3227 FAR ROCKAWAY BOULEVARD
BIN 4625796
💬 Discuss this project
—Year Built
—Stories
—Building Class
—Zoning
—Gross Floor Area
—Units
3 Active Violations ▸FDNY Report ↗
Locations of Work
ArchitectureStructuralMechanicalPlumbingFire ProtectionEquipmentLandscapeGeneralOther
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Permit Issued — active, not yet Signed-off
Whole building & multi-floor projectsTemporary pipe scaffold installationUnder Construction1 filing
Roof3229 Fb LLCUnder Construction10p · 2 filings · 20 docs
Bulkhead3229 Fb LLCUnder Construction5p · 1 filing · 20 docs
Floor 73229 Fb LLCUnder Construction6p · 1 filing · 20 docs
Floor 63229 Fb LLCUnder Construction7p · 1 filing · 20 docs
Floor 53229 Fb LLCUnder Construction4p · 1 filing · 20 docs
Floor 43229 Fb LLCUnder Construction6p · 1 filing · 20 docs
Floor 33229 Fb LLCUnder Construction5p · 1 filing · 20 docs
Floor 23229 Fb LLCUnder Construction9p · 1 filing · 20 docs
Floor 13229 Fb LLCUnder Construction15p · 1 filing · 20 docs
Site & exterior3229 Fb LLCUnder Construction3 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
Walton Developers1608/28/2026
Bluesky Builders103/22/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Soni Engineering Consulting610/08/2026
Kao Hwa Lee208/26/2026
Structural Engineering Technologies304/21/2026
Vasilios Artemiou PE302/26/2026
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Advanced Builders Services603/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Innovative Construction NYCGeneral Contractor608/27/2026
Core Scaffold SystemsScaffold409/23/2026
Prime Piping & HeatingFire Protection206/28/2026
Prime Piping & HeatingPlumbing106/28/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
HRF Services5616808/26/2026
Building Lifecycle
All (77)Filed (14)Permit Issued (13)Violation (5)Inspection (4)Objection (8)Special Inspection (30)Tax Incentive (3)
01/01/2027
485-x construction completed
10/08/2026
Filed — Alteration
INSTALLATION OF TEMPORARY PIPE SCAFFOLD AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
Q01423748-P2
10/01/2026
Objection raised — Other
09/22/2026
Permit issued — Sidewalk Shed
Q01423739-I1-SH
09/14/2026
Inspection — Certified Storm Drainage-ST-Piping-Underground
Certified
View inspection ↗
09/14/2026
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
09/03/2026
Violation issued (ECB, closed)
Construction
08/26/2026
Filed — New Building
Mechanical work type hereby filed subsequent to the NB GC Application: Q01297222-I1.
Q01297222-P2
08/26/2026
Permit issued — General Construction
Q01297222-I1-GC
08/24/2026
Filed — Alteration
INSTALLATION OF TEMPORARY SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
Q01423739-P1
08/24/2026
Violation issued (ECB, open)
Unknown
08/24/2026
Violation issued (ECB, open)
Construction
08/15/2026
Violation issued (ECB, closed)
Construction
08/15/2026
Violation issued (ECB, open)
Unknown
08/10/2026
Special inspection requirement — Fenestration areas
SHAHRIAR QUAYYUM
08/10/2026
Special inspection requirement — Lighting controls
SHAHRIAR QUAYYUM
08/10/2026
Special inspection requirement — Maintenance information
SHAHRIAR QUAYYUM
08/10/2026
Special inspection requirement — Lighting in dwelling units
SHAHRIAR QUAYYUM
08/10/2026
Special inspection requirement — Metering
SHAHRIAR QUAYYUM
08/10/2026
Special inspection requirement — Fenestration and door U-factor and product ratings
SHAHRIAR QUAYYUM
08/10/2026
Special inspection requirement — Interior lighting power
SHAHRIAR QUAYYUM
08/10/2026
Special inspection requirement — Insulation placement and R values
SHAHRIAR QUAYYUM
08/10/2026
Special inspection requirement — Fenestration air leakage
SHAHRIAR QUAYYUM
08/10/2026
Special inspection requirement — Exterior lighting power
SHAHRIAR QUAYYUM
08/10/2026
Special inspection requirement — Electrical motors and elevators
SHAHRIAR QUAYYUM
08/10/2026
Special inspection requirement — Exterior Insulation and Finish Systems (EIFS)
SHAHRIAR QUAYYUM
08/10/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
SHAHRIAR QUAYYUM
08/10/2026
Special inspection requirement — Energy Code Compliance Inspections
SHAHRIAR QUAYYUM
08/10/2026
Special inspection requirement — Fire-Resistance Rated Construction
SHAHRIAR QUAYYUM
08/10/2026
Special inspection requirement — Lowest Floor Elevation
SHAHRIAR QUAYYUM
08/10/2026
Special inspection requirement — Air barrier - visual inspection
SHAHRIAR QUAYYUM
08/10/2026
Special inspection requirement — Air barrier continuity plan testing
SHAHRIAR QUAYYUM
08/06/2026
Filed — Alteration
INSTALLATION OF TEMPORARY PIPE SCAFFOLD AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
Q01423748-P1
07/29/2026
Inspection — Certified Storm Drainage-ST-Piping-Underground
Certified
View inspection ↗
07/29/2026
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
07/21/2026
485-x registration filed
07/07/2026
Permit issued — Foundation
Q01297222-S2-FO-EA
07/07/2026
485-x construction commenced
07/01/2026
Filed — Alteration
INSTALLATION OF TEMPORARY SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
Q01423739-I1
07/01/2026
Permit issued — Sidewalk Shed
Q01423739-I1-SH
07/01/2026
Permit issued — General Construction
Q01297222-I1-GC
06/30/2026
Filed — Alteration
INSTALLATION OF TEMPORARY OVERHEAD PROTECTION AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
Q01423756-I1
06/30/2026
Filed — Alteration
INSTALLATION OF TEMPORARY PIPE SCAFFOLD AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
Q01423748-I1
06/30/2026
Permit issued — Protection and Mechanical Methods
Q01423756-I1-PMM
06/30/2026
Permit issued — Support of Excavation
Q01297222-S6-SE
06/30/2026
Permit issued — Supported Scaffold
Q01423748-I1-SF
06/29/2026
Permit issued — Structural
Q01297222-S1-ST
06/18/2026
Permit issued — Mechanical Systems
Q01297222-S3-MS
06/05/2026
Permit issued — Standpipe
Q01297222-S5-EW-SD
06/05/2026
Permit issued — Standpipe
Q01297222-S5-EW-SP
06/04/2026
Permit issued — Plumbing
Q01297222-S4-PL
05/19/2026
Special inspection requirement — Private On-Site Storm Water Disposal Systems-, and Detention Facilities, Installation
SHAHRIAR QUAYYUM
05/18/2026
Special inspection requirement — Concrete - Cast-In-Place
SHAHRIAR QUAYYUM
05/18/2026
Special inspection requirement — Excavations - Sheeting, Shoring, and Bracing
SHAHRIAR QUAYYUM
05/14/2026
Special inspection requirement — Concrete - Cast-In-Place
SHAHRIAR QUAYYUM
04/27/2026
Objection raised — Admin
04/21/2026
Filed — New Building
Mechanical work type hereby filed subsequent to the NB GC Application: Q01297222-I1.
Q01297222-S6
04/20/2026
Objection resolved — Addressed
04/20/2026
Special inspection requirement — Subsurface Conditions – Fill Placement & In-Place Density
SHAHRIAR QUAYYUM
04/20/2026
Special inspection requirement — Subsurface Investigations (Borings/Test Pits)
FERAS AYOUB
Latest 60 of 77 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSidewalk ShedPermit IssuedCore Scaffold Systems09/22/2026
DOB NOWGeneral ConstructionPermit IssuedInnovative Construction NYC08/26/2026
DOB NOWFoundationPermit IssuedInnovative Construction NYC07/07/2026
DOB NOWSidewalk ShedPermit IssuedCore Scaffold Systems07/01/2026
DOB NOWGeneral ConstructionPermit IssuedInnovative Construction NYC07/01/2026
DOB NOWProtection and Mechanical MethodsPermit IssuedCore Scaffold Systems06/30/2026
DOB NOWSupport of ExcavationPermit IssuedInnovative Construction NYC06/30/2026
DOB NOWSupported ScaffoldPermit IssuedCore Scaffold Systems06/30/2026
DOB NOWStructuralPermit IssuedInnovative Construction NYC06/29/2026
DOB NOWMechanical SystemsPermit IssuedInnovative Construction NYC06/18/2026
DOB NOWStandpipePermit IssuedPrime Piping & Heating06/05/2026
DOB NOWSprinklersPermit IssuedPrime Piping & Heating06/05/2026
DOB NOWPlumbingPermit IssuedPrime Piping & Heating06/04/2026
1 project · most recent 08/26/2026
Heating and Air Conditioning Systems Ventilation Systems
FiledStatusContractorScopeMake / Model / Capacity
08/26/2026Permit IssuedInnovative Construction NYCHeating and Air Conditioning Systems, Ventilation Systems
Heat / Cool
Daikin RZQ24TBVJU 24,000 BTU · Heat Pump Outdoor ×1
Ventilation
Greenheck ERV-10-20L-VG 450 CFM · Erv ×1
1 project · most recent 08/26/2026
Storm Water/Sanitary
FiledStatusContractorScope
08/26/2026Permit IssuedPrime Piping & HeatingStorm, Water/Sanitary
6 projects · most recent 06/25/2026
General Wiring
FiledStatusContractorScope
06/25/2026Permit IssuedSolas Electrical—
06/02/2026Permit IssuedIntelogic Electric—
12/17/2025Permit IssuedM.R. Electrical ServiceGeneral Wiring
12/11/2025Permit IssuedFirst Quality ElectricalGeneral Wiring
12/11/2025Permit IssuedFirst Quality Electrical1 meters, 1 new_meters
11/20/2025Permit IssuedHivolts ElectricalGeneral Wiring
1 project · most recent 08/26/2026
Concrete
FiledStatusContractorScope
08/26/2026Permit IssuedInnovative Construction NYCConcrete
2 projects · most recent 10/08/2026
Scaffold Sidewalk Shed
FiledStatusContractorScope
10/08/2026Permit IssuedCore Scaffold SystemsScaffold
08/24/2026Permit IssuedCore Scaffold SystemsSidewalk Shed
▾Field Inspections (DOB CAP) — 4
DateTypeResultReport
09/14/2026Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
09/14/2026Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
07/29/2026Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
07/29/2026Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 59
DateRequirementInspectorRole
08/10/2026Fenestration areasSHAHRIAR QUAYYUMenergy_progress
08/10/2026Lighting controlsSHAHRIAR QUAYYUMenergy_progress
08/10/2026Maintenance informationSHAHRIAR QUAYYUMenergy_progress
08/10/2026Lighting in dwelling unitsSHAHRIAR QUAYYUMenergy_progress
08/10/2026MeteringSHAHRIAR QUAYYUMenergy_progress
08/10/2026Fenestration and door U-factor and product ratingsSHAHRIAR QUAYYUMenergy_progress
08/10/2026Interior lighting powerSHAHRIAR QUAYYUMenergy_progress
08/10/2026Insulation placement and R valuesSHAHRIAR QUAYYUMenergy_progress
08/10/2026Fenestration air leakageSHAHRIAR QUAYYUMenergy_progress
08/10/2026Exterior lighting powerSHAHRIAR QUAYYUMenergy_progress
08/10/2026Electrical motors and elevatorsSHAHRIAR QUAYYUMenergy_progress
08/10/2026Exterior Insulation and Finish Systems (EIFS)SHAHRIAR QUAYYUMspecial
08/10/2026Fire-Resistant Penetrations and JointsSHAHRIAR QUAYYUMspecial
08/10/2026Energy Code Compliance InspectionsSHAHRIAR QUAYYUMprogress
08/10/2026Fire-Resistance Rated ConstructionSHAHRIAR QUAYYUMprogress
08/10/2026Lowest Floor ElevationSHAHRIAR QUAYYUMprogress
08/10/2026Air barrier - visual inspectionSHAHRIAR QUAYYUMenergy_progress
08/10/2026Air barrier continuity plan testingSHAHRIAR QUAYYUMenergy_progress
05/19/2026Private On-Site Storm Water Disposal Systems-, and Detention Facilities, InstallationSHAHRIAR QUAYYUMspecial
05/18/2026Concrete - Cast-In-PlaceSHAHRIAR QUAYYUMspecial
05/18/2026Excavations - Sheeting, Shoring, and BracingSHAHRIAR QUAYYUMspecial
05/14/2026Concrete - Cast-In-PlaceSHAHRIAR QUAYYUMspecial
04/20/2026Subsurface Conditions – Fill Placement & In-Place DensitySHAHRIAR QUAYYUMspecial
04/20/2026Subsurface Investigations (Borings/Test Pits)FERAS AYOUBspecial
04/20/2026Subgrade InspectionsSHAHRIAR QUAYYUMspecial
Latest 25 of 59.
▾Documents — 70 on file (BIS + DOB NOW)
▸Plans & Drawings9
▸DOB NOWPlans/Sketch9
08/17/2026Q01297222-S4Request digital key ↗
08/17/2026Q01297222-S3Request digital key ↗
08/17/2026Q01297222-S2Request digital key ↗
Showing 3 of 9 on file for this type
▸Zoning, Tax Lot & Property Records13
▸DOB NOWRestrictive Declaration/Easement 17
08/17/2026Q01297222-S4Open ↗
08/17/2026Q01297222-S3Open ↗
08/17/2026Q01297222-S2Open ↗
Showing 3 of 7 on file for this type
▸DOB NOWZD1: DOB Zoning Diagram3
08/17/2026Q01297222-I1Open ↗
08/17/2026Q01297222-P2Open ↗
08/13/2026Q01297222-I1Open ↗
▸DOB NOWZoning Exhibit form (1-5)2
08/17/2026Q01297222-P2Open ↗
08/13/2026Q01297222-I1Open ↗
▸DOB NOWHouse Number Verification: TOPO Stamp1
08/13/2026Q01297222-I1Open ↗
▸Seals & Professional Certifications29
▸DOB NOWSpecial Inspector Seal & Signature12
09/23/2026Q01297222-P2Open ↗
09/23/2026Q01297222-P2Open ↗
09/01/2026Q01297222-S6Open ↗
Showing 3 of 12 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature9
08/17/2026Q01297222-S3Open ↗
08/17/2026Q01297222-S2Open ↗
08/17/2026Q01297222-S1Open ↗
Showing 3 of 9 on file for this type
▸DOB NOWProgress Inspector Seal & Signature8
09/23/2026Q01297222-P2Open ↗
09/23/2026Q01297222-P2Open ↗
08/26/2026Q01297222-S1Open ↗
Showing 3 of 8 on file for this type
▸Trade Schedules & Equipment1
▸DOB NOWDEP: Sewer Certification (Sanitary/Storm)1
08/17/2026Q01297222-I1Open ↗
▸Safety & Tenant Protection3
▸DOB NOWStreet Tree Checklist2
08/17/2026Q01297222-I1Open ↗
08/17/2026Q01297222-P2Open ↗
▸DOB NOWParks Department Acknowledgment Letter for Street Trees Plan1
08/13/2026Q01297222-I1Open ↗
▸Inspections & Test Reports4
▸DOB NOWTR4 Test Report and Plot Diagram2
08/17/2026Q01297222-S2Open ↗
08/17/2026Q01297222-S6Open ↗
▸DOB NOWSOIL REPORT2
08/17/2026Q01297222-S6Open ↗
08/13/2026Q01297222-S2Open ↗
▸Other Documents11
▸DOB NOWFlood Plan Emergency Temporary Flood Shields3
08/17/2026Q01297222-I1Open ↗
08/17/2026Q01297222-P2Open ↗
08/15/2026Q01297222-I1Open ↗
▸DOB NOWSite Survey: Initial2
08/17/2026Q01297222-P2Open ↗
08/13/2026Q01297222-I1Open ↗
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone2
08/17/2026Q01297222-P2Open ↗
08/13/2026Q01297222-I1Open ↗
▸DOB NOWAdjoining Owners Notification2
08/17/2026Q01297222-S2Open ↗
08/17/2026Q01297222-S6Open ↗
▸DOB NOWProperty Ownership Certification2
08/17/2026Q01297222-I1Open ↗
08/17/2026Q01297222-P2Open ↗