← Back
One story retail building
3223 YATES AVENUE
BRONX · Pelham Gardens · BIN 2056681
💬 Discuss this project
1968Year Built
1Stories
K1Building Class
C8-1Zoning
3,971 sfGross Floor Area
1Units
4 Open Violations ▸
One story retail building · Owner of record: 3236 BOSTON RD LLC · 6,800 sf lot · 0.58 FAR built · Flood zone X
Locations of Work
Electrical
Roof15p · 1 filing · 8 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
L AND L BOSTON REALTY LLC303/22/2026
L ADN L BOSTON REALTY LLC103/22/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
11/29/2023$2.8M—L&L BOSTON REALTY, LLC → 3236 BOSTON RD LLC$693/sf building
03/22/2016$2.0M—— → —$516/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
ETRECTE LLC202/03/2025
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
J B I CONSTRUCTION GROUP403/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
J.B.I. CONSTRUCTION GROUPGeneral Contractor303/21/2026
JSP ELECTL CNTNG CORPElectrical103/22/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
ETRECTE LLC8116202/03/2025
Building Lifecycle
All (23)Filed (2)Permit Issued (1)Signed Off (1)Violation (14)Special Inspection (5)
11/14/2025
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
11/14/2025
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
02/11/2025
Signed off — Alteration
INSTALLATION OF PV SYSTEM ON EXISTING ROOF TOP. NO CHANGES TO THE USE EGRESS OR OCCUPANCY.
X01092710-I1
02/07/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
VYACHESLAV NECHAYEV
02/07/2025
Special inspection requirement — Structural Stability – Alterations of existing buildings
VYACHESLAV NECHAYEV
02/07/2025
Special inspection requirement — Energy Code Compliance Inspections
VYACHESLAV NECHAYEV
02/07/2025
Special inspection requirement — Final
VYACHESLAV NECHAYEV
02/07/2025
Special inspection requirement — Air barrier - visual inspection
VYACHESLAV NECHAYEV
02/03/2025
Filed — Alteration
INSTALLATION OF PV SYSTEM ON EXISTING ROOF TOP. NO CHANGES TO THE USE EGRESS OR OCCUPANCY.
X01092710-P1
08/13/2024
Permit issued — Solar
X01092710-I1-SL
08/08/2024
Filed — Alteration
INSTALLATION OF PV SYSTEM ON EXISTING ROOF TOP. NO CHANGES TO THE USE EGRESS OR OCCUPANCY.
X01092710-I1
06/20/2023
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
06/20/2023
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
09/02/2020
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
06/02/2020
Violation issued (ECB, closed)
Boilers
05/21/2020
Violation issued (ECB, open)
Boilers
04/17/2019
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
12/31/2018
Violation issued (ECB, closed)
Boilers
12/31/2018
Violation issued (ECB, closed)
Boilers
05/15/2014
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
05/15/2014
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
01/19/2007
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
01/19/2007
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSolarSigned-offJ.B.I. CONSTRUCTION GROUP08/13/2024
BIS—ISSUEDNEW YORK SIGN CITY INC.01/09/2007
BISOTISSUEDNEW YORK SIGN CITY INC.01/09/2007
BISEQISSUEDNOVA PLUMBING & HEATING, INC.01/28/2005
BIS—ISSUEDNOVA PLUMBING & HEATING, INC.01/28/2005
BISPLISSUEDAVON PLBG & HTG INC01/28/2005
2 projects · most recent 11/18/2024
General Wiring
FiledStatusContractorScope
11/18/2024CompleteJSP ELECTL CNTNG CORP—
06/24/2020CompleteNOBLE ELECL CONTRG CO INCGeneral Wiring
▾Special Inspection Requirements (DOB NOW) — 5
DateRequirementInspectorRole
02/07/2025Fire-Resistant Penetrations and JointsVYACHESLAV NECHAYEVspecial
02/07/2025Structural Stability – Alterations of existing buildingsVYACHESLAV NECHAYEVspecial
02/07/2025Energy Code Compliance InspectionsVYACHESLAV NECHAYEVprogress
02/07/2025FinalVYACHESLAV NECHAYEVprogress
02/07/2025Air barrier - visual inspectionVYACHESLAV NECHAYEVenergy_progress
▾Documents — 8 on file (BIS + DOB NOW)
▸Plans & Drawings2
▸DOB NOWPlans/Sketch2
08/21/2026X01092710-I1Request digital key ↗
08/21/2026X01092710-P1Request digital key ↗
▸Seals & Professional Certifications5
▸DOB NOWDPL-1: Design Professional Seal & Signature2
08/13/2026X01092710-P1Open ↗
08/13/2026X01092710-I1Open ↗
▸DOB NOWProgress Inspector Seal & Signature2
08/26/2026X01092710-I1Open ↗
08/26/2026X01092710-I1Open ↗
▸DOB NOWSpecial Inspector Seal & Signature1
08/26/2026X01092710-I1Open ↗
▸Approvals, Objections & Sign-offs1
▸DOB NOWUtility Company Final Acceptance Letter1
08/13/2026X01092710-I1Open ↗