← Back
Two stories - detached, small or mid-size
3220 MIDDLETOWN ROAD
BRONX · BIN 2075786
💬 Discuss this project
1920Year Built
2Stories
A1Building Class
R3AZoning
2,064 sfGross Floor Area
1Units
0 Open Violations
Two stories - detached, small or mid-size · 4,239 sf lot · 0.49 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanicalPlumbing
Floor 213p · 2 filings · 20 docs
Floor 111p · 2 filings · 20 docs
Cellar10p · 2 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
COLONIAL MGMT CORP503/22/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
02/04/2021$505K—Private party → Private party$245/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
TRINITY SOLAR LLC205/08/2025
AR ARCHITECT P.C711/02/2022
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
ADAC CONSTRUCTION403/21/2026
ACA ASSOCIATES203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
COLONIAL MGMT ASSOCIATESGeneral Contractor1507/08/2026
TRINITY SOLAR LLCGeneral Contractor303/21/2026
REDLINE ELECTRIC INCElectrical203/22/2026
ROY B PLUMBING & HEATINGPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
JAY KAVI CORPORATION8500205/08/2025
AR ARCHITECT P.C.1171611/02/2022
Building Lifecycle
All (86)Filed (9)Permit Issued (11)Signed Off (3)Violation (6)Inspection (11)Objection (20)Special Inspection (26)
05/19/2025
Signed off — Alteration
X01011970-I1
05/08/2025
Filed — Alteration
X01011970-P1
05/07/2025
Signed off — Alteration
CONSTRUCTION FENCE
X00552868-I1
05/07/2025
Signed off — Alteration CO
REMOVE EXISTING BOILER, HOT WATER AND BASEBOARD HEATING PIPING FOR THE ENTIRE HOUSE. INSTALL NEW HOT WATER HEATER. INSTALL THREE NEW OUTDOORS HEAT PUMP SPLIT SYSTEM FOR HEATING AND AC AND NINE INDOOR UNITS
X00553386-S2
03/01/2024
Permit issued — Solar
X01011970-I1-SL
02/29/2024
Filed — Alteration
X01011970-I1
11/02/2022
Filed — Alteration CO
REMOVE EXISTING BOILER, HOT WATER AND BASEBOARD HEATING PIPING FOR THE ENTIRE HOUSE. INSTALL NEW HOT WATER HEATER. INSTALL THREE NEW OUTDOORS HEAT PUMP SPLIT SYSTEM FOR HEATING AND AC AND NINE INDOOR UNITS
X00553386-P2
10/04/2022
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
09/30/2022
Inspection — Fail-Final CND-Occupancy Inspection
Fail
View inspection ↗
09/27/2022
Objection raised — Admin
09/27/2022
Objection resolved — Addressed
09/27/2022
Objection resolved — Addressed
09/27/2022
Objection resolved — Addressed
09/27/2022
Special inspection requirement — Structural Stability – Alterations of existing buildings
ANGEL ROJAS
09/27/2022
Special inspection requirement — Fire-Resistant Penetrations and Joints
ANGEL ROJAS
09/27/2022
Special inspection requirement — Fire-Resistance Rated Construction
ANGEL ROJAS
09/27/2022
Special inspection requirement — Energy Code Compliance Inspections
ANGEL ROJAS
09/27/2022
Special inspection requirement — Fenestration and door U-factor and product ratings
ANGEL ROJAS
09/27/2022
Special inspection requirement — Permanent certificate
ANGEL ROJAS
09/27/2022
Special inspection requirement — Interior lighting power
ANGEL ROJAS
09/27/2022
Special inspection requirement — Fenestration air leakage
ANGEL ROJAS
09/27/2022
Special inspection requirement — Maintenance information
ANGEL ROJAS
09/27/2022
Special inspection requirement — Fenestration areas
ANGEL ROJAS
09/27/2022
Special inspection requirement — Air barrier - visual inspection
ANGEL ROJAS
09/14/2022
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
09/01/2022
Permit issued — General Construction
X00553386-I1-GC
09/01/2022
Objection raised — Admin
08/04/2022
Filed — Alteration CO
REMOVE EXISTING BOILER, HOT WATER AND BASEBOARD HEATING PIPING FOR THE ENTIRE HOUSE. INSTALL NEW HOT WATER HEATER. INSTALL THREE NEW OUTDOORS HEAT PUMP SPLIT SYSTEM FOR HEATING AND AC AND NINE INDOOR UNITS
X00553386-P1
08/04/2022
Objection raised — Admin
08/03/2022
Special inspection requirement — Fire-Resistant Penetrations and Joints
ANGEL ROJAS
08/03/2022
Special inspection requirement — Structural Stability – Alterations of existing buildings
ANGEL ROJAS
08/03/2022
Special inspection requirement — Energy Code Compliance Inspections
ANGEL ROJAS
08/03/2022
Special inspection requirement — Fire-Resistance Rated Construction
ANGEL ROJAS
08/03/2022
Special inspection requirement — Fenestration air leakage
ANGEL ROJAS
08/03/2022
Special inspection requirement — Permanent certificate
ANGEL ROJAS
08/03/2022
Special inspection requirement — Air barrier - visual inspection
ANGEL ROJAS
08/03/2022
Special inspection requirement — Fenestration and door U-factor and product ratings
ANGEL ROJAS
08/03/2022
Special inspection requirement — Maintenance information
ANGEL ROJAS
08/03/2022
Special inspection requirement — Interior lighting power
ANGEL ROJAS
08/03/2022
Special inspection requirement — Fenestration areas
ANGEL ROJAS
07/27/2022
Inspection — Fail-Final CND-Occupancy Inspection
Fail
View inspection ↗
07/11/2022
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
05/20/2022
Permit issued — General Construction
X00553386-I1-GC
05/19/2022
Permit issued — Construction Fence
X00552868-I1-FN
04/01/2022
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
03/03/2022
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
03/03/2022
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
03/03/2022
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
02/17/2022
Permit issued — General Construction
X00553386-I1-GC
02/17/2022
Violation issued (ECB, closed)
Construction
02/17/2022
Violation issued (ECB, closed)
Site Safety
02/17/2022
Violation issued (ECB, closed)
Construction
02/17/2022
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
02/17/2022
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
02/09/2022
Permit issued — Construction Fence
X00552868-I1-FN
02/09/2022
Permit issued — Structural
X00553386-S2-ST
11/22/2021
Permit issued — Plumbing
X00552842-I1-PL
11/02/2021
Permit issued — Structural
X00553386-S2-ST
10/29/2021
Violation issued (ECB, closed)
Construction
10/29/2021
Violation issued (ECB, closed)
Construction
Latest 60 of 86 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSolarSigned-offTRINITY SOLAR LLC03/01/2024
DOB NOWGeneral ConstructionPermit IssuedCOLONIAL MGMT ASSOCIATES09/01/2022
DOB NOWGeneral ConstructionPermit IssuedCOLONIAL MGMT ASSOCIATES05/20/2022
DOB NOWConstruction FenceSigned-offCOLONIAL MGMT ASSOCIATES05/19/2022
DOB NOWGeneral ConstructionPermit IssuedCOLONIAL MGMT ASSOCIATES02/17/2022
DOB NOWConstruction FenceSigned-offCOLONIAL MGMT ASSOCIATES02/09/2022
DOB NOWStructuralSigned-offCOLONIAL MGMT ASSOCIATES02/09/2022
DOB NOWPlumbingPermit IssuedROY B PLUMBING & HEATING11/22/2021
DOB NOWStructuralSigned-offCOLONIAL MGMT ASSOCIATES11/02/2021
DOB NOWGeneral ConstructionPermit IssuedCOLONIAL MGMT ASSOCIATES10/07/2021
DOB NOWConstruction FenceSigned-offCOLONIAL MGMT ASSOCIATES09/15/2021
1 project · most recent 11/02/2022
Air Conditioning Systems Heating Systems
FiledStatusContractorScopeMake / Model / Capacity
11/02/2022Permit IssuedCOLONIAL MGMT ASSOCIATESAir Conditioning Systems, Heating Systems
Cooling
Fujitsu AOU36RLXFZH 35,200 BTU · Heat Pump Outdoor ×4
AOU12RLXFZH 11,000 BTU · Heat Pump Outdoor ×2
AOU9RLXFZH 8,000 BTU · Heat Pump Outdoor ×2
Heating
Fujitsu AOU36RLXFZH 36,400 BTU · Heat Pump Outdoor ×4
AOU9RLXFZH 12,000 BTU · Heat Pump Outdoor ×4
Rinnai RU160L 150,000 BTU · Water Heater ×2
1 project · most recent 07/19/2021
Gas Water/Sanitary
FiledStatusContractorScope
07/19/2021Permit IssuedROY B PLUMBING & HEATINGGas, Water/Sanitary
3 projects · most recent 03/25/2024
General Wiring
FiledStatusContractorScope
03/25/2024CompleteREDLINE ELECTRIC INC—
02/16/2022CompleteWMS ELECTRICAL CONTNG LTDGeneral Wiring
11/02/2021CompleteWMS ELECTRICAL CONTNG LTD—
1 project · most recent 11/02/2022
Wood
FiledStatusContractorScope
11/02/2022Permit IssuedCOLONIAL MGMT ASSOCIATESWood
▾Field Inspections (DOB CAP) — 11
DateTypeResultReport
10/04/2022Pass-Final CND-Occupancy InspectionPassView ↗
09/30/2022Fail-Final CND-Occupancy InspectionFailView ↗
09/14/2022Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
07/27/2022Fail-Final CND-Occupancy InspectionFailView ↗
07/11/2022Pass-Final PL - Up to 3 Requested FloorsPassView ↗
04/01/2022Pass-Final PL - Up to 3 Requested FloorsPassView ↗
03/03/2022Certified Gas-Gas-Piping-RoughingCertifiedView ↗
03/03/2022Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
03/03/2022Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
02/17/2022Certified Gas-Gas-Piping-RoughingCertifiedView ↗
02/17/2022Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 26
DateRequirementInspectorRole
09/27/2022Structural Stability – Alterations of existing buildingsANGEL ROJASspecial
09/27/2022Fire-Resistant Penetrations and JointsANGEL ROJASspecial
09/27/2022Fire-Resistance Rated ConstructionANGEL ROJASprogress
09/27/2022Energy Code Compliance InspectionsANGEL ROJASprogress
09/27/2022Fenestration and door U-factor and product ratingsANGEL ROJASenergy_progress
09/27/2022Permanent certificateANGEL ROJASenergy_progress
09/27/2022Interior lighting powerANGEL ROJASenergy_progress
09/27/2022Fenestration air leakageANGEL ROJASenergy_progress
09/27/2022Maintenance informationANGEL ROJASenergy_progress
09/27/2022Fenestration areasANGEL ROJASenergy_progress
09/27/2022Air barrier - visual inspectionANGEL ROJASenergy_progress
08/03/2022Fire-Resistant Penetrations and JointsANGEL ROJASspecial
08/03/2022Structural Stability – Alterations of existing buildingsANGEL ROJASspecial
08/03/2022Energy Code Compliance InspectionsANGEL ROJASprogress
08/03/2022Fire-Resistance Rated ConstructionANGEL ROJASprogress
08/03/2022Fenestration air leakageANGEL ROJASenergy_progress
08/03/2022Permanent certificateANGEL ROJASenergy_progress
08/03/2022Air barrier - visual inspectionANGEL ROJASenergy_progress
08/03/2022Fenestration and door U-factor and product ratingsANGEL ROJASenergy_progress
08/03/2022Maintenance informationANGEL ROJASenergy_progress
08/03/2022Interior lighting powerANGEL ROJASenergy_progress
08/03/2022Fenestration areasANGEL ROJASenergy_progress
08/13/2021Structural Cold-Formed SteelANGEL ROJASspecial
08/13/2021Structural Stability – Alterations of existing buildingsANGEL ROJASspecial
08/13/2021FinalANGEL ROJASprogress
Latest 25 of 26.
▾Documents — 65 on file (BIS + DOB NOW)
▸Plans & Drawings9
▸DOB NOWPlans/Sketch9
08/23/2026X00553386-P2Request digital key ↗
08/23/2026X00553386-S2Request digital key ↗
08/23/2026X00553386-S1Request digital key ↗
Showing 3 of 9 on file for this type
▸Zoning, Tax Lot & Property Records2
▸DOB NOWZD1: DOB Zoning Diagram2
08/13/2026X00553386-P1Open ↗
08/13/2026X00553386-I1Open ↗
▸Seals & Professional Certifications35
▸DOB NOWProgress Inspector Seal & Signature19
09/01/2026X00553386-P1Open ↗
09/01/2026X00553386-P1Open ↗
09/01/2026X00553386-P1Open ↗
Showing 3 of 19 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature9
08/25/2026X00552868-I1Open ↗
08/25/2026X00552842-I1Open ↗
08/23/2026X00553386-P2Open ↗
Showing 3 of 9 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature7
09/01/2026X00553386-P1Open ↗
09/01/2026X00553386-P1Open ↗
09/01/2026X00553386-I1Open ↗
Showing 3 of 7 on file for this type
▸Trade Schedules & Equipment2
▸DOB NOWDEP: Sewer Certification (Sanitary/Storm)2
08/13/2026X00553386-P1Open ↗
08/13/2026X00553386-I1Open ↗
▸Safety & Tenant Protection3
▸DOB NOWStreet Tree Checklist2
08/15/2026X00553386-P1Open ↗
08/15/2026X00553386-I1Open ↗
▸DOB NOWParks Department Acknowledgment Letter for Street Trees Plan1
08/13/2026X00553386-I1Open ↗
▸Environmental & Asbestos8
▸DOB NOWDEP ACP-5: Asbestos Assessment Report8
08/23/2026X00553386-S2Open ↗
08/23/2026X00553386-P2Open ↗
08/23/2026X00553386-S1Open ↗
Showing 3 of 8 on file for this type
▸Approvals, Objections & Sign-offs1
▸DOB NOWUtility Company Final Acceptance Letter1
08/13/2026X01011970-I1Open ↗
▸Other Documents5
▸DOB NOWPlot Diagram2
08/13/2026X00553386-I1Open ↗
08/13/2026X00553386-P1Open ↗
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone2
08/13/2026X00553386-I1Open ↗
08/13/2026X00553386-P1Open ↗
▸DOB NOWSite Survey: Initial1
08/13/2026X00553386-P1Open ↗