00520073-I1Open ↗
09/01/2026X00520060-I1Open ↗
09/01/2026X00520060-I1Open ↗
Showing 3 of 6 on file for this type
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION5
03/12/2018240216529Open ↗
10/15/2015240118029Open ↗
08/18/2015240110456Open ↗
Showing 3 of 5 on file for this type
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY5
03/12/2018240216529Open ↗
10/15/2015240118029Open ↗
08/18/2015240110456Open ↗
Showing 3 of 5 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM4
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 4 on file for this type
▸Trade Schedules & Equipment38
▸BISSELF-CERT PLUMBING NOTICE15
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 15 on file for this type
▸BISFA - FDNY APPROVAL : FD-FAA7
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 7 on file for this type
▸BISSCHEDULE B - PLUMBING5
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 5 on file for this type
▸BISEQUIPMENT USE PERMITS3
12/29/2015220083442Open ↗
Showing 1 of 3 on file for this type
▸BISSPRINKLER INSP REPORT : FP-853
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸BISEQUIPMENT USE APPLICATION/PERMIT3
12/29/2015220083442Open ↗
Showing 1 of 3 on file for this type
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISPLUMBING - SUPPORTING DOCUMENTATION1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Safety & Tenant Protection1
▸BISTenant Protection Plan and Notes1
12/05/2017220546121Open ↗
▸Environmental & Asbestos10
▸BISASBESTOS EXEMPTION CERTIFICATION LETTER6
12/19/2016220564529Open ↗
Showing 1 of 6 on file for this type
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISASBESTOS: CERTIFICATION (DEP ACP5)1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISASBESTOS: EXEMPTION (ASB4)1
12/14/2016220564501Open ↗
▸Energy Compliance22
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS10
04/12/2019220546121Open ↗
07/25/2017220546121Open ↗
08/19/2016220546121Open ↗
Showing 3 of 10 on file for this type
▸DOB NOWEN2: As Built Energy Analysis.4
08/25/2026X00520073-I1Open ↗
08/13/2026X00520060-I1Open ↗
08/13/2026X00514579-I1Open ↗
Showing 3 of 4 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISENERGY CODE COMPLIANCE INSPECTIONS1
08/27/2025220546121Open ↗
▸BISAIR SEALING AND INSULATION - VISUAL1
08/27/2025220546121Open ↗
▸BISAS-BUILT ENERGY ANALYSIS (EN2)1
08/27/2025220546121Open ↗
▸BISELECTRICAL APPLICATION FOR SIDEWALK SHED LIGHTING1
08/18/2015240110456Open ↗
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY FOR ENERGY CODE PROGRESS INSPECTIONS1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Inspections & Test Reports18
▸BISTECHNICAL REPORT: RESPONSIBILITY13
02/05/2026220564529Open ↗
12/01/2025220564501Open ↗
12/01/2025220564529Open ↗
Showing 3 of 13 on file for this type
▸BISWALL PANELS, CURTAIN WALLS, AND VENEERS1
08/27/2025220546121Open ↗
▸BISSTRUCTURAL STABILITY - ALTERATIONS OF EXISTING BUILDINGS1
08/27/2025220546121Open ↗
▸BISMASONRY1
08/27/2025220546121Open ↗
▸BISPOST-INSTALLED ANCHORS1
08/27/2025220546121Open ↗
▸BIS2008 CODE TR1 REQUIRED1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Approvals, Objections & Sign-offs99
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST50
02/05/2026220564529Open ↗
02/05/2026220564501Open ↗
08/29/2025220546121Open ↗
Showing 3 of 50 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION17
12/16/2021240110456Open ↗
08/28/2020240110456Open ↗
08/04/2020240110456Open ↗
Showing 3 of 17 on file for this type
▸BISADMINISTRATIVE OBJECTIONS11
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 11 on file for this type
▸BISSCHEDULE A - OCCUPANCY / USE6
08/16/2021200859053Open ↗
08/11/2021200859053Open ↗
07/20/2021200859053Open ↗
Showing 3 of 6 on file for this type
▸BISSHED LETTER6
12/15/2022240110456Open ↗
12/16/2021240110456Open ↗
08/28/2020240110456Open ↗
Showing 3 of 6 on file for this type
▸BISSUPERSEDING LETTER5
01/20/2023220546121Open ↗
08/02/2019240110465Open ↗
04/18/2016220344802Open ↗
Showing 3 of 5 on file for this type
▸BISFINAL3
03/07/2022240110465Open ↗
03/06/2022240216529Open ↗
03/06/2022240216529Open ↗
▸BISFire Department Approval1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Cost, Insurance & Ownership35
▸BISCOST AFFIDAVIT32
02/09/2026200946343Open ↗
01/07/2026200946343Open ↗
10/03/2025200946343Open ↗
Showing 3 of 32 on file for this type
▸BISLL58/88-CIVIL PENALTY AFFIDAVIT2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISCOST AFFIDAVIT (FINAL): PW31
08/27/2025220546121Open ↗
▸Filing & Intake Forms63
▸BISEFILING COVER SHEET20
03/14/2017220587363Open ↗
12/19/2016220564501Open ↗
12/19/2016220564529Open ↗
Showing 3 of 20 on file for this type
▸BISADDITIONAL INFORMATION19
07/01/2025200859053Open ↗
08/23/2023200859053Open ↗
08/23/2023200859053Open ↗
Showing 3 of 19 on file for this type
▸BISBOROUGH INTAKE FORM19
01/20/2023220546121Open ↗
12/15/2022240110456Open ↗
12/16/2021240110456Open ↗
Showing 3 of 19 on file for this type
▸BISEFILING JOB APPLICATION COVER SHEET5
03/12/2018240216529Open ↗
10/15/2015240118029Open ↗
08/18/2015240110456Open ↗
Showing 3 of 5 on file for this type
▸Other Documents4
▸BISOP-129 INTERNAL (SECONDARY) BACKFLOW PREVENTION DEVICE TEST REPORT2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISECCCNYS ANALYSIS1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISPLOT DIAGRAM1
03/14/2017220587363Open ↗