← Back
BuildNYC
Two stories - detached, small or mid-size
323 BEACH 43RD STREET
QUEENS · BIN 4436039
💬 Discuss this project
2003Year Built
—Stories
A1Building Class
R4Zoning
2,891 sfGross Floor Area
1Units
Rent Stabilized35 Active Violations 33 unresolved · 2 paperwork only 1 old, status unconfirmed ▸FDNY Report ↗
Two stories - detached, small or mid-size · 4,782 sf lot · 0.6 FAR built · Flood zone AE
Locations of Work
StructuralElectricalMechanicalPlumbingEquipment
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Permit Issued — active, not yet Signed-off
Site & exteriorTemporary pipe scaffold installationUnder Construction14p · 3 filings · 12 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
NYC Department of Housing Preservation and Development1004/09/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Mje Professional Services101/09/2026
South Bay Engineering209/17/2025
S Associates109/04/2025
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Expedite Dem403/21/2026
SNR Expediting Design203/21/2026
Summit Consulting & Expediting203/21/2026
Lakhi General Contractor203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Statewide Demolitionspecialty_contractor104/09/2026
Gurnoor ConstructionScaffold104/08/2026
Lakhi General ContractorScaffold104/09/2026
Statewide DemolitionScaffold104/09/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Ashwani Khanna PE5256109/17/2025
Building Lifecycle
All (35)Filed (4)Permit Issued (4)Signed Off (2)Violation (21)Objection (2)Special Inspection (2)
05/07/2026
Violation issued (HPD, open)
A
03/03/2026
Permit issued — Supported Scaffold
Q01340068-I1-SF
01/09/2026
Filed — Alteration
PROPOSED INSTALLATION OF TEMPORARY PIPE SCAFFOLD AS PER PLANS. WORK SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE. NO CHANGE IN USE, OCCUPANCY, OR EGRESS UNDER THIS APPLICATION.
Q01340068-I1
11/25/2025
Signed off — Full Demolition
installation of construction fence to protect site during full demolition under HPD IED
Q01268324-I1
11/21/2025
Permit issued — Full Demolition
Q01268324-I1-FD
11/21/2025
Violation issued (HPD, open)
I
10/09/2025
Objection resolved — Addressed
10/07/2025
Objection raised — Structural
09/29/2025
Permit issued — Construction Fence
Q01268324-S1-FN
09/25/2025
Signed off — Alteration
INSTALLATION OF SUPPORTED SCAFFOLD AS PER PLANS. SCAFFOLD SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE. NO CHANGE IN USE, OCCUPANCY, OR EGRESS UNDER THIS APPLICATION. CONSTRUCTION FENCE FILED UNDER SEPERATE APPLICATION.
Q01278763-I1
09/17/2025
Filed — Full Demolition
installation of construction fence to protect site during full demolition under HPD IED
Q01268324-I1
09/17/2025
Filed — Full Demolition
installation of construction fence to protect site during full demolition under HPD IED
Q01268324-S1
09/08/2025
Permit issued — Supported Scaffold
Q01278763-I1-SF
09/04/2025
Filed — Alteration
INSTALLATION OF SUPPORTED SCAFFOLD AS PER PLANS. SCAFFOLD SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE. NO CHANGE IN USE, OCCUPANCY, OR EGRESS UNDER THIS APPLICATION. CONSTRUCTION FENCE FILED UNDER SEPERATE APPLICATION.
Q01278763-I1
08/07/2025
Special inspection requirement — Structural Stability – Alterations of existing Buildings
ASHWANI KHANNA
08/07/2025
Special inspection requirement — Demolition
ASHWANI KHANNA
06/12/2025
Violation issued (HPD, open)
A
01/10/2025
Violation issued (ECB, open)
Construction
12/03/2024
Violation issued (HPD, open)
I
04/15/2024
Violation issued (HPD, open)
A
11/27/2023
Violation issued (HPD, open)
I
03/29/2023
Violation issued (HPD, open)
A
11/16/2022
Violation issued (HPD, open)
I
03/04/2022
Violation issued (HPD, open)
I
03/04/2022
Violation issued (HPD, open)
A
04/15/2021
Violation issued (HPD, open)
A
04/15/2021
Violation issued (HPD, open)
I
09/02/2020
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
01/27/2020
Violation issued (ECB, open)
Unknown
11/01/2019
Violation issued (HPD, open)
I
10/24/2018
Violation issued (HPD, open)
I
12/05/2017
Violation issued (HPD, open)
I
11/21/2016
Violation issued (HPD, open)
I
10/16/2015
Violation issued (HPD, closed)
I
02/27/2015
Violation issued (HPD, closed)
I
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSupported ScaffoldPermit IssuedLakhi General Contractor03/03/2026
DOB NOWFull DemolitionSigned-offStatewide Demolition11/21/2025
DOB NOWConstruction FenceSigned-offStatewide Demolition09/29/2025
DOB NOWSupported ScaffoldSigned-offGurnoor Construction09/08/2025
BISBLISSUEDMorris Oil Service01/29/1990
1 project · most recent 05/13/2020
General Wiring
FiledStatusContractorScope
05/13/2020Permit IssuedHirschel ElectricalGeneral Wiring
2 projects · most recent 01/09/2026
Scaffold Fence
FiledStatusContractorScope
01/09/2026Permit IssuedLakhi General ContractorScaffold
09/17/2025Signed-offStatewide DemolitionFence
▾Special Inspection Requirements (DOB NOW) — 2
DateRequirementInspectorRole
08/07/2025Structural Stability – Alterations of existing BuildingsASHWANI KHANNAspecial
08/07/2025DemolitionASHWANI KHANNAspecial
▾Documents — 14 on file (BIS + DOB NOW)
▸Plans & Drawings4
▸DOB NOWPlans/Sketch4
08/19/2026Q01278763-I1Request digital key ↗
08/18/2026Q01268324-S1Request digital key ↗
08/18/2026Q01268324-I1Request digital key ↗
Showing 3 of 4 on file for this type
▸Seals & Professional Certifications5
▸DOB NOWDPL-1: Design Professional Seal & Signature3
08/19/2026Q01278763-I1Open ↗
08/17/2026Q01340068-I1Open ↗
08/13/2026Q01268324-S1Open ↗
▸DOB NOWSpecial Inspector Seal & Signature2
08/27/2026Q01268324-I1Open ↗
08/27/2026Q01268324-I1Open ↗
▸Trade Schedules & Equipment4
▸DOB NOWElectric Cut-Off1
08/13/2026Q01268324-I1Open ↗
▸DOB NOWWater Cut-Off1
08/13/2026Q01268324-I1Open ↗
▸DOB NOWGas Cut-Off1
08/13/2026Q01268324-I1Open ↗
▸DOB NOWSewer Cut-Off1
08/13/2026Q01268324-I1Open ↗
▸Other Documents1
▸DOB NOWSite Survey: Initial1
08/13/2026Q01325017-I1Open ↗