← Back
BuildNYC
Three families
3221 OXFORD AVENUE
BRONX · BIN 2084092
💬 Discuss this project
1920Year Built
2Stories
C0Building Class
R5Zoning
2,280 sfGross Floor Area
3Units
Rent Stabilized0 Active Violations
Three families · 5,000 sf lot · 0.46 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralElectricalMechanicalPlumbingCivilGeneral
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Roof4p · 2 filings · 20 docs
Floor 212p · 2 filings · 20 docs
Floor 114p · 2 filings · 20 docs
Cellar10p · 2 filings · 20 docs
Site & exterior21p · 2 filings · 20 docs
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
08/25/2022$820K—Private party → Private party$360/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
CL Engineering1302/24/2024
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
H J Building Consulting2603/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Highlevel GroupGeneral Contractor303/21/2026
Splen ConstructionGeneral Contractor303/21/2026
Highlevel GroupScaffold303/21/2026
AMC Plumbing, Heating & CLNGPlumbing207/08/2026
Intelogic ElectricElectrical103/22/2026
Splen ConstructionScaffold107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
CL Engineering67811202/24/2024
Building Lifecycle
10/16/2024
Razor wire illegally installed at exposure# 2; 3 and 4 fencing at 3221 and 3223 oxford ave. Fc 506; 507.3 pitfalls., repair and/or replace
ECB violation · closed
08/21/2024
Signed off — Alteration
X07999270-S1
03/18/2024
Signed off — Alteration
X07999270-I1
03/13/2024
Inspection — Pass-Final General Construction Non-Directive 14
Pass
View inspection ↗
02/26/2024
Special inspection requirement — Fire-Resistance Rated Construction
CHRISTIAN LOZADA
67 history events on file for this building. Sign in free to see the full history. Sign in · Create account
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWConstruction FenceSigned-offHighlevel Group04/18/2023
DOB NOWEarth WorkSigned-offHighlevel Group03/13/2023
DOB NOWPlumbingSigned-offAMC Plumbing, Heating & CLNG02/07/2023
DOB NOWConstruction FenceSigned-offSplen Construction11/15/2022
DOB NOWPlumbingSigned-offAMC Plumbing, Heating & CLNG09/27/2022
DOB NOWGeneral ConstructionSigned-offSplen Construction09/23/2022
2 projects · most recent 12/14/2023
General Wiring
FiledStatusContractorScope
12/14/2023CompleteIntelogic ElectricGeneral Wiring
02/16/2023Permit IssuedHI-Rite ElectricGeneral Wiring
▾Field Inspections (DOB CAP) — 9
DateTypeResultReport
03/13/2024Pass-Final General Construction Non-Directive 14PassView ↗
01/30/2024Pass-Final General Construction Non-Directive 14PassView ↗
01/26/2024Pass-Final General Construction Non-Directive 14PassView ↗
12/06/2023Fail-Final General Construction Non-Directive 14FailView ↗
10/13/2023Pass-Final PL - Up to 3 Requested FloorsPassView ↗
10/10/2023Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
07/28/2023Certified Gas-Gas-Piping-RoughingCertifiedView ↗
07/28/2023Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
07/28/2023Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 73
DateRequirementInspectorRole
02/26/2024Fire-Resistant Penetrations and JointsCHRISTIAN LOZADAspecial
02/26/2024Mechanical SystemsCHRISTIAN LOZADAspecial
02/26/2024FinalCHRISTIAN LOZADAprogress
02/26/2024Energy Code Compliance InspectionsCHRISTIAN LOZADAprogress
02/26/2024Fire-Resistance Rated ConstructionCHRISTIAN LOZADAprogress
02/26/2024HVAC-R and service water heating system controlsCHRISTIAN LOZADAenergy_progress
02/26/2024Lighting in dwelling unitsCHRISTIAN LOZADAenergy_progress
02/26/2024Maintenance informationCHRISTIAN LOZADAenergy_progress
02/26/2024HVAC-R and service water piping design and insulationCHRISTIAN LOZADAenergy_progress
02/26/2024Lighting controlsCHRISTIAN LOZADAenergy_progress
02/26/2024Permanent certificateCHRISTIAN LOZADAenergy_progress
02/26/2024Interior lighting powerCHRISTIAN LOZADAenergy_progress
02/26/2024HVAC-R and service water heating equipmentCHRISTIAN LOZADAenergy_progress
02/24/2024Mechanical SystemsCHRISTIAN LOZADAspecial
02/24/2024HVAC-R and service water piping design and insulationCHRISTIAN LOZADAenergy_progress
02/24/2024Lighting controlsCHRISTIAN LOZADAenergy_progress
02/24/2024Interior lighting powerCHRISTIAN LOZADAenergy_progress
02/24/2024Permanent certificateCHRISTIAN LOZADAenergy_progress
02/24/2024HVAC-R and service water heating system controlsCHRISTIAN LOZADAenergy_progress
02/24/2024Lighting in dwelling unitsCHRISTIAN LOZADAenergy_progress
02/24/2024Maintenance informationCHRISTIAN LOZADAenergy_progress
02/24/2024HVAC-R and service water heating equipmentCHRISTIAN LOZADAenergy_progress
02/24/2024Fire-Resistance Rated ConstructionCHRISTIAN LOZADAprogress
02/24/2024FinalCHRISTIAN LOZADAprogress
02/24/2024Energy Code Compliance InspectionsCHRISTIAN LOZADAprogress
Latest 25 of 73.
118 filed documents on file for this building. Sign in free to see the full history. Sign in · Create account