← Back
BROOKLYN
The 323 South 5th Street Condominium
323 SOUTH 5 STREET · Williamsburg · BIN 3063490
💬 Discuss this project
—Year Built
—Stories
—Building Class
—Zoning
—Gross Floor Area
—Units
Rent Stabilized40 Open Violations ▸FDNY Report ↗
Flood zone X
Locations of Work
ArchitectureStructuralElectricalMechanicalPlumbingFire ProtectionGeneral
Roof43p · 1 filing · 20 docs
Floor 337p · 2 filings · 20 docs
Floor 237p · 2 filings · 20 docs
Floor 137p · 2 filings · 20 docs
Cellar56p · 2 filings · 20 docs
Basement42p · 1 filing · 20 docs
Sub-Basement1p · 1 filing · 18 docs
Site & exterior20p · 3 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
LT PRO CONSTRUCTION5404/09/2026
323 S5403/21/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
03/14/2023$2.8M—Private party → 323 S5 LLC— not available
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
CL ENGINEERING P.C.1604/07/2026
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
METRO DESIGN CONSULTANTS INC3003/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
KORK INCGeneral Contractor1504/09/2026
LT PRO CONSTRUCTION INCGeneral Contractor1104/09/2026
PLUMB-IT MECHANICAL INCPlumbing207/08/2026
DOUG'S PLBG & HTG SERV COFire Protection107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
CL ENGINEERING P.C.67811204/07/2026
HSU & ASSOCIATES8025105/30/2023
Building Lifecycle
All (186)Filed (16)Permit Issued (15)Signed Off (9)Violation (47)Inspection (15)Objection (54)Special Inspection (30)
06/18/2026
Signed off — Alteration CO
Earthwork and Foundation work filed in conjunction with DOB NOW Application # B00902146-I1. INSTALL FOUNDATION AT REAR OF EXISTING BUILDING.
B00902146-I1
05/05/2026
Violation issued (HPD, open)
A
04/08/2026
Special inspection requirement — Lighting controls
CHRISTIAN LOZADA
04/08/2026
Special inspection requirement — Metering
CHRISTIAN LOZADA
04/08/2026
Special inspection requirement — HVAC-R and service water heating equipment
CHRISTIAN LOZADA
04/08/2026
Special inspection requirement — Exterior lighting power
CHRISTIAN LOZADA
04/08/2026
Special inspection requirement — Fenestration and door U-factor and product ratings
CHRISTIAN LOZADA
04/08/2026
Special inspection requirement — Fire-Resistance Rated Construction
CHRISTIAN LOZADA
04/08/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
CHRISTIAN LOZADA
04/08/2026
Special inspection requirement — Fenestration air leakage
CHRISTIAN LOZADA
04/08/2026
Special inspection requirement — Lighting in dwelling units
CHRISTIAN LOZADA
04/08/2026
Special inspection requirement — Insulation placement and R values
CHRISTIAN LOZADA
04/08/2026
Special inspection requirement — HVAC-R and service water heating system controls
CHRISTIAN LOZADA
04/08/2026
Special inspection requirement — Air barrier - visual inspection
CHRISTIAN LOZADA
04/08/2026
Special inspection requirement — Maintenance information
CHRISTIAN LOZADA
04/08/2026
Special inspection requirement — Fenestration areas
CHRISTIAN LOZADA
04/08/2026
Special inspection requirement — Structural Steel - Welding
CHRISTIAN LOZADA
04/08/2026
Special inspection requirement — Structural Steel - Details
CHRISTIAN LOZADA
04/08/2026
Special inspection requirement — Masonry
CHRISTIAN LOZADA
04/08/2026
Special inspection requirement — Structural Steel - High Strength Bolting
CHRISTIAN LOZADA
04/08/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
CHRISTIAN LOZADA
04/08/2026
Special inspection requirement — Structural Cold-Formed Steel
CHRISTIAN LOZADA
04/08/2026
Special inspection requirement — Subsurface Investigations (Borings/Test Pits)
INDARDEO PARBHUNATH
04/08/2026
Special inspection requirement — Concrete - Cast-In-Place
CHRISTIAN LOZADA
04/08/2026
Special inspection requirement — Subgrade Inspections
CHRISTIAN LOZADA
04/08/2026
Special inspection requirement — Final
PETER CHO
04/08/2026
Special inspection requirement — Energy Code Compliance Inspections
CHRISTIAN LOZADA
04/08/2026
Special inspection requirement — Structural Stability – Alterations of existing buildings
CHRISTIAN LOZADA
04/07/2026
Filed — Alteration CO
Earthwork and Foundation work filed in conjunction with DOB NOW Application # B00902146-I1. INSTALL FOUNDATION AT REAR OF EXISTING BUILDING.
B00902146-P6
04/07/2026
Special inspection requirement — Concrete - Cast-In-Place
CHRISTIAN LOZADA
04/07/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
CHRISTIAN LOZADA
04/07/2026
Special inspection requirement — Masonry
CHRISTIAN LOZADA
04/07/2026
Special inspection requirement — Structural Cold-Formed Steel
CHRISTIAN LOZADA
11/19/2025
Violation issued (HPD, open)
I
06/10/2025
Violation issued (HPD, open)
A
04/14/2025
Signed off — Alteration CO
Earthwork and Foundation work filed in conjunction with DOB NOW Application # B00902146-I1. INSTALL FOUNDATION AT REAR OF EXISTING BUILDING.
B00902146-S1
02/21/2025
Signed off — Alteration CO
Earthwork and Foundation work filed in conjunction with DOB NOW Application # B00902146-I1. INSTALL FOUNDATION AT REAR OF EXISTING BUILDING.
B00902146-S3
01/28/2025
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
01/24/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
01/21/2025
Signed off — Alteration CO
Earthwork and Foundation work filed in conjunction with DOB NOW Application # B00902146-I1. INSTALL FOUNDATION AT REAR OF EXISTING BUILDING.
B00902146-S2
01/07/2025
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
12/20/2024
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
12/04/2024
Permit issued — Plumbing
B00902146-S1-PL
11/26/2024
Violation issued (HPD, open)
I
11/20/2024
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
11/18/2024
Filed — Alteration CO
Earthwork and Foundation work filed in conjunction with DOB NOW Application # B00902146-I1. INSTALL FOUNDATION AT REAR OF EXISTING BUILDING.
B00902146-P5
11/12/2024
Signed off — Alteration
INSTALLATION OF TEMPORARY CONSTRUCTION FENCE IN CONJUNCTION WITH ALT APPLICATION B00902146-I1. FENCE SHALL COMPLY WITH CHAPTER 33 OF THE NYC BUILDING CODE. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
B00959386-I1
11/06/2024
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
10/28/2024
Inspection — Certified Sprinkler-SP-Fixtures-Finish
Certified
View inspection ↗
10/24/2024
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
10/24/2024
Inspection — Fail-Final CND-Occupancy Inspection
Fail
View inspection ↗
10/08/2024
Inspection — No Access-Final PL - Up to 3 Requested Floors
No Access
View inspection ↗
09/05/2024
Filed — Alteration CO
Earthwork and Foundation work filed in conjunction with DOB NOW Application # B00902146-I1. INSTALL FOUNDATION AT REAR OF EXISTING BUILDING.
B00902146-P2
09/05/2024
Filed — Alteration CO
Earthwork and Foundation work filed in conjunction with DOB NOW Application # B00902146-I1. INSTALL FOUNDATION AT REAR OF EXISTING BUILDING.
B00902146-P4
09/05/2024
Filed — Alteration CO
Earthwork and Foundation work filed in conjunction with DOB NOW Application # B00902146-I1. INSTALL FOUNDATION AT REAR OF EXISTING BUILDING.
B00902146-P3
09/03/2024
Objection resolved — Addressed
08/14/2024
Objection raised — Scope
08/08/2024
Objection raised — Cost
08/08/2024
Objection resolved — Addressed
08/07/2024
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
Latest 60 of 186 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingSigned-offJVR PLBG AND HEATING INC12/04/2024
DOB NOWPlumbingSigned-offDOUG'S PLBG & HTG SERV CO04/19/2024
DOB NOWFoundationSigned-offLT PRO CONSTRUCTION INC03/14/2024
DOB NOWSupport of ExcavationSigned-offLT PRO CONSTRUCTION INC03/13/2024
DOB NOWConstruction FenceSigned-offLT PRO CONSTRUCTION INC03/06/2024
DOB NOWMechanical SystemsSigned-offLT PRO CONSTRUCTION INC03/05/2024
DOB NOWGeneral ConstructionPermit IssuedLT PRO CONSTRUCTION INC03/05/2024
DOB NOWMechanical SystemsSigned-offKORK INC03/04/2024
DOB NOWConstruction FenceSigned-offKORK INC03/04/2024
DOB NOWConstruction FenceSigned-offKORK INC12/13/2023
DOB NOWGeneral ConstructionPermit IssuedKORK INC11/09/2023
DOB NOWMechanical SystemsSigned-offKORK INC11/03/2023
DOB NOWPlumbingSigned-offJVR PLBG AND HEATING INC10/31/2023
DOB NOWConstruction FenceSigned-offKORK INC07/10/2023
DOB NOWStructuralSigned-offKORK INC07/05/2023
1 project · most recent 04/07/2026
Heating and Air Conditioning Systems Ventilation Systems
FiledStatusContractorScopeMake / Model / Capacity
04/07/2026Signed-offLT PRO CONSTRUCTION INCHeating and Air Conditioning Systems, Ventilation Systems
Heat / Cool
Mitsubishi Electric MXZ-SM36NAMHZ 42,000 BTU · Condensing Unit ×6
MXZ-3C24NAHZ3 30,600 BTU · Condensing Unit ×2
Ventilation
Hampton Bay 7114-01 50 CFM · Exhaust Fan ×16
Delta Breeze SMT150 150 CFM · Exhaust Fan ×8
1 project · most recent 04/07/2026
Sprinkler System
FiledStatusContractorScope
04/07/2026Signed-offDOUG'S PLBG & HTG SERV COSprinkler System
1 project · most recent 04/07/2026
Gas Storm Water/Sanitary
FiledStatusContractorScope
04/07/2026Signed-offPLUMB-IT MECHANICAL INCGas, Storm, Water/Sanitary
6 projects · most recent 04/22/2026
General Wiring
FiledStatusContractorScope
04/22/2026CompleteDAVEN ELECTRIC CORP—
12/01/2025CompleteGOODALL ELECTRIC CORPGeneral Wiring
08/22/2025CancelledGOODALL ELECTRIC CORPGeneral Wiring
05/14/2025CancelledK.A.B. ELECTRIC CORPGeneral Wiring
12/05/2024CompleteGOODALL ELECTRIC CORPGeneral Wiring
02/20/2018CompleteLIFE SPOT ELECTRIC CORP4 meters, 4 new_meters
1 project · most recent 04/07/2026
Steel
FiledStatusContractorScope
04/07/2026Signed-offPLUMB-IT MECHANICAL INCSteel
1 project · most recent 06/28/2023
Fence
FiledStatusContractorScope
06/28/2023Signed-offKORK INCFence
▾Field Inspections (DOB CAP) — 15
DateTypeResultReport
01/28/2025Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
01/24/2025Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
01/07/2025Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
12/20/2024Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
11/20/2024Pass-Final CND-Occupancy InspectionPassView ↗
11/06/2024Pass-Final CND-Occupancy InspectionPassView ↗
10/28/2024Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
10/24/2024Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
10/24/2024Fail-Final CND-Occupancy InspectionFailView ↗
10/08/2024No Access-Final PL - Up to 3 Requested FloorsNo AccessView ↗
08/07/2024Pass-Final CND-Occupancy InspectionPassView ↗
06/03/2024Certified Gas-Gas-Piping-RoughingCertifiedView ↗
05/15/2024Certified Storm Drainage-ST-Piping-RoughingCertifiedView ↗
05/15/2024Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
11/14/2023Pass-Final PL - UndergroundPassView ↗
▾Special Inspection Requirements (DOB NOW) — 129
DateRequirementInspectorRole
04/08/2026Lighting controlsCHRISTIAN LOZADAenergy_progress
04/08/2026Exterior lighting powerCHRISTIAN LOZADAenergy_progress
04/08/2026Insulation placement and R valuesCHRISTIAN LOZADAenergy_progress
04/08/2026Fenestration air leakageCHRISTIAN LOZADAenergy_progress
04/08/2026HVAC-R and service water piping design and insulationCHRISTIAN LOZADAenergy_progress
04/08/2026HVAC-R and service water heating system controlsCHRISTIAN LOZADAenergy_progress
04/08/2026Maintenance informationCHRISTIAN LOZADAenergy_progress
04/08/2026Fenestration areasCHRISTIAN LOZADAenergy_progress
04/08/2026MeteringCHRISTIAN LOZADAenergy_progress
04/08/2026Fire-Resistance Rated ConstructionCHRISTIAN LOZADAprogress
04/08/2026Structural Steel - High Strength BoltingCHRISTIAN LOZADAspecial
04/08/2026MasonryCHRISTIAN LOZADAspecial
04/08/2026Structural Steel - WeldingCHRISTIAN LOZADAspecial
04/08/2026Fire-Resistant Penetrations and JointsCHRISTIAN LOZADAspecial
04/08/2026Concrete - Cast-In-PlaceCHRISTIAN LOZADAspecial
04/08/2026Subsurface Investigations (Borings/Test Pits)INDARDEO PARBHUNATHspecial
04/08/2026Structural Cold-Formed SteelCHRISTIAN LOZADAspecial
04/08/2026Structural Steel - DetailsCHRISTIAN LOZADAspecial
04/08/2026Subgrade InspectionsCHRISTIAN LOZADAspecial
04/08/2026Structural Stability – Alterations of existing buildingsCHRISTIAN LOZADAspecial
04/08/2026Energy Code Compliance InspectionsCHRISTIAN LOZADAprogress
04/08/2026FinalPETER CHOprogress
04/08/2026Lighting in dwelling unitsCHRISTIAN LOZADAenergy_progress
04/08/2026HVAC-R and service water heating equipmentCHRISTIAN LOZADAenergy_progress
04/08/2026Fenestration and door U-factor and product ratingsCHRISTIAN LOZADAenergy_progress
Latest 25 of 129.
▾Documents — 116 on file (BIS + DOB NOW)
▸Plans & Drawings16
▸DOB NOWPlans/Sketch16
08/27/2026B00859858-I1Request digital key ↗
08/27/2026B00859858-S1Request digital key ↗
08/27/2026B00859858-S2Request digital key ↗
Showing 3 of 16 on file for this type
▸Applications & Permits2
▸BISPLAN / WORK APPROVAL APPLICATION1
12/09/2024322115732Open ↗
▸BISBPP-5 - Authorization to the Department of Transportation1
12/13/2023340906050Open ↗
▸Zoning, Tax Lot & Property Records1
▸DOB NOWHouse Number Verification: TOPO Stamp1
08/13/2026B00902146-I1Open ↗
▸Seals & Professional Certifications57
▸DOB NOWProgress Inspector Seal & Signature22
09/15/2026B00902146-S2Open ↗
09/15/2026B00902146-S2Open ↗
09/01/2026B00902146-P4Open ↗
Showing 3 of 22 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature18
09/15/2026B00902146-S2Open ↗
09/01/2026B00902146-P4Open ↗
08/27/2026B00902146-S3Open ↗
Showing 3 of 18 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature16
08/27/2026B00859858-S2Open ↗
08/27/2026B00859858-I1Open ↗
08/27/2026B00859858-S1Open ↗
Showing 3 of 16 on file for this type
▸BISAPPLICANT OWNER SIGNATURE1
12/13/2023340906050Open ↗
▸Safety & Tenant Protection7
▸DOB NOWStreet Tree Checklist3
08/24/2026B00902146-P6Open ↗
08/13/2026B00902146-I1Open ↗
08/13/2026B00902146-P1Open ↗
▸BISSTREET TREES SITE PLAN1
02/21/2025340906050Open ↗
▸BISBPP: STREET TREES SITE PLAN1
12/13/2023340906050Open ↗
▸BISSTREET TREE CHECKLIST1
12/13/2023340906050Open ↗
▸BISSTREET TREE SIGNOFF1
02/21/2025340906050Open ↗
▸Environmental & Asbestos14
▸DOB NOWDEP ACP-5: Asbestos Assessment Report14
08/27/2026B00859858-I1Open ↗
08/27/2026B00859858-S1Open ↗
08/24/2026B00902146-P6Open ↗
Showing 3 of 14 on file for this type
▸Inspections & Test Reports8
▸DOB NOWSOIL REPORT5
08/24/2026B00902146-P6Open ↗
08/13/2026B00902146-P1Open ↗
08/13/2026B00902146-I1Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWTR4 Test Report and Plot Diagram3
08/13/2026B00902146-I1Open ↗
08/13/2026B00902146-S4Open ↗
08/13/2026B00902146-S5Open ↗
▸Approvals, Objections & Sign-offs1
▸BISBPP-8 - Request Items for Builders Pavement Plan Signoff1
02/24/2025340906050Open ↗
▸Filing & Intake Forms1
▸BISEFILING JOB APPLICATION COVER SHEET1
12/13/2023340906050Open ↗
▸Other Documents9
▸DOB NOWProperty Ownership Certification3
08/24/2026B00902146-P6Open ↗
08/13/2026B00902146-P1Open ↗
08/13/2026B00902146-I1Open ↗
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION2
12/09/2024322115732Open ↗
12/09/2024322115732Open ↗
▸DOB NOWAdjoining Owners Notification2
08/13/2026B00902146-S4Open ↗
08/13/2026B00902146-S5Open ↗
▸BISBPP - SUPPORTING DOCUMENTATION1
12/13/2023340906050Open ↗
▸DOB NOWFinal Survey1
08/13/2026B00902146-I1Open ↗