Walk-up cooperative
323 WEST 11 STREET
MANHATTAN · West Village · BIN 1078297
💬 Discuss this project
1897Year Built
5Stories
C6Building Class
R6Zoning
31,206 sfGross Floor Area
44Units
LL97 CoveredRent Stabilized63 Open Violations 61 unresolved · 2 paperwork only ▸
Walk-up cooperative · Owner of record: 323-325-327 WEST 11TH STREET OWNERSCORP. · 8,182 sf lot · 3.81 FAR built · Flood zone X
Locations of Work
ArchitectureFire Protection
Permit Issued — active, not yet Signed-off
RoofUnder Construction12p · 3 filings · 13 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
KINGS GROUP NY404/08/2026
CENTURY MANAGEMENT403/22/2026
323-325-327 WEST 11TH STREET OWNERSCORP.403/22/2026
JERRICK ASSOCIATES103/22/2026
323 W 11 ST OWNERS CORP103/22/2026
BURGUNDY WINE CO. LTD103/22/2026
INTERSYSTEMS203/21/2026
C O DOMINION PROPERTY GROUP LL403/21/2026
DOMINION PROPERTY GROUP203/21/2026
323-325-327 WEST 11TH203/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
RIMKUS107/25/2025
PS ENGINEERS, INC.107/24/2025
RIMKUS NEW YORK PLLC104/04/2025
ASHRAF CORP110/05/2023
GIULIA ALIMONTI101/30/2023
MCSWEENEY ENGINEERING101/06/2023
PHILIP M HARRIS ARCHITECT107/14/2022
CHERNY ARCHITECT PLLC309/17/2021
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
DOMANI CONSULTING103/21/2026
PS ENGINEERS403/21/2026
RIMKUS NEW YORK PLLC203/21/2026
Rigid Structural Design, LLC103/21/2026
JAM CONSULTANTS, INC.203/21/2026
KMA DESIGNS LLC203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
TWO-TONE CONTRACTING CORP.General Contractor407/08/2026
F.G. INTERIOR RENOVATIONGeneral Contractor303/21/2026
JERRICK ASSOCIATES INCGeneral Contractor203/21/2026
A.M.N. CORPORATIONPlumbing207/08/2026
A.L ELECTRICAL CORPGeneral Contractor203/21/2026
KINGS GROUP NY CORPGeneral Contractor104/08/2026
CEPRINE CONSTRUCTION INCGeneral Contractor107/08/2026
ALEXANDER EUGENEElectrical103/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
RIMKUS NEW YORK, PLLC8123104/04/2025
ATLAS ATC ENGINEERING INC8011101/30/2023
ARCO ENGINEERING PC3769101/06/2023
CHERNY ARCHITECT PLLC1925309/17/2021
Building Lifecycle
All (116)Filed (11)Permit Issued (11)Signed Off (5)Violation (60)Inspection (5)Objection (2)Special Inspection (22)
08/06/2026
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
07/20/2026
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
07/16/2026
Signed off — Alteration
INSTALLATION OF HEAVY DUTY SIDEWALK SHED. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION, ALL WORK TO COMPLY WITH CHAPTER 33 OF NYCBC.
M01261434-I1
04/25/2026
Violation issued (ECB, open)
Construction
04/21/2026
Permit issued — General Construction
M01180340-I1-GC
07/25/2025
Filed — Alteration
INSTALLATION OF HEAVY DUTY SIDEWALK SHED. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION, ALL WORK TO COMPLY WITH CHAPTER 33 OF NYCBC.
M01261434-I1
07/25/2025
Permit issued — Sidewalk Shed
M01261434-I1-SH
07/25/2025
Permit issued — Supported Scaffold
M01248521-I1-SF
07/24/2025
Filed — Alteration
M01248521-I1
07/21/2025
Permit issued — Suspended Scaffold
M01248517-I1-SC
07/16/2025
Filed — Alteration
FILE SUSPENDED SCAFFOLD OUTRIGGER SYSTEMS FOR FACADE RESTORATION AND INSPECTION.
M01248517-I1
07/13/2025
Special inspection requirement — Alternative Materials - OTCR Buildings Bulletin Number
FRANCISCO PEREZ
07/11/2025
Special inspection requirement — Alternative Materials - OTCR Buildings Bulletin Number
FRANCISCO PEREZ
06/20/2025
Violation issued (HPD, open)
C
06/20/2025
Violation issued (HPD, open)
B
06/20/2025
Violation issued (HPD, open)
B
06/20/2025
Violation issued (HPD, open)
B
06/20/2025
Violation issued (HPD, open)
A
06/20/2025
Violation issued (HPD, open)
B
06/20/2025
Violation issued (HPD, open)
B
06/20/2025
Violation issued (HPD, open)
C
05/18/2025
Violation issued (HPD, open)
A
05/18/2025
Violation issued (HPD, open)
A
05/18/2025
Violation issued (HPD, open)
A
05/18/2025
Violation issued (HPD, closed)
B
04/22/2025
Permit issued — General Construction
M01180340-I1-GC
04/04/2025
Filed — Alteration
M01180340-I1
01/14/2025
Violation issued (HPD, open)
A
01/14/2025
Violation issued (HPD, open)
B
01/14/2025
Violation issued (HPD, open)
B
01/14/2025
Violation issued (HPD, closed)
C
05/10/2024
Violation issued (HPD, open)
B
05/10/2024
Violation issued (HPD, closed)
C
05/10/2024
Violation issued (HPD, closed)
C
05/10/2024
Violation issued (HPD, open)
B
05/10/2024
Violation issued (HPD, open)
B
05/10/2024
Violation issued (HPD, open)
B
05/10/2024
Violation issued (HPD, open)
C
04/29/2024
Violation issued (HPD, closed)
C
04/29/2024
Violation issued (HPD, closed)
C
12/01/2023
Signed off — Alteration
M00936170-I1
10/10/2023
Signed off — Alteration
Air conditioning condenser unit is being relocated from the side of the building to the roof. no change to use, egress or occupancy.
M08037783-I1
10/05/2023
Filed — Alteration
M00936170-I1
10/05/2023
Permit issued — Sidewalk Shed
M00936170-I1-SH
08/08/2023
Permit issued — Mechanical Systems
M08037783-I1-MS
06/14/2023
Violation issued (ECB, closed)
Construction
03/17/2023
Permit issued — General Construction
M00800840-I1-GC
01/30/2023
Filed — Alteration
M00800840-I1
01/06/2023
Filed — Alteration
Air conditioning condenser unit is being relocated from the side of the building to the roof. no change to use, egress or occupancy.
M08037783-I1
01/06/2023
Signed off — Alteration
RENOVATION OF APT 4W ON 4TH FL, PARTITION WORK PER PLANS. INSTALLATION OF NEW ELECTRIC A/C SYSTEM WITH DUCTWORK IN APT. 4W AND CONDENSING UNIT ON A STEEL BRACKET ATTACHED TO BRICK MASONRY ROOF PARAPET WALL. PL WORK WILL BE FILED SUBSEQUENTLY.
M00509074-I1
01/05/2023
Signed off — Alteration
RENOVATION OF APT 4W ON 4TH FL, PARTITION WORK PER PLANS. INSTALLATION OF NEW ELECTRIC A/C SYSTEM WITH DUCTWORK IN APT. 4W AND CONDENSING UNIT ON A STEEL BRACKET ATTACHED TO BRICK MASONRY ROOF PARAPET WALL. PL WORK WILL BE FILED SUBSEQUENTLY.
M00509074-S1
11/16/2022
Special inspection requirement — Maintenance information
Michael McSweeney
11/10/2022
Special inspection requirement — Mechanical Systems
JOSE MANTRANA
11/10/2022
Special inspection requirement — Energy Code Compliance Inspections
Michael McSweeney
11/10/2022
Special inspection requirement — Final
Michael McSweeney
07/14/2022
Filed — Alteration
M00764483-I1
06/01/2022
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
05/24/2022
Permit issued — Plumbing
M00509074-S1-PL
05/21/2022
Inspection — Fail-Final PL - Up to 3 Requested Floors
Fail
View inspection ↗
09/30/2021
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
Latest 60 of 116 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionPermit IssuedTWO-TONE CONTRACTING CORP.04/21/2026
DOB NOWSidewalk ShedSigned-offKINGS GROUP NY CORP07/25/2025
DOB NOWSupported ScaffoldPermit IssuedTWO-TONE CONTRACTING CORP07/25/2025
DOB NOWSuspended ScaffoldPermit IssuedTWO-TONE CONTRACTING CORP07/21/2025
DOB NOWGeneral ConstructionPermit IssuedTWO-TONE CONTRACTING CORP04/22/2025
DOB NOWSidewalk ShedSigned-offCEPRINE CONSTRUCTION INC10/05/2023
DOB NOWMechanical SystemsSigned-offF.G. INTERIOR RENOVATION08/08/2023
DOB NOWGeneral ConstructionPermit IssuedGE 2A CONSTRUCTION03/17/2023
DOB NOWPlumbingSigned-offA.M.N. CORPORATION05/24/2022
DOB NOWPlumbingSigned-offA.M.N. CORPORATION07/20/2021
DOB NOWMechanical SystemsSigned-offA.L. ELECTRICAL CORP07/06/2021
BISPLISSUEDDOUG'S PLBG & HTG SERV CO04/05/2023
BISPLISSUEDA.M.N. CORPORATION04/04/2019
BISOTISSUEDA.L ELECTRICAL CORP03/15/2019
BISOTISSUEDA.L ELECTRICAL CORP09/21/2018
BISPLISSUEDORBIT PLBG & HTG INC09/10/2018
BISOTISSUEDA.L ELECTRICAL CORP09/10/2018
BISOTISSUEDDOVEKS INC05/18/2018
BISPLISSUEDPLUMBING & HTG DOCTOR INC01/27/2017
BISOTISSUEDJWBUILT, INC07/21/2016
BISPLISSUEDA.M.N. CORPORATION02/02/2015
BISOTISSUEDDOVEKS INC10/29/2014
BISOTISSUEDBIG BEAR CUSTOM BUILD,INC10/03/2014
BISEQISSUEDINTERSYSTEMS CORP.09/12/2008
BISEQISSUEDRS CONTRACTING INC05/22/2008
BISOTISSUEDA W R GROUP INC04/10/2006
BISPLISSUEDPINNACLE PLBG & HTG CORP10/13/2005
BISOTISSUEDTENTA CORP06/02/2005
BISPLISSUEDEVERGREEN MECHANICAL CORP11/15/2002
BISEQISSUEDYORK SCAFFOLD EQUIPMENT CORP.07/17/1995
BISPLISSUEDWARD MECH CORP03/01/1993
BISOTISSUEDBRI-VEC ENTERPRISES INC11/23/1992
4 projects · most recent 11/05/2025
FiledStatusContractorScope
11/05/2025CompleteGOODALL ELECTRIC CORP—
07/28/2025Permit IssuedHIGH QUALITY ELEC.OF NYC—
10/05/2023CompleteBOROWIDE ELECT'L CONTR'S—
03/29/2021CompleteNASH ELECTRIC SERVICES IN—
1 project · most recent 07/25/2025
Sidewalk Shed
FiledStatusContractorScope
07/25/2025Signed-offKINGS GROUP NY CORPSidewalk Shed
1 project · most recent 07/16/2025
Suspended Scaffold
FiledStatusContractorScope
07/16/2025Permit IssuedTWO-TONE CONTRACTING CORPSuspended Scaffold
1 project · most recent 07/16/2025
Suspended Scaffold (SC)
FiledStatusContractorScope
07/16/2025Permit IssuedTWO-TONE CONTRACTING CORPSuspended Scaffold (SC)
▾Field Inspections (DOB CAP) — 5
DateTypeResultReport
08/06/2026Pass-Final PL - Up to 3 Requested FloorsPassView ↗
07/20/2026Pass-Final PL - Up to 3 Requested FloorsPassView ↗
06/01/2022Pass-Final PL - Up to 3 Requested FloorsPassView ↗
05/21/2022Fail-Final PL - Up to 3 Requested FloorsFailView ↗
09/30/2021Pass-Final PL - Up to 3 Requested FloorsPassView ↗
▾Special Inspection Requirements (DOB NOW) — 22
DateRequirementInspectorRole
07/13/2025Alternative Materials - OTCR Buildings Bulletin NumberFRANCISCO PEREZspecial
07/11/2025Alternative Materials - OTCR Buildings Bulletin NumberFRANCISCO PEREZspecial
11/16/2022Maintenance informationMichael McSweeneyenergy_progress
11/10/2022Mechanical SystemsJOSE MANTRANAspecial
11/10/2022Energy Code Compliance InspectionsMichael McSweeneyprogress
11/10/2022FinalMichael McSweeneyprogress
09/21/2021Fire-Resistant Penetrations and JointsVladimir Lukyanov-Chernyspecial
05/19/2021Lighting in dwelling unitsVladimir Lukyanov-Chernyenergy_progress
05/19/2021Fire-Resistant Penetrations and JointsVladimir Lukyanov-Chernyspecial
05/19/2021Lighting controlsVladimir Lukyanov-Chernyenergy_progress
05/19/2021Maintenance informationVladimir Lukyanov-Chernyenergy_progress
05/19/2021Fire-Resistance Rated ConstructionVladimir Lukyanov-Chernyprogress
05/19/2021HVAC-R and service water heating equipmentVladimir Lukyanov-Chernyenergy_progress
05/19/2021Air barrier - visual inspectionVladimir Lukyanov-Chernyenergy_progress
05/19/2021HVAC-R and service water heating system controlsVladimir Lukyanov-Chernyenergy_progress
05/19/2021Fenestration and door U-factor and product ratingsVladimir Lukyanov-Chernyenergy_progress
05/19/2021HVAC-R and service water piping design and insulationVladimir Lukyanov-Chernyenergy_progress
05/19/2021Insulation placement and R valuesVladimir Lukyanov-Chernyenergy_progress
05/19/2021Fenestration areasVladimir Lukyanov-Chernyenergy_progress
05/19/2021Fenestration air leakageVladimir Lukyanov-Chernyenergy_progress
04/22/2021FinalVladimir Lukyanov-Chernyprogress
04/22/2021Mechanical SystemsVladimir Lukyanov-Chernyspecial
▾Documents — 215 on file (BIS + DOB NOW)
▸Plans & Drawings11
▸DOB NOWPlans/Sketch11
09/03/2026M00509074-I1Request digital key ↗
09/03/2026M00509074-P1Request digital key ↗
09/02/2026M00764483-I1Request digital key ↗
Showing 3 of 11 on file for this type
▸Applications & Permits37
▸BISWORK PERMIT APPLICATION16
04/06/2023140508038Open ↗
08/27/2019123378282Open ↗
04/05/2019123439582Open ↗
Showing 3 of 16 on file for this type
▸BISPLAN / WORK APPROVAL APPLICATION14
03/08/2023140508038Open ↗
03/05/2023140508038Open ↗
01/25/2023140508038Open ↗
Showing 3 of 14 on file for this type
▸DOB NOWLPC Approval/Permit7
09/03/2026M00509074-I1Open ↗
09/03/2026M00509074-P1Open ↗
08/15/2026M00509074-S1Open ↗
Showing 3 of 7 on file for this type
▸Seals & Professional Certifications46
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION14
11/19/2019123439582Open ↗
11/19/2019123378282Open ↗
06/27/2019123378282Open ↗
Showing 3 of 14 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature10
09/03/2026M00509074-I1Open ↗
09/03/2026M00509074-S1Open ↗
09/03/2026M00509074-P1Open ↗
Showing 3 of 10 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature5
09/01/2026M00509074-I1Open ↗
08/26/2026M00509074-S1Open ↗
08/25/2026M01248517-I1Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWProgress Inspector Seal & Signature5
09/01/2026M00509074-I1Open ↗
09/01/2026M00509074-I1Open ↗
08/24/2026M08037783-I1Open ↗
Showing 3 of 5 on file for this type
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY3
07/18/2018140785229Open ↗
07/20/2016140508038Open ↗
10/02/2014140262409Open ↗
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION3
07/18/2018140785229Open ↗
07/20/2016140508038Open ↗
10/02/2014140262409Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT3
07/18/2018140785229Open ↗
07/20/2016140508038Open ↗
10/02/2014140262409Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM1
09/12/2008110339250Open ↗
▸BISPC FULL REPORT1
02/11/2008110090357Open ↗
▸BISPROFESSIONAL CERTIFIED CHECKLIST1
09/12/2008110339250Open ↗
▸Trade Schedules & Equipment9
▸BISSCHEDULE B - PLUMBING3
01/25/2023140508038Open ↗
07/18/2018140785229Open ↗
07/20/2016140508038Open ↗
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE3
11/29/2018123439582Open ↗
05/07/2018123439582Open ↗
09/18/2014122119536Open ↗
▸BISSELF-CERT PLUMBING NOTICE2
07/17/2015122119536Open ↗
03/03/2015122119536Open ↗
▸BISPLUMBING (PL) SIGNOFF1
12/03/2021140785229Open ↗
▸Safety & Tenant Protection4
▸BISTenant Protection Plan and Notes4
06/27/2019123378282Open ↗
05/07/2018123439582Open ↗
07/18/2018140785229Open ↗
Showing 3 of 4 on file for this type
▸Environmental & Asbestos15
▸DOB NOWDEP ACP-5: Asbestos Assessment Report7
09/03/2026M00509074-I1Open ↗
09/03/2026M00509074-P1Open ↗
09/02/2026M00764483-I1Open ↗
Showing 3 of 7 on file for this type
▸BISASBESTOS: CERTIFICATION (DEP ACP5)6
06/27/2019123378282Open ↗
07/18/2018140785229Open ↗
05/07/2018123439582Open ↗
Showing 3 of 6 on file for this type
▸BISASBESTOS EXEMPTION CERTIFICATION LETTER1
09/12/2008110339250Open ↗
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'1
02/11/2008110090357Open ↗
▸Energy Compliance19
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS7
11/19/2019123439582Open ↗
11/19/2019123378282Open ↗
06/27/2019123378282Open ↗
Showing 3 of 7 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS4
11/19/2019123439582Open ↗
11/19/2019123378282Open ↗
09/23/2015122119536Open ↗
Showing 3 of 4 on file for this type
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY2
07/18/2018140785229Open ↗
10/02/2014140262409Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY FOR ENERGY CODE PROGRESS INSPECTIONS2
07/18/2018140785229Open ↗
10/02/2014140262409Open ↗
▸BISNYCECC EXEMPTION1
07/20/2016140508038Open ↗
▸BISAS-BUILT ENERGY ANALYSIS (EN2)1
12/03/2021140785229Open ↗
▸DOB NOWPreliminary Commissioning Report Certification1
08/13/2026M08037783-I1Open ↗
▸DOB NOWEN2: As Built Energy Analysis.1
09/03/2026M00509074-I1Open ↗
▸Inspections & Test Reports5
▸BISTECHNICAL REPORT: RESPONSIBILITY3
07/18/2018140785229Open ↗
07/20/2016140508038Open ↗
10/02/2014140262409Open ↗
▸BISFIRE-RESISTANT PENETRATIONS AND JOINTS (FIRESTOP)1
12/03/2021140785229Open ↗
▸BISPOST-INSTALLED ANCHORS1
12/03/2021140785229Open ↗
▸Approvals, Objections & Sign-offs27
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST9
04/07/2023140508038Open ↗
12/03/2021140785229Open ↗
11/19/2019123439582Open ↗
Showing 3 of 9 on file for this type
▸BISLANDMARKS APPROVAL9
08/27/2019123378282Open ↗
07/18/2018140785229Open ↗
05/08/2018123439582Open ↗
Showing 3 of 9 on file for this type
▸BISADMINISTRATIVE OBJECTIONS2
09/12/2008110339250Open ↗
02/11/2008110090357Open ↗
▸BISSUPERSEDING LETTER2
04/06/2023140508038Open ↗
09/24/2018123439582Open ↗
▸BISLETTERS - SUPPORTING DOCUMENTATION2
09/23/2015122119536Open ↗
03/14/2011110090357Open ↗
▸BISLANDMARKS SIGNOFF2
12/03/2021140785229Open ↗
12/12/2017140508038Open ↗
▸BISFINAL1
12/03/2021140785229Open ↗
▸Cost, Insurance & Ownership17
▸BISCOST AFFIDAVIT14
11/19/2019123439582Open ↗
11/19/2019123378282Open ↗
06/27/2019123378282Open ↗
Showing 3 of 14 on file for this type
▸BISHIC LICENSE OR AFFIDAVIT2
11/03/2014122119536Open ↗
05/22/2008110090357Open ↗
▸BISCOST AFFIDAVIT (FINAL): PW31
12/03/2021140785229Open ↗
▸Filing & Intake Forms19
▸BISBOROUGH INTAKE FORM6
11/19/2019123439582Open ↗
11/19/2019123378282Open ↗
03/14/2019123439582Open ↗
Showing 3 of 6 on file for this type
▸BISEFILING COVER SHEET5
06/27/2019123378282Open ↗
05/07/2018123439582Open ↗
09/18/2014122119536Open ↗
Showing 3 of 5 on file for this type
▸BISADDITIONAL INFORMATION5
03/08/2023140508038Open ↗
06/27/2019123378282Open ↗
12/05/2018123439582Open ↗
Showing 3 of 5 on file for this type
▸BISEFILING JOB APPLICATION COVER SHEET3
07/18/2018140785229Open ↗
07/20/2016140508038Open ↗
10/02/2014140262409Open ↗
▸Other Documents6
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION2
02/01/2023140508038Open ↗
02/10/2015140262409Open ↗
▸BISPRELIMINARY1
12/03/2021140785229Open ↗
▸DOB NOWCalculations1
08/13/2026M01248517-I1Open ↗
▸DOB NOWProof of Historic Building1
08/13/2026M00800840-I1Open ↗
▸DOB NOWManufacturer's Specifications1
08/13/2026M01248517-I1Open ↗