← Back
BuildNYC
One story - permanent living quarter
323 CLEVELAND AVENUE
STATEN ISLAND · BIN 5066169
💬 Discuss this project
1920Year Built
1Stories
A2Building Class
C3AZoning
944 sfGross Floor Area
1Units
16 Active Violations ▸FDNY Report ↗
One story - permanent living quarter · Owner of record: Demco Construction · 3,760 sf lot · 0.25 FAR built · Flood zone AE
Locations of Work
Architecture
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Roof1 filing · 11 docs
Floor 21 filing · 11 docs
Floor 1Concrete curb cut installation2 filings · 15 docs
Filed — no permit issuedPrivate Residence1p · 1 filing · 2 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
Demco Holdings1003/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Think Design Architecture506/16/2022
Building Lifecycle
06/16/2022
Filed — New Building
APPLICATION IS FILED FOR THE CONSTRUCTION OF NEW 3-STORY (PER ZONING & CODE), 2-FAMILY RESIDENCE. ALL WORK AS PER PLANS SUBMITTED HEREWITH.
S00557317-S1
05/23/2022
Objection raised — Zoning
05/23/2022
Objection raised — Admin
05/23/2022
Objection raised — Energy
05/06/2022
Special inspection requirement — HVAC-R and service water heating system controls
62 history events on file for this building. Sign in free to see the full history. Sign in · Create account
Nothing on file for this building.
1 project · most recent 06/16/2022
Air Conditioning Systems Heating Systems
FiledStatusContractorScope
06/16/2022——Air Conditioning Systems, Heating Systems
1 project · most recent 06/16/2022
Gas Storm Water/Sanitary
FiledStatusContractorScope
06/16/2022——Gas, Storm, Water/Sanitary
1 project · most recent 06/16/2022
FiledStatusContractorScope
06/16/2022———
▾Special Inspection Requirements (DOB NOW) — 31
DateRequirementInspectorRole
05/06/2022HVAC-R and service water heating system controls—energy_progress
05/06/2022Fire-Resistant Penetrations and Joints—special
05/06/2022Energy Code Compliance Inspections—progress
05/06/2022HVAC-R and service water piping design and insulation—energy_progress
05/06/2022HVAC-R and service water heating equipment—energy_progress
04/07/2022Protection of exposed foundation insulation—energy_progress
04/07/2022Duct leakage testing, insulation and design—energy_progress
04/07/2022HVAC-R and service water heating equipment—energy_progress
04/07/2022Wood – Prefabricated I-Joists—special
04/07/2022HVAC-R and service water heating system controls—energy_progress
08/09/2021Subsurface Investigations (Borings/Test Pits)—special
07/14/2021Lowest Floor Elevation—progress
07/14/2021Structural Wood Frame—progress
07/14/2021Structural Stability – Alterations of existing buildings—special
07/14/2021Air barrier - visual inspection—energy_progress
07/14/2021Fenestration and door U-factor and product ratings—energy_progress
07/14/2021Fenestration areas—energy_progress
07/14/2021Maintenance information—energy_progress
07/14/2021Permanent certificate—energy_progress
07/14/2021Insulation placement and R values—energy_progress
07/14/2021Fenestration air leakage—energy_progress
07/14/2021Structural Steel - Details—special
07/14/2021Concrete - Cast-In-Place—special
07/14/2021Fire-Resistant Penetrations and Joints—special
07/14/2021Flood Zone Compliance (attach FEMA elevation/dry floodproofing certificate where applicable)—special
Latest 25 of 31.
41 filed documents on file for this building. Sign in free to see the full history. Sign in · Create account