← Back
Over six families without stores
323 EAST 83 STREET
MANHATTAN · Upper East Side-Yorkville · BIN 1049924
💬 Discuss this project
1920Year Built
5Stories
C1Building Class
R8BZoning
10,100 sfGross Floor Area
20Units
Rent Stabilized2 Open Violations ▸
Over six families without stores · Owner of record: FAMCO LLC · 2,554 sf lot · 3.95 FAR built · Flood zone X
Locations of Work
No floor-level scope or drawing coverage on file for this building.
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
FAMCO LLC103/22/2026
FAME EQUITIES & MGMT.103/22/2026
FAMECO203/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
NEW YORK ENGINEERING ASSOC., P.C.707/28/2021
MULLEN PALANDRANI ARCHITECTS103/15/2021
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
NEW YORK ENGINEERING ASSOCIATES P C1003/21/2026
MPA103/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
CC CONTROLLED PLBG CO INCPlumbing407/08/2026
BOHEMIA J&P LLCGeneral Contractor107/08/2026
C C CONTROLLED COMBUSTIONGeneral Contractor107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
NEW YORK ENGINEERING ASSO851407/28/2021
Building Lifecycle
All (55)Filed (8)Permit Issued (6)Signed Off (4)Violation (7)Inspection (8)Objection (4)Special Inspection (18)
10/13/2023
Signed off — Alteration
LOBBY RESTORATION INCLUDING THE REPLACEMENT OF EXISTING ENTRY DOOR, MAILBOXES, AWNING AND FINISHES THROUGHOUT. REPAIR REPLACE WINDOW GUARDS AND CELLAR WINDOWS.
M00451602-I1
10/11/2023
Inspection — Pass-Final General Construction Non-Directive 14
Pass
View inspection ↗
11/02/2022
Violation issued (HPD, closed)
I
03/25/2022
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
01/21/2022
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
11/11/2021
Signed off — Alteration
GAS CONNECTION FOR REPLACEMENT GAS BURNER.
M00337221-S1
11/11/2021
Signed off — Alteration
GAS CONNECTION FOR REPLACEMENT GAS BURNER.
M00337221-S2
11/11/2021
Signed off — Alteration
GAS CONNECTION FOR REPLACEMENT GAS BURNER.
M00337221-I1
11/10/2021
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
11/10/2021
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
11/10/2021
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
11/07/2021
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
11/04/2021
Permit issued — General Construction
M00451602-I1-GC
10/22/2021
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
10/01/2021
Permit issued — Plumbing
M00337221-I1-PL
09/08/2021
Permit issued — Boiler Equipment
M00337221-S1-BE
07/29/2021
Special inspection requirement — Mechanical Systems
LOUIS ARENA
07/29/2021
Special inspection requirement — Final
LOUIS ARENA
07/29/2021
Special inspection requirement — Chimneys and vents
LOUIS ARENA
07/28/2021
Filed — Alteration
GAS CONNECTION FOR REPLACEMENT GAS BURNER.
M00337221-P4
07/28/2021
Special inspection requirement — Heating Systems
LOUIS ARENA
07/28/2021
Special inspection requirement — HVAC and service water heating system controls
LOUIS ARENA
07/28/2021
Special inspection requirement — HVAC and service water heating equipment
LOUIS ARENA
07/28/2021
Special inspection requirement — Maintenance information
LOUIS ARENA
07/27/2021
Filed — Alteration
GAS CONNECTION FOR REPLACEMENT GAS BURNER.
M00337221-P3
07/20/2021
Special inspection requirement — Energy Code Compliance Inspections
LOUIS ARENA
07/19/2021
Filed — Alteration
GAS CONNECTION FOR REPLACEMENT GAS BURNER.
M00337221-P2
06/16/2021
Special inspection requirement — Chimneys and vents
LOUIS ARENA
06/16/2021
Special inspection requirement — Final
LOUIS ARENA
06/16/2021
Special inspection requirement — Mechanical Systems
LOUIS ARENA
03/17/2021
Objection raised — Other
03/17/2021
Objection resolved — Addressed
03/17/2021
Objection raised — Accessibility
03/17/2021
Objection resolved — Addressed
03/15/2021
Filed — Alteration
LOBBY RESTORATION INCLUDING THE REPLACEMENT OF EXISTING ENTRY DOOR, MAILBOXES, AWNING AND FINISHES THROUGHOUT. REPAIR REPLACE WINDOW GUARDS AND CELLAR WINDOWS.
M00451602-I1
03/15/2021
Filed — Alteration
GAS CONNECTION FOR REPLACEMENT GAS BURNER.
M00337221-P1
02/25/2021
Special inspection requirement — Lighting controls
Peter Mullen
02/25/2021
Special inspection requirement — Exterior lighting power
Peter Mullen
02/25/2021
Special inspection requirement — Energy Code Compliance Inspections
Peter Mullen
02/17/2021
Special inspection requirement — Energy Code Compliance Inspections
LOUIS ARENA
02/12/2021
Special inspection requirement — Interior lighting power
Peter Mullen
02/12/2021
Special inspection requirement — Fenestration and door U-factor and product ratings
Peter Mullen
02/12/2021
Special inspection requirement — Fenestration air leakage
Peter Mullen
08/20/2020
Filed — Alteration
GAS CONNECTION FOR REPLACEMENT GAS BURNER.
M00337221-S2
08/20/2020
Permit issued — Mechanical Systems
M00337221-S2-MS
08/20/2020
Permit issued — Boiler Equipment
M00337221-S1-BE
08/19/2020
Filed — Alteration
GAS CONNECTION FOR REPLACEMENT GAS BURNER.
M00337221-S1
08/12/2020
Permit issued — Plumbing
M00337221-I1-PL
08/10/2020
Filed — Alteration
GAS CONNECTION FOR REPLACEMENT GAS BURNER.
M00337221-I1
10/18/2013
Violation issued (HPD, closed)
C
10/18/2013
Violation issued (HPD, closed)
C
12/31/2009
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
04/28/1999
Violation issued (ECB, closed)
Construction
04/09/1999
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
03/18/1993
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionSigned-offBOHEMIA J&P LLC11/04/2021
DOB NOWPlumbingSigned-offCC CONTROLLED PLBG CO INC10/01/2021
DOB NOWBoiler EquipmentSigned-offCC CONTROLLED PLBG CO INC09/08/2021
DOB NOWMechanical SystemsSigned-offC C CONTROLLED COMBUSTION08/20/2020
DOB NOWBoiler EquipmentSigned-offCC CONTROLLED PLBG CO INC08/20/2020
DOB NOWPlumbingSigned-offCC CONTROLLED PLBG CO INC08/12/2020
BISPLISSUEDCALRAY SALES AND SERVICE INC.01/10/1991
BISBLISSUEDCALRAY SALES AND SERVICE INC.01/10/1991
Nothing on file for this building.
▾Field Inspections (DOB CAP) — 8
DateTypeResultReport
10/11/2023Pass-Final General Construction Non-Directive 14PassView ↗
03/25/2022Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
01/21/2022Pass-Final PL - Up to 3 Requested FloorsPassView ↗
11/10/2021Certified Gas-Gas-Piping-RoughingCertifiedView ↗
11/10/2021Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
11/10/2021Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
11/07/2021Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
10/22/2021Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 18
DateRequirementInspectorRole
07/29/2021Mechanical SystemsLOUIS ARENAspecial
07/29/2021FinalLOUIS ARENAprogress
07/29/2021Chimneys and ventsLOUIS ARENAspecial
07/28/2021Heating SystemsLOUIS ARENAspecial
07/28/2021HVAC and service water heating system controls LOUIS ARENAenergy_progress
07/28/2021HVAC and service water heating equipment LOUIS ARENAenergy_progress
07/28/2021Maintenance informationLOUIS ARENAenergy_progress
07/20/2021Energy Code Compliance InspectionsLOUIS ARENAprogress
06/16/2021Chimneys and ventsLOUIS ARENAspecial
06/16/2021FinalLOUIS ARENAprogress
06/16/2021Mechanical SystemsLOUIS ARENAspecial
02/25/2021Lighting controlsPeter Mullenenergy_progress
02/25/2021Exterior lighting powerPeter Mullenenergy_progress
02/25/2021Energy Code Compliance InspectionsPeter Mullenprogress
02/17/2021Energy Code Compliance InspectionsLOUIS ARENAprogress
02/12/2021Interior lighting powerPeter Mullenenergy_progress
02/12/2021Fenestration and door U-factor and product ratingsPeter Mullenenergy_progress
02/12/2021Fenestration air leakagePeter Mullenenergy_progress
▾Documents — 51 on file (BIS + DOB NOW)
▸Plans & Drawings8
▸DOB NOWPlans/Sketch - Plumbing3
09/04/2026M00337221-I1Request digital key ↗
08/15/2026M00337221-P1Request digital key ↗
08/15/2026M00337221-P2Request digital key ↗
▸DOB NOWPlans/Sketch - Mechanical Systems2
09/04/2026M00337221-S2Request digital key ↗
08/15/2026M00337221-P4Request digital key ↗
▸DOB NOWPlans/Sketch - Boiler Equipment2
09/04/2026M00337221-S1Request digital key ↗
08/15/2026M00337221-P3Request digital key ↗
▸DOB NOWPlans/Sketch - General Construction1
08/15/2026M00451602-I1Request digital key ↗
▸Seals & Professional Certifications26
▸DOB NOWProgress Inspector Seal & Signature13
09/23/2026M00337221-S1Open ↗
09/23/2026M00337221-S1Open ↗
09/23/2026M00337221-S1Open ↗
Showing 3 of 13 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature8
08/13/2026M00337221-P3Open ↗
08/13/2026M00337221-I1Open ↗
08/13/2026M00337221-S2Open ↗
Showing 3 of 8 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature5
09/23/2026M00337221-S1Open ↗
09/02/2026M00337221-S2Open ↗
09/02/2026M00337221-S2Open ↗
Showing 3 of 5 on file for this type
▸Safety & Tenant Protection7
▸DOB NOWTenant Protection Plan7
08/13/2026M00337221-P1Open ↗
08/13/2026M00337221-I1Open ↗
08/13/2026M00337221-P2Open ↗
Showing 3 of 7 on file for this type
▸Environmental & Asbestos8
▸DOB NOWDEP ACP-5: Asbestos Assessment Report8
08/13/2026M00451602-I1Open ↗
08/13/2026M00337221-P3Open ↗
08/13/2026M00337221-P2Open ↗
Showing 3 of 8 on file for this type
▸Energy Compliance2
▸DOB NOWPreliminary Commissioning Report Certification1
08/13/2026M00337221-S1Open ↗
▸DOB NOWEN2: As Built Energy Analysis.1
08/13/2026M00451602-I1Open ↗