← Back
Elevator apt, semi-fireproof with stores
514 EAST 163 STREET
BRONX · Morrisania · BIN 2116646
💬 Discuss this project
2008Year Built
13Stories
D7Building Class
R8Zoning
129,164 sfGross Floor Area
101Units
LL97 CoveredRent Stabilized56 Open Violations 55 unresolved · 1 paperwork only ▸FISP: SAFE
Elevator apt, semi-fireproof with stores · Owner of record: BORICUA VILLAGE HOUSING DEVELOPMENT · 12,244 sf lot · 10.55 FAR built · Flood zone X
Locations of Work
ArchitecturePlumbingFire Protection
Permit Issued — active, not yet Signed-off
Floor 1Under Construction9p · 2 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
UNITED KING CONSTRUCTION707/08/2026
JASCO, INC703/22/2026
BORICUA VILLAGE HOUSING DEVELOPMENT103/22/2026
BORICUA VILLAGE HOUSING1303/22/2026
OWNER OF 3231 3RD AVE103/22/2026
H.P.D 80103/22/2026
KNICKERBOCKER CONST 2403/22/2026
KNICKERBOCKER CONST 11 LL303/22/2026
CITY OF NEW YORK103/21/2026
CITY103/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
ZELTA DESIGN406/05/2026
YOU GAO210/03/2025
GF55 PARTNERS106/24/2025
ENTHINK ENGINEERS LLC103/03/2020
BEST PROFESSIONALS NY CORP111/14/2019
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
INDESIGN STUDIO403/21/2026
EPAC BUILDING CONSULTING INC603/21/2026
JM ZONING, LLC.203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
UNITED KING CONSTRUCTIONGeneral Contractor707/08/2026
JASCO, INCGeneral Contractor603/21/2026
CENTAURI DEVELOPMENT INCGeneral Contractor204/09/2026
THOMAS F. CASH & SONS INCPlumbing207/08/2026
NEPTUNE SIGNS AWNINGSScaffold207/08/2026
BOLIVAR BUILDERS, LLCGeneral Contractor104/09/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
ZELTA INSPECT LLC7764306/05/2026
YOU GAO9407210/03/2025
ZHENG & ASSOCIATES LLC7330108/07/2025
MILROSE CONSULTANTS LLC2003106/24/2025
Building Lifecycle
All (136)Filed (9)Permit Issued (13)Signed Off (6)Facade (FISP) (14)Violation (60)Objection (4)Special Inspection (30)
07/29/2026
Signed off — Alteration
PROPOSED RENOVATION AT EXISTING COMMERCIAL SPACE FOR AN EATING & DRINKING ESTABLISHMENT AT THE FIRST FLOOR LEVEL. NO CHANGE IN USE, EGRESS AND OCCUPANCY.
X01240066-I1
07/27/2026
Violation issued (HPD, open)
A
07/27/2026
Violation issued (HPD, open)
A
07/27/2026
Violation issued (HPD, open)
B
07/27/2026
Violation issued (HPD, open)
C
07/27/2026
Violation issued (HPD, open)
B
07/27/2026
Violation issued (HPD, open)
B
07/27/2026
Violation issued (HPD, open)
A
07/27/2026
Violation issued (HPD, open)
A
07/27/2026
Violation issued (HPD, open)
B
07/27/2026
Violation issued (HPD, open)
C
07/27/2026
Violation issued (HPD, open)
C
07/27/2026
Violation issued (HPD, open)
B
07/27/2026
Violation issued (HPD, open)
B
07/27/2026
Violation issued (HPD, open)
A
06/08/2026
Special inspection requirement — Lighting controls
ERIK LIEPINS
06/08/2026
Special inspection requirement — HVAC-R and service water heating system controls
ERIK LIEPINS
06/08/2026
Special inspection requirement — Tenant Protection Plan Compliance
ERIK LIEPINS
06/08/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
ERIK LIEPINS
06/08/2026
Special inspection requirement — Mechanical Systems
ERIK LIEPINS
06/08/2026
Special inspection requirement — Final
ERIK LIEPINS
06/08/2026
Special inspection requirement — Energy Code Compliance Inspections
ERIK LIEPINS
06/08/2026
Special inspection requirement — Interior lighting power
ERIK LIEPINS
06/08/2026
Special inspection requirement — Duct leakage testing, insulation and design
ERIK LIEPINS
06/08/2026
Special inspection requirement — Exterior lighting power
ERIK LIEPINS
06/08/2026
Special inspection requirement — Shutoff dampers
ERIK LIEPINS
06/08/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
ERIK LIEPINS
06/08/2026
Special inspection requirement — Maintenance information
ERIK LIEPINS
06/08/2026
Special inspection requirement — HVAC-R and service water heating equipment
ERIK LIEPINS
06/08/2026
Special inspection requirement — Fenestration areas
ERIK LIEPINS
06/05/2026
Filed — Alteration
PROPOSED RENOVATION AT EXISTING COMMERCIAL SPACE FOR AN EATING & DRINKING ESTABLISHMENT AT THE FIRST FLOOR LEVEL. NO CHANGE IN USE, EGRESS AND OCCUPANCY.
X01240066-P1
06/04/2026
Special inspection requirement — Fenestration areas
ERIK LIEPINS
06/04/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
ERIK LIEPINS
06/04/2026
Special inspection requirement — Shutoff dampers
ERIK LIEPINS
06/04/2026
Special inspection requirement — Maintenance information
ERIK LIEPINS
06/04/2026
Special inspection requirement — Lighting controls
ERIK LIEPINS
06/04/2026
Special inspection requirement — HVAC-R and service water heating equipment
ERIK LIEPINS
06/04/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
ERIK LIEPINS
06/04/2026
Special inspection requirement — Mechanical Systems
ERIK LIEPINS
06/04/2026
Special inspection requirement — Tenant Protection Plan Compliance
06/04/2026
Special inspection requirement — Energy Code Compliance Inspections
ERIK LIEPINS
06/04/2026
Special inspection requirement — Final
ERIK LIEPINS
06/04/2026
Special inspection requirement — Duct leakage testing, insulation and design
ERIK LIEPINS
06/04/2026
Special inspection requirement — HVAC-R and service water heating system controls
ERIK LIEPINS
06/04/2026
Special inspection requirement — Exterior lighting power
ERIK LIEPINS
06/04/2026
Special inspection requirement — Interior lighting power
ERIK LIEPINS
05/06/2026
Violation issued (ECB, open)
Elevators
05/06/2026
Violation issued (ECB, open)
Elevators
04/03/2026
Violation issued (HPD, open)
B
04/03/2026
Violation issued (HPD, closed)
A
04/03/2026
Violation issued (HPD, open)
B
04/03/2026
Violation issued (HPD, open)
B
04/03/2026
Violation issued (HPD, open)
C
03/24/2026
Violation issued (HPD, open)
B
03/24/2026
Violation issued (HPD, open)
B
03/24/2026
Violation issued (HPD, open)
C
03/17/2026
Violation issued (HPD, open)
C
03/17/2026
Violation issued (HPD, open)
B
03/12/2026
Violation issued (HPD, open)
B
03/12/2026
Violation issued (HPD, closed)
C
Latest 60 of 136 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSignSigned-offDESTHERS, JOSEPH12/08/2025
DOB NOWSignSigned-offDESTHERS, JOSEPH12/08/2025
DOB NOWSprinklersPermit IssuedTHOMAS F. CASH & SONS INC10/06/2025
DOB NOWGeneral ConstructionSigned-offCENTAURI DEVELOPMENT INC09/05/2025
DOB NOWConstruction FenceSigned-offCENTAURI DEVELOPMENT INC09/04/2025
DOB NOWGeneral ConstructionPermit IssuedBOLIVAR BUILDERS, LLC08/15/2025
DOB NOWSidewalk ShedSigned-offUNITED KING CONSTRUCTION05/27/2022
DOB NOWSidewalk ShedSigned-offUNITED KING CONSTRUCTION11/03/2021
DOB NOWSidewalk ShedSigned-offUNITED KING CONSTRUCTION07/26/2021
DOB NOWSidewalk ShedSigned-offJASCO, INC03/09/2021
DOB NOWSidewalk ShedSigned-offUNITED KING CONSTRUCTION07/07/2020
DOB NOWSidewalk ShedSigned-offJASCO, INC03/04/2020
DOB NOWSidewalk ShedSigned-offUNITED KING CONSTRUCTION11/18/2019
BISOTISSUEDSASCO CONSTRUCTION ENTER04/21/2022
BISOTISSUEDGREY STONE RESTORATION08/20/2021
BISOTISSUEDGREY STONE RESTORATION03/19/2021
BISOTISSUEDGREY STONE RESTORATION12/11/2020
BISOTISSUEDGREY STONE RESTORATION03/12/2020
BIS—ISSUEDKNICKBOCKER CONSTRUCTION05/11/2015
BIS—ISSUEDKNICKBOCKER CONSTRUCTION10/17/2013
BIS—ISSUEDKNICKBOCKER CONSTRUCTION02/22/2013
BIS—ISSUEDKNICKERBOCKER CONST II LL04/10/2012
BISOTISSUEDKNICKERBOCKER CONSTRUCTION II,08/24/2011
BISPLISSUEDBLETSAS PLBNG & HTG CORP06/02/2011
BISPLISSUEDALPINE REFRIGERATION CO01/05/2011
BIS—ISSUEDA.M.A HOLDINGS INC12/15/2010
BIS—ISSUEDA.M.A HOLDINGS INC12/15/2010
BIS—ISSUEDA.M.A HOLDINGS INC12/15/2010
BIS—ISSUEDA.M.A HOLDINGS INC12/15/2010
BIS—ISSUEDA.M.A HOLDINGS INC12/15/2010
BIS—ISSUEDA.M.A HOLDINGS INC12/15/2010
BIS—ISSUEDA.M.A HOLDINGS INC12/15/2010
BIS—ISSUEDA.M.A HOLDINGS INC12/15/2010
BIS—ISSUEDKNICKERBOCKER CONST II LL08/12/2010
BISEQISSUEDDUANE READE - A NY PARTNE08/04/2010
BISMHISSUEDDUANE READE - A NY PARTNE08/04/2010
BISPLISSUEDBLETSAS PLBNG & HTG CORP06/29/2010
BISPLISSUEDBLETSAS PLBNG & HTG CORP03/19/2010
BISSDISSUEDBLETSAS PLBNG & HTG CORP03/19/2010
BIS—ISSUEDKNICKERBOCKER CONST II LL03/05/2010
+ 23 more permits on file
1 project · most recent 06/05/2026
Heating and Air Conditioning Systems
FiledStatusContractorScope
06/05/2026Signed-offCENTAURI DEVELOPMENT INCHeating and Air Conditioning Systems
1 project · most recent 06/05/2026
FiledStatusContractorScope
06/05/2026——45 heads
1 project · most recent 06/05/2026
Water/Sanitary
FiledStatusContractorScope
06/05/2026Permit IssuedTHOMAS F. CASH & SONS INCWater/Sanitary
1 project · most recent 11/14/2019
FiledStatusContractorScope
11/14/2019Permit IssuedRICHARD NEU—
1 project · most recent 06/05/2026
Fence
FiledStatusContractorScope
06/05/2026Permit IssuedTHOMAS F. CASH & SONS INCFence
2 projects · most recent 06/05/2026
Construction Fence Tenant Protection Plan 72 Hour
FiledStatusContractorScope
06/05/2026Permit IssuedTHOMAS F. CASH & SONS INCConstruction Fence
06/24/2025Permit IssuedBOLIVAR BUILDERS, LLCTenant Protection Plan 72 Hour
▾Special Inspection Requirements (DOB NOW) — 36
DateRequirementInspectorRole
06/08/2026Lighting controlsERIK LIEPINSenergy_progress
06/08/2026HVAC-R and service water heating system controlsERIK LIEPINSenergy_progress
06/08/2026Tenant Protection Plan ComplianceERIK LIEPINSspecial
06/08/2026Fire-Resistant Penetrations and JointsERIK LIEPINSspecial
06/08/2026Mechanical SystemsERIK LIEPINSspecial
06/08/2026FinalERIK LIEPINSprogress
06/08/2026Energy Code Compliance InspectionsERIK LIEPINSprogress
06/08/2026Interior lighting powerERIK LIEPINSenergy_progress
06/08/2026Duct leakage testing, insulation and designERIK LIEPINSenergy_progress
06/08/2026Exterior lighting powerERIK LIEPINSenergy_progress
06/08/2026Shutoff dampersERIK LIEPINSenergy_progress
06/08/2026HVAC-R and service water piping design and insulationERIK LIEPINSenergy_progress
06/08/2026Maintenance informationERIK LIEPINSenergy_progress
06/08/2026HVAC-R and service water heating equipmentERIK LIEPINSenergy_progress
06/08/2026Fenestration areasERIK LIEPINSenergy_progress
06/04/2026Fenestration areasERIK LIEPINSenergy_progress
06/04/2026HVAC-R and service water piping design and insulationERIK LIEPINSenergy_progress
06/04/2026Shutoff dampersERIK LIEPINSenergy_progress
06/04/2026Maintenance informationERIK LIEPINSenergy_progress
06/04/2026Lighting controlsERIK LIEPINSenergy_progress
06/04/2026HVAC-R and service water heating equipmentERIK LIEPINSenergy_progress
06/04/2026Fire-Resistant Penetrations and JointsERIK LIEPINSspecial
06/04/2026Mechanical SystemsERIK LIEPINSspecial
06/04/2026Tenant Protection Plan Compliance—special
06/04/2026Energy Code Compliance InspectionsERIK LIEPINSprogress
Latest 25 of 36.
▾Documents — 594 on file (BIS + DOB NOW)
▸Plans & Drawings8
▸DOB NOWPlans/Sketch6
08/18/2026X01240066-I1Request digital key ↗
08/18/2026X01240066-S2Request digital key ↗
08/18/2026X01240066-P1Request digital key ↗
Showing 3 of 6 on file for this type
▸DOB NOWPlans/Sketch - Sidewalk Shed2
08/26/2026X00323510-I1Request digital key ↗
08/15/2026X00264973-I1Request digital key ↗
▸Applications & Permits132
▸BISWORK PERMIT APPLICATION67
04/21/2022240269080Open ↗
03/11/2020240269080Open ↗
05/18/2015210003814Open ↗
Showing 3 of 67 on file for this type
▸BISPLAN / WORK APPROVAL APPLICATION50
03/11/2020240269080Open ↗
03/12/2015220028280Open ↗
08/06/2013210013260Open ↗
Showing 3 of 50 on file for this type
▸BISNon-Directive 14 Construction Sign Off Including Sign Applications12
11/04/2013210012662Open ↗
10/04/2013210011208Open ↗
10/04/2013210011217Open ↗
Showing 3 of 12 on file for this type
▸BISBPP-5 - Authorization to the Department of Transportation1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISCERTIFICATE OF OCCUPANCY: APPLICATION1
02/24/2012210003814Open ↗
▸BISACCEPTABLE FOR ENDORSED SD1, SD2 PRIORTO PERMIT PER RECON-8/17/2007.1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Zoning, Tax Lot & Property Records9
▸BISEASEMENT AND RESTRICTIVE DECLARATIONS - SUPPPORTING DOCUMENTATION4
07/13/2015210003814Open ↗
07/13/2015210003814Open ↗
03/16/2015210003814Open ↗
Showing 3 of 4 on file for this type
▸BISTAX LOT: TENTATIVE LOT NUMBER ISSUED2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISZONING EXHIBIT II: CERTIFICATION1
07/13/2015210003814Open ↗
▸BISZONING EXHIBIT III:DESC. & OWNRSHP.STMNT1
03/16/2015210003814Open ↗
▸BISADDRESS: NEW HOUSE NUMBER APPROVED1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Seals & Professional Certifications118
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION59
03/31/2015220028280Open ↗
03/12/2015220028280Open ↗
10/28/2013210012653Open ↗
Showing 3 of 59 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST14
03/12/2015220028280Open ↗
Showing 1 of 14 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM13
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 13 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature8
08/26/2026X00264973-I1Open ↗
08/18/2026X01240066-P1Open ↗
08/18/2026X01291326-I1Open ↗
Showing 3 of 8 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature7
09/23/2026X01240066-I1Open ↗
09/23/2026X01240066-I1Open ↗
08/28/2026X01240066-P1Open ↗
Showing 3 of 7 on file for this type
▸DOB NOWProgress Inspector Seal & Signature6
09/23/2026X01240066-I1Open ↗
09/23/2026X01240066-I1Open ↗
08/28/2026X01240066-P1Open ↗
Showing 3 of 6 on file for this type
▸BISPC FULL REPORT4
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 4 on file for this type
▸BISTECHNICAL REPORT: STATEMENT OF RESPONSIBILITY4
03/11/2020240269080Open ↗
Showing 1 of 4 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT2
03/11/2020240269080Open ↗
03/12/2015220028280Open ↗
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION1
03/11/2020240269080Open ↗
▸Trade Schedules & Equipment58
▸BISPLUMBING - SUPPORTING DOCUMENTATION19
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 19 on file for this type
▸BISEQUIPMENT USE PERMITS9
01/08/2014210003814Open ↗
08/10/2013220067834Open ↗
08/10/2013220067834Open ↗
Showing 3 of 9 on file for this type
▸BISSELF-CERT PLUMBING NOTICE8
06/14/2011210022170Open ↗
01/25/2011220067834Open ↗
01/14/2011220067834Open ↗
Showing 3 of 8 on file for this type
▸BISSCHEDULE B - PLUMBING7
05/26/2011210022170Open ↗
Showing 1 of 7 on file for this type
▸BISFA - FDNY APPROVAL : FD-FAA4
08/24/2012220008621Open ↗
12/09/2011220012206Open ↗
12/09/2011220012206Open ↗
Showing 3 of 4 on file for this type
▸BISSCHEDULE C - HEATING & COMBUSTION EQUIPMENT4
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 4 on file for this type
▸BISEQUIPMENT USE APPLICATION/PERMIT3
01/08/2014210003814Open ↗
08/10/2013220067834Open ↗
08/10/2013220067834Open ↗
▸BISBOILERS - SUPPORTING DOCUMENTATION2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISSEWER/HOUSE CON SIGNOFF: DEP HC 0212
08/13/2011210022170Open ↗
Showing 1 of 2 on file for this type
▸Safety & Tenant Protection6
▸BISEXCAVATION OR DEMOLITION: 5-DAY NOTICE2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸DOB NOWTenant Protection Plan2
08/13/2026X00264973-I1Open ↗
08/13/2026X00323510-I1Open ↗
▸BISTENANT PROTECTION PLAN AND NOTES1
03/11/2020240269080Open ↗
▸BISSTREET TREE CHECKLIST1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Environmental & Asbestos41
▸BISASBESTOS EXEMPTION CERTIFICATION LETTER28
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 28 on file for this type
▸DOB NOWOER: Notice to Proceed6
08/18/2026X01240066-I1Open ↗
08/13/2026X01240066-I1Open ↗
08/13/2026X01240066-S1Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWDEP ACP-5: Asbestos Assessment Report3
08/18/2026X01240066-P1Open ↗
08/13/2026X01240066-S1Open ↗
08/13/2026X01240066-I1Open ↗
▸DOB NOWOER: Notice of Satisfaction3
08/18/2026X01240066-I1Open ↗
08/13/2026X01240066-I1Open ↗
08/13/2026X01240066-S1Open ↗
▸BISENVIRONMENTAL RESTRICTIONS - OER NOTICE TO PROCEED1
03/11/2020240269080Open ↗
▸Energy Compliance2
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY1
03/11/2020240269080Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY FOR ENERGY CODE PROGRESS INSPECTIONS1
03/11/2020240269080Open ↗
▸Inspections & Test Reports3
▸BISCONCRETE DESIGN MIX (TR-3) 27-6051
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY1
03/11/2020240269080Open ↗
▸BISBORINGS / TEST PITS (TR-4) 27-7201
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Approvals, Objections & Sign-offs133
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST56
07/13/2015210003814Open ↗
07/13/2015210003814Open ↗
07/13/2015210003814Open ↗
Showing 3 of 56 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION36
07/13/2015210003814Open ↗
07/13/2015210003814Open ↗
07/13/2015210003814Open ↗
Showing 3 of 36 on file for this type
▸BISADMINISTRATIVE OBJECTIONS31
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 31 on file for this type
▸BISSCHEDULE A - OCCUPANCY / USE7
06/14/2012210003814Open ↗
12/01/2010210003814Open ↗
Showing 2 of 7 on file for this type
▸BISTAP LETTER - DOM SVC : DEP-DOM2
08/13/2011210022170Open ↗
08/13/2011210022170Open ↗
▸BISMaster Plumber Seal Temporary Approval Letter1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Cost, Insurance & Ownership39
▸BISCOST AFFIDAVIT37
03/11/2020240269080Open ↗
06/13/2013220067834Open ↗
03/08/2012220058666Open ↗
Showing 3 of 37 on file for this type
▸BISPROJECT-SPECIFIC GL INSURANCE1
10/18/2013210003814Open ↗
▸BISLL58/88-CIVIL PENALTY AFFIDAVIT1
08/01/2011210009774Open ↗
▸Filing & Intake Forms31
▸BISEFILING COVER SHEET17
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 17 on file for this type
▸BISADDITIONAL INFORMATION13
03/31/2015210003814Open ↗
04/15/2014210013260Open ↗
10/04/2013210011208Open ↗
Showing 3 of 13 on file for this type
▸BISEFILING JOB APPLICATION COVER SHEET1
03/11/2020240269080Open ↗
▸Other Documents9
▸BISPlot Diagram2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISCONSTRUCTION - SUPPORTING DOCUMENTATION1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISENVRONMENTAL IMPACT STUDY1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISHPD DEFERRED FEE PAYMENT REQUEST1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISMELROSE COMMONS URBAN RENEWAL PROJECTFIRST AMENDED PLAN DATED DECEMBER 20061
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISCPC AMENDMENT TO LAND USE CHANGES1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISENVIRONMENTAL(E) DEP NOTICE TO PROCEED1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISAPPLICANT'S ALLOWABLE HEIGHT AND LANDUSE SUMMARY1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type