← Back
Two family converted from one family
3223 ELY AVENUE
BRONX · BIN 2061601
💬 Discuss this project
1920Year Built
2Stories
B3Building Class
R5Zoning
—Gross Floor Area
2Units
2 Open Violations 1 unresolved · 1 paperwork only ▸FDNY Report ↗
Two family converted from one family · 0.51 FAR built · Flood zone X
Locations of Work
ArchitectureGeneral
Roof3p · 1 filing · 8 docs
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
UNISOLAR104/14/2025
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
CENTURION SOLAR ENERGYGeneral Contractor104/09/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
CENTURION SOLAR ENERGY LL9475104/14/2025
Building Lifecycle
All (10)Filed (1)Permit Issued (1)Signed Off (1)Violation (2)Special Inspection (5)
06/09/2026
Signed off — Alteration
SCOPE OF WORK IS SOLELY FOR THE INSTALLATION OF THE SOLAR ELECTRONICGENERATING SYSTEM. ALL OTHER WORK IS NOT TO BE RELIED UPON AS BEINGAPPROVED AND/OR PERMITTED BY THE NYC DEPARTMENT OF BUILDINGS.*NO CHANGE TO USE, EGRESS OR OCCUPANCY.*
X01209611-I1
04/21/2025
Permit issued — Solar
X01209611-I1-SL
04/14/2025
Filed — Alteration
SCOPE OF WORK IS SOLELY FOR THE INSTALLATION OF THE SOLAR ELECTRONICGENERATING SYSTEM. ALL OTHER WORK IS NOT TO BE RELIED UPON AS BEINGAPPROVED AND/OR PERMITTED BY THE NYC DEPARTMENT OF BUILDINGS.*NO CHANGE TO USE, EGRESS OR OCCUPANCY.*
X01209611-I1
04/11/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Andres Arias Londono
04/11/2025
Special inspection requirement — Structural Stability – Alterations of existing buildings
Andres Arias Londono
04/11/2025
Special inspection requirement — Energy Code Compliance Inspections
Andres Arias Londono
04/11/2025
Special inspection requirement — Final
Andres Arias Londono
04/11/2025
Special inspection requirement — Air barrier - visual inspection
Andres Arias Londono
09/21/2011
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
06/21/2011
Violation issued (ECB, open)
Construction
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSolarSigned-offCENTURION SOLAR ENERGY04/21/2025
BISPLISSUEDROY B PLUMBING & HEATING11/05/1999
BIS—ISSUEDJMA & ASSOC INC02/23/1999
1 project · most recent 06/27/2025
FiledStatusContractorScope
06/27/2025CompleteBERGER QUALITY ELEC'L CON—
1 project · most recent 04/14/2025
FiledStatusContractorScope
04/14/2025Signed-offCENTURION SOLAR ENERGY16 panels, 6.8 kw, 336.31 roof_area_sqft
▾Special Inspection Requirements (DOB NOW) — 5
DateRequirementInspectorRole
04/11/2025Fire-Resistant Penetrations and JointsAndres Arias Londonospecial
04/11/2025Structural Stability – Alterations of existing buildingsAndres Arias Londonospecial
04/11/2025Energy Code Compliance InspectionsAndres Arias Londonoprogress
04/11/2025FinalAndres Arias Londonoprogress
04/11/2025Air barrier - visual inspectionAndres Arias Londonoenergy_progress
▾Documents — 8 on file (BIS + DOB NOW)
▸Plans & Drawings1
▸DOB NOWPlans/Sketch1
08/19/2026X01209611-I1Request digital key ↗
▸Seals & Professional Certifications5
▸DOB NOWProgress Inspector Seal & Signature2
08/25/2026X01209611-I1Open ↗
08/25/2026X01209611-I1Open ↗
▸DOB NOWSpecial Inspector Seal & Signature2
08/25/2026X01209611-I1Open ↗
08/25/2026X01209611-I1Open ↗
▸DOB NOWDPL-1: Design Professional Seal & Signature1
08/13/2026X01209611-I1Open ↗
▸Environmental & Asbestos1
▸DOB NOWDEP ACP-5: Asbestos Assessment Report1
08/13/2026X01209611-I1Open ↗
▸Approvals, Objections & Sign-offs1
▸DOB NOWUtility Company Final Acceptance Letter1
08/19/2026X01209611-I1Open ↗