Five to six families
323 49 STREET
BROOKLYN · Sunset Park (West) · BIN 3012566
💬 Discuss this project
1910Year Built
4Stories
C2Building Class
R6BZoning
3,994 sfGross Floor Area
6Units
12 Open Violations ▸FDNY Report ↗
Five to six families · Owner of record: GOLDSMITH ST PARTNERS LLC · 2,003 sf lot · 1.99 FAR built · Flood zone X
Locations of Work
ArchitectureMechanicalFire Protection
Roof3p · 1 filing · 8 docs
Floor 41p · 1 filing · 20 docs
Floor 31p · 1 filing · 8 docs
Floor 21p · 1 filing · 8 docs
Floor 12p · 1 filing · 8 docs
Cellar1p · 1 filing · 8 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
GOLDSMITH ST PARTNERS LLC103/22/2026
SD DESIGN STUDIO203/21/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
10/30/2020$850K—— → —$213/sf building
11/13/2014$580K—Private party → 323 LUO'S PROPERTY LLC$145/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
JIMENEZ BUILDING CONSULTING LLC306/10/2022
HPL ENGINEERING P.C.705/26/2022
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
H Z BUILDING NY803/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
WINWAY DEVELOPMENT LLCGeneral Contractor303/21/2026
H&Z BUILDING CONSULTING IGeneral Contractor207/08/2026
CATMAN PLUMBING INCPlumbing207/08/2026
CASE PLUMBING LLCFire Protection107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
HPL ENGINEERING PC5613405/26/2022
M. INT'L ENGINEERING PLLC3129201/13/2022
Building Lifecycle
All (70)Filed (10)Permit Issued (6)Signed Off (5)Violation (18)Inspection (4)Special Inspection (27)
07/07/2026
Violation issued (HPD, open)
I
07/05/2026
Violation issued (HPD, open)
A
07/05/2026
Violation issued (HPD, open)
A
07/05/2026
Violation issued (HPD, open)
A
07/05/2026
Violation issued (HPD, open)
A
07/05/2026
Violation issued (HPD, open)
C
07/05/2026
Violation issued (HPD, open)
B
07/05/2026
Violation issued (HPD, open)
B
07/05/2026
Violation issued (HPD, open)
C
07/05/2026
Violation issued (HPD, open)
A
07/05/2026
Violation issued (HPD, open)
B
06/30/2022
Signed off — Alteration
SUBMIT BOILER WORK TYPE IN CONJUNCTION WITH ALT-1 APPLICATION #321593637.
B00705199-S1
06/30/2022
Signed off — Alteration
SUBMIT BOILER WORK TYPE IN CONJUNCTION WITH ALT-1 APPLICATION #321593637.
B00705199-I1
06/22/2022
Signed off — Alteration
SUBMIT SPRINKLER WORK IN CONJUNCTION WITH DOB ALT1 APPLICATION #321593637.
B00637767-I1
06/14/2022
Signed off — Alteration
PROPOSED INSTALLATION OF HEAVY DUTY SIDEWALK SHED AS PER PLANS. LIVE LOAD 300 LBS PER SQUARE FEET. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE. NO CHANGE IN USE, OCCUPANCY, BULK, OR EGRESS
B00436946-I1
06/13/2022
Special inspection requirement — Final
Jian Yang
06/10/2022
Filed — Alteration
PROPOSED INSTALLATION OF HEAVY DUTY SIDEWALK SHED AS PER PLANS. LIVE LOAD 300 LBS PER SQUARE FEET. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE. NO CHANGE IN USE, OCCUPANCY, BULK, OR EGRESS
B00436946-P2
06/01/2022
Inspection — Pass-Final Boiler Equipment Inspection
Pass
View inspection ↗
05/31/2022
Permit issued — Boiler Equipment
B00705199-S1-BE
05/26/2022
Filed — Alteration
SUBMIT BOILER WORK TYPE IN CONJUNCTION WITH ALT-1 APPLICATION #321593637.
B00705199-S1
05/19/2022
Special inspection requirement — Fire-Resistant Penetrations and Joints
Fran Huang
05/19/2022
Special inspection requirement — Maintenance information
Fran Huang
05/19/2022
Special inspection requirement — Heating Systems
Fran Huang
05/19/2022
Special inspection requirement — HVAC-R and service water heating system controls
Fran Huang
05/19/2022
Special inspection requirement — HVAC-R and service water heating equipment
Fran Huang
05/19/2022
Special inspection requirement — HVAC-R and service water piping design and insulation
Fran Huang
05/18/2022
Filed — Alteration
SUBMIT BOILER WORK TYPE IN CONJUNCTION WITH ALT-1 APPLICATION #321593637.
B00705199-P2
05/09/2022
Special inspection requirement — Maintenance information
Fran Huang
05/09/2022
Special inspection requirement — Heating Systems
Fran Huang
05/09/2022
Special inspection requirement — HVAC-R and service water piping design and insulation
Fran Huang
05/09/2022
Special inspection requirement — HVAC-R and service water heating equipment
Fran Huang
05/09/2022
Special inspection requirement — HVAC-R and service water heating system controls
Fran Huang
05/09/2022
Special inspection requirement — Maintenance information
Fran Huang
05/09/2022
Special inspection requirement — Fire-Resistant Penetrations and Joints
Fran Huang
05/09/2022
Special inspection requirement — Heating Systems
Fran Huang
05/09/2022
Special inspection requirement — HVAC-R and service water piping design and insulation
Fran Huang
05/09/2022
Special inspection requirement — HVAC-R and service water heating equipment
Fran Huang
05/09/2022
Special inspection requirement — HVAC-R and service water heating system controls
Fran Huang
05/09/2022
Special inspection requirement — Fire-Resistant Penetrations and Joints
Fran Huang
04/29/2022
Inspection — Pass-Final Boiler Equipment Inspection
Pass
View inspection ↗
03/28/2022
Filed — Alteration
SUBMIT BOILER WORK TYPE IN CONJUNCTION WITH ALT-1 APPLICATION #321593637.
B00705199-P1
03/28/2022
Permit issued — Boiler Equipment
B00705199-I1-BE
03/28/2022
Special inspection requirement — HVAC-R and service water heating system controls
Fran Huang
03/28/2022
Special inspection requirement — Maintenance information
Fran Huang
03/28/2022
Special inspection requirement — HVAC-R and service water heating equipment
Fran Huang
03/28/2022
Special inspection requirement — HVAC-R and service water piping design and insulation
Fran Huang
03/28/2022
Special inspection requirement — Fire-Resistant Penetrations and Joints
Fran Huang
03/28/2022
Special inspection requirement — Heating Systems
Fran Huang
03/24/2022
Filed — Alteration
SUBMIT BOILER WORK TYPE IN CONJUNCTION WITH ALT-1 APPLICATION #321593637.
B00705199-I1
03/21/2022
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
03/15/2022
Inspection — Certified Sprinkler-SP-Fixtures-Finish
Certified
View inspection ↗
01/13/2022
Filed — Alteration
SUBMIT SPRINKLER WORK IN CONJUNCTION WITH DOB ALT1 APPLICATION #321593637.
B00637767-P1
01/13/2022
Special inspection requirement — Sprinkler Systems
NANIK MASSAND
01/03/2022
Signed off — Alteration
SUBSEQUENT FILING TEMPORARY SOLID FENCE FOR MAIN BUILDING CONSTRUCTION. IN CONJUNCTION WITH ALT-1 APPLICATION#321593637.
B00420256-I1
11/30/2021
Permit issued — Sprinklers
B00637767-I1-EW-SP
11/26/2021
Filed — Alteration
SUBMIT SPRINKLER WORK IN CONJUNCTION WITH DOB ALT1 APPLICATION #321593637.
B00637767-I1
08/11/2021
Violation issued (ECB, closed)
Unknown
04/22/2021
Filed — Alteration
PROPOSED INSTALLATION OF HEAVY DUTY SIDEWALK SHED AS PER PLANS. LIVE LOAD 300 LBS PER SQUARE FEET. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE. NO CHANGE IN USE, OCCUPANCY, BULK, OR EGRESS
B00436946-P1
04/12/2021
Violation issued (ECB, closed)
Construction
04/12/2021
Violation issued (ECB, closed)
Unknown
Latest 60 of 70 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWBoiler EquipmentSigned-offCATMAN PLUMBING INC05/31/2022
DOB NOWBoiler EquipmentSigned-offCATMAN PLUMBING INC03/28/2022
DOB NOWSprinklersSigned-offS & L PLUMBING INC11/30/2021
DOB NOWConstruction FenceSigned-offH&Z BUILDING CONSULTING I01/27/2021
DOB NOWSidewalk ShedSigned-offWINWAY DEVELOPMENT LLC12/07/2020
DOB NOWConstruction FenceSigned-offH&Z BUILDING CONSULTING I11/02/2020
BIS—ISSUEDSTAR UNIVERSE RENOVATION*08/02/2021
BIS—ISSUEDSTAR UNIVERSE RENOVATION*07/08/2021
BISPLISSUEDS & L PLUMBING INC01/15/2021
BIS—ISSUEDSTAR UNIVERSE RENOVATION*12/11/2020
BIS—ISSUEDSTAR UNIVERSE RENOVATION*12/02/2020
3 projects · most recent 03/22/2021
General Wiring
FiledStatusContractorScope
03/22/2021CompleteA.C. MORGAN ELECTRIC—
12/15/2020CompleteA.C. MORGAN ELECTRIC—
12/13/2020CompleteA.C. MORGAN ELECTRICGeneral Wiring
▾Field Inspections (DOB CAP) — 4
DateTypeResultReport
06/01/2022Pass-Final Boiler Equipment InspectionPassView ↗
04/29/2022Pass-Final Boiler Equipment InspectionPassView ↗
03/21/2022Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
03/15/2022Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 27
DateRequirementInspectorRole
06/13/2022FinalJian Yangprogress
05/19/2022Fire-Resistant Penetrations and JointsFran Huangspecial
05/19/2022Maintenance informationFran Huangenergy_progress
05/19/2022Heating SystemsFran Huangspecial
05/19/2022HVAC-R and service water heating system controlsFran Huangenergy_progress
05/19/2022HVAC-R and service water heating equipmentFran Huangenergy_progress
05/19/2022HVAC-R and service water piping design and insulationFran Huangenergy_progress
05/09/2022Maintenance informationFran Huangenergy_progress
05/09/2022Heating SystemsFran Huangspecial
05/09/2022HVAC-R and service water piping design and insulationFran Huangenergy_progress
05/09/2022HVAC-R and service water heating equipmentFran Huangenergy_progress
05/09/2022HVAC-R and service water heating system controlsFran Huangenergy_progress
05/09/2022Maintenance informationFran Huangenergy_progress
05/09/2022Fire-Resistant Penetrations and JointsFran Huangspecial
05/09/2022Heating SystemsFran Huangspecial
05/09/2022HVAC-R and service water piping design and insulationFran Huangenergy_progress
05/09/2022HVAC-R and service water heating equipmentFran Huangenergy_progress
05/09/2022HVAC-R and service water heating system controlsFran Huangenergy_progress
05/09/2022Fire-Resistant Penetrations and JointsFran Huangspecial
03/28/2022HVAC-R and service water heating system controlsFran Huangenergy_progress
03/28/2022Maintenance informationFran Huangenergy_progress
03/28/2022HVAC-R and service water heating equipmentFran Huangenergy_progress
03/28/2022HVAC-R and service water piping design and insulationFran Huangenergy_progress
03/28/2022Fire-Resistant Penetrations and JointsFran Huangspecial
03/28/2022Heating SystemsFran Huangspecial
Latest 25 of 27.
▾Documents — 166 on file (BIS + DOB NOW)
▸Plans & Drawings10
▸DOB NOWPlans/Sketch6
08/31/2026B00637767-I1Request digital key ↗
08/31/2026B00637767-P1Request digital key ↗
08/30/2026B00705199-P2Request digital key ↗
Showing 3 of 6 on file for this type
▸DOB NOWPlans/Sketch - Sidewalk Shed3
09/01/2026B00436946-P1Request digital key ↗
09/01/2026B00436946-I1Request digital key ↗
08/15/2026B00436946-P2Request digital key ↗
▸DOB NOWPlans/Sketch - Construction Fence1
09/02/2026B00420256-I1Request digital key ↗
▸Applications & Permits15
▸BISPLAN / WORK APPROVAL APPLICATION10
05/11/2022321593637Open ↗
05/10/2022321593637Open ↗
09/02/2021321593637Open ↗
Showing 3 of 10 on file for this type
▸BISWORK PERMIT APPLICATION5
08/03/2021321593637Open ↗
01/15/2021321593637Open ↗
12/14/2020321593637Open ↗
Showing 3 of 5 on file for this type
▸Zoning, Tax Lot & Property Records6
▸BISZONING EXHIBIT III:DESC. & OWNRSHP.STMNT1
08/22/2019321593637Open ↗
▸BISVERIFY TAX LOT1
07/27/2022321593637Open ↗
▸BISADDRESS: NEW HOUSE NUMBER APPROVED1
08/23/2019321593637Open ↗
▸BISCO OBJ: VERIFY ADDRESS-TOPO STAMP1
06/10/2022321593637Open ↗
▸BISZONING DIAGRAM1
09/05/2019321593637Open ↗
▸BISZONING EXHIBIT I: CERTIFICATION1
08/22/2019321593637Open ↗
▸Seals & Professional Certifications43
▸DOB NOWProgress Inspector Seal & Signature18
09/23/2026B00705199-S1Open ↗
09/23/2026B00705199-S1Open ↗
09/23/2026B00705199-S1Open ↗
Showing 3 of 18 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature10
09/23/2026B00705199-I1Open ↗
09/23/2026B00705199-S1Open ↗
09/23/2026B00705199-S1Open ↗
Showing 3 of 10 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature10
09/01/2026B00436946-P2Open ↗
09/01/2026B00436946-P1Open ↗
09/01/2026B00436946-I1Open ↗
Showing 3 of 10 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION5
01/12/2017321499598Open ↗
10/14/2016321165476Open ↗
10/14/2016321165476Open ↗
Showing 3 of 5 on file for this type
▸Trade Schedules & Equipment13
▸BISSCHEDULE B - PLUMBING4
09/02/2021321593637Open ↗
07/02/2021321593637Open ↗
06/29/2021321593637Open ↗
Showing 3 of 4 on file for this type
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE2
01/12/2017321499598Open ↗
07/09/2015321165476Open ↗
▸BISHVAC & SERVICE WATER HEATING EQUIPMENT1
01/20/2022321593637Open ↗
▸BISFIRE ALARM/SIGNAL SYSTEM (FA) SIGNOFF1
06/13/2022321593637Open ↗
▸BISHVAC & SERVICE WATER HEATING SYSTEM CONTROLS1
01/20/2022321593637Open ↗
▸BISDETECTOR:SMOKE-CERT. OF INSTALLATION1
06/13/2022321593637Open ↗
▸BISDETECTOR:CARBON MONOXIDE-CERT.OF INSTALL1
06/13/2022321593637Open ↗
▸BISEQUIPMENT USE APPLICATION/PERMIT1
09/05/2019321593637Open ↗
▸BISHEATING SYSTEMS1
01/20/2022321593637Open ↗
▸Safety & Tenant Protection1
▸BISSTREET TREE CHECKLIST1
09/05/2019321593637Open ↗
▸Environmental & Asbestos9
▸DOB NOWDEP ACP-5: Asbestos Assessment Report6
08/31/2026B00637767-P1Open ↗
08/31/2026B00637767-I1Open ↗
08/30/2026B00705199-P1Open ↗
Showing 3 of 6 on file for this type
▸BISASBESTOS: CERTIFICATION (DEP ACP5)3
09/05/2019321593637Open ↗
08/22/2019321593637Open ↗
07/09/2015321165476Open ↗
▸Energy Compliance18
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY2
11/27/2020321593637Open ↗
09/05/2019321593637Open ↗
▸DOB NOWPreliminary Commissioning Report Certification2
08/13/2026B00705199-I1Open ↗
08/13/2026B00705199-S1Open ↗
▸DOB NOWEN2: As Built Energy Analysis2
08/13/2026B00705199-I1Open ↗
08/13/2026B00705199-S1Open ↗
▸BISINTERIOR LIGHTING POWER1
01/20/2022321593637Open ↗
▸BISFENESTRATION U-FACTOR & PRODUCT RATING1
01/20/2022321593637Open ↗
▸BISFENESTRATION AREAS1
01/20/2022321593637Open ↗
▸BISINSULATION PLACEMENT & R VALUES1
01/20/2022321593637Open ↗
▸BISLIGHTING IN DWELLING UNITS1
01/20/2022321593637Open ↗
▸BISENERGY CODE COMPLIANCE INSPECTIONS1
01/20/2022321593637Open ↗
▸BISAS-BUILT ENERGY ANALYSIS (EN2)1
06/10/2022321593637Open ↗
▸BISLIGHTING CONTROLS1
01/20/2022321593637Open ↗
▸BIS* HVAC INSULATION AND SEALING1
01/20/2022321593637Open ↗
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS1
07/09/2015321165476Open ↗
▸BISEXTERIOR LIGHTING POWER1
01/20/2022321593637Open ↗
▸BISFENESTRATION AIR LEAKAGE1
01/20/2022321593637Open ↗
▸Inspections & Test Reports18
▸BISTECHNICAL REPORT: SOIL INSPECTION4
09/05/2019321593637Open ↗
08/26/2019321593637Open ↗
10/14/2016321165476Open ↗
Showing 3 of 4 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY3
11/27/2020321593637Open ↗
09/05/2019321593637Open ↗
09/05/2019321593637Open ↗
▸BISTR3: CONCRETE DESIGN MIX TECHNICAL REPORT1
12/04/2020321593637Open ↗
▸BISFIRE-RESISTANT PENETRATIONS AND JOINTS (FIRESTOP)1
01/20/2022321593637Open ↗
▸BISFIRE-RESISTIVE RATED CONSTRUCTION1
01/20/2022321593637Open ↗
▸BISFOOTING AND FOUNDATION INSPECTION1
01/20/2022321593637Open ↗
▸BISMASONRY1
01/20/2022321593637Open ↗
▸BISSTRUCTURAL STEEL - HIGH STRENGTH BOLTING1
01/20/2022321593637Open ↗
▸BISSTRUCTURAL STEEL - WELDING1
01/20/2022321593637Open ↗
▸BISSOIL REPORT1
09/05/2019321593637Open ↗
▸BISTECHNICAL REPORT: CONCRETE/TEST CYLINDER1
07/25/2022321593637Open ↗
▸BISSOIL PERC. TEST-STORM WATER SYSTEM (DRYWELL)1
01/20/2022321593637Open ↗
▸BISSTRUCTURAL STABILITY - EXISTING BUILDINGS1
01/20/2022321593637Open ↗
▸Approvals, Objections & Sign-offs7
▸BISSCHEDULE A - OCCUPANCY / USE4
05/11/2022321593637Open ↗
05/10/2022321593637Open ↗
08/20/2019321593637Open ↗
Showing 3 of 4 on file for this type
▸BISSUPERSEDING LETTER2
08/03/2021321593637Open ↗
12/14/2020321593637Open ↗
▸BISCONSTRUCTION (OT) SIGNOFF1
07/01/2022321593637Open ↗
▸Cost, Insurance & Ownership8
▸BISCOST AFFIDAVIT3
09/05/2019321593637Open ↗
01/12/2017321499598Open ↗
07/09/2015321165476Open ↗
▸BISPROJECT-SPECIFIC GL INSURANCE2
08/03/2021321593637Open ↗
12/02/2020321593637Open ↗
▸BISAcord 25 (Acord Certificate of Liability Insurance)2
08/03/2021321593637Open ↗
12/04/2020321593637Open ↗
▸BISCOST AFFIDAVIT (FINAL): PW31
06/10/2022321593637Open ↗
▸Filing & Intake Forms7
▸BISADDITIONAL INFORMATION4
07/19/2022321593637Open ↗
05/20/2022321593637Open ↗
12/10/2021321593637Open ↗
Showing 3 of 4 on file for this type
▸BISEFILING COVER SHEET3
08/20/2019321593637Open ↗
01/12/2017321499598Open ↗
07/09/2015321165476Open ↗
▸Other Documents5
▸BISLOWEST FLOOR ELEVATION1
01/20/2022321593637Open ↗
▸BISMAINTENANCE INFORMATION1
01/20/2022321593637Open ↗
▸BISPROTECTION OF EXPOSED FOUNDATION INSULATION1
01/20/2022321593637Open ↗
▸BISPLOT DIAGRAM1
08/26/2019321593637Open ↗
▸BISUNDERPINNING1
01/20/2022321593637Open ↗